Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Hvac change out - fau or wall heater - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: May 11, 2015 Contractor: A S I Hastings Inc Permit type: Mechanical - hvac change out | Permit status: Completed | Permit id: Pds2015-Resalt- | |||||
SCORE 100 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: August 26, 2015 Contractor: Solaire Energy Systems Inc Permit type: Residential alterati | Permit status: Open | Permit id: Pds2015-Resalt- | |||||
SCORE 95 Roof mount residential solar pv for existing sfd no. Of modules: 7 no. Of inverters:1 total system size in kilowatts: 2. 3 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: July 27, 2012 Contractor: Solaire Energy Systems Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 397-392-05-00 |