Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 86 Roof mount residential solar pv for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: April 2, 2015 Contractor: Robin Wilhelm Permit type: Electrical : 8003 - | Permit status: Permit finaled | Completion date: April 20, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 88 Roof mount residential solar pv for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: April 2, 2015 Contractor: Killion Energy Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 20, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 86 23 sqft re-roof to (e) sfd. If a re-roof project is proposed, the following specifications apply. Existing roofing material asphalt shingles proposed roofing material ashpalt shingles manufacturer ownes corning brand and model tru def duration color (if cool roof required) amber crrc 0890-0009 built-up roofing assembly system number per attached listing report (if applicable) n a specific exemption from cool roof requirements (if applicable) n a required building inspector field verification (if applicable) yes note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Addn | Permit status: Completed | Completion date: July 12, 2017 | Permit id: Pds2017-Resalt- | |||||
Final Date: April 16, 2015 Permit status: Pass | Permit id: Pds2015-Resalt- |