Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Interior alterations. Demo walls, ceiling, flooring, plumbing and electrical fixtures. Install walls, ceiling, lighting, plumbing fixtures, painting and floor finishing. Install new hvac system. Replace ramp. Date: October 22, 2013 Permit type: Alteration | Permit status: Routed for review | Permit id: Bb-201305950 | |||||
SCORE 86 956 mlk blvd Date: September 29, 2011 Contractor: Charlton Plumbing Permit type: Plumbing | Permit status: Accepted | Permit id: Bp-201102800 | |||||
SCORE 65 Replacing heating and cooling system. Date: September 26, 2011 Contractor: Precision Air Services Inc Permit type: Hvac | Permit status: Issued | Permit id: Bm-201102289 | |||||
SCORE 70 Tenant finish for take-out restaurant (zoning comment: as per planning approval on 10 6 required parking 2 spaces) installing (4) switches, (8) lights (2) signs circuits, (2) outlets Date: September 14, 2011 Contractor: C. Reeves Electric Permit type: Electrical | Permit status: Issued | Permit id: Be-201106583 |