Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
2nd extension of building permit # b1100333; valid until 12/8/2012. Date: August 8, 2012 Client: Ddot | Applicant: Ddot | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1212720 | |||||
Ddot construction of concrete and steel pedestrian bicycle bridge and ramps along the metropolitian branch trail over csx at the rhode island ave metro station. Date: August 8, 2013 Client: Government Of The Distict Of Columbia | Applicant: Ddot Ddot | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1309721 | |||||
SCORE 88 Ddot construction of concrete and steel pedestrian bicycle bridge and ramps along the metropolitian branch trail over csx at the rhode island ave metro station. Date: August 8, 2013 Contractor: Ddot Ddot Client: Government Of The Distict Of Columbia | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1309721 | |||||
SCORE 56 Changing out all concrete ceiling panels over the station. We are also upgrading the lighting at the station that is connected to the ceiling panels being removed. Date: November 15, 2016 Contractor: Kenny Spain Client: Wmata | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700176 | |||||
SCORE 98 2nd extension of building permit # b1100333; valid until 12/8/2012. Date: August 8, 2012 Contractor: Ddot Client: Ddot | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1212720 |