Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 65 3rd fl-bedroom:remove washer/dryer and build closet. Study: remodel wet bar & move w/d in adjacent closet. 2nd fl- bath: replace shower encl, move toilet & radiator, tile wall & floor. Study: remove wet bar and build closet. Infill adjacent closet door. Bedroom: create new closet door. 1st fl-build closet under stair case. All floors-install new recessed light fixtures and ceiling fans. Permit type: Addition/alteration | Completion date: January 26, 2015 | Current use: One-family | Parcel: 2485 | |||||
SCORE 100 Excavation ![]() ![]() Permit id: Exc13913 | |||||
SCORE 65 3rd fl-bedroom:remove washer dryer and build closet. Study: remodel wet bar & move w d in adjacent closet. 2nd fl- bath: replace shower encl, move toilet & radiator, tile wall & floor. Study: remove wet bar and build closet. Infill adjacent closet door. Bedroom: create new closet door. 1st fl-build closet under stair case. All floors-install new recessed light fixtures and ceiling fans. Permit type: Addition/alteration | Completion date: January 26, 2015 | Current use: One-family | Permit id: 0 | Parcel: 2485 |