Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Plan review Date: March 9, 2012 Permit status: Closed - approved | Permit id: Ba-201201111 | |||||
Add low voltage for audio- Date: February 7, 2012 Permit type: Low voltage | Permit status: Issued | Permit id: Be-201201034 | |||||
Add low voltage -5299 sq ftg. Date: February 3, 2012 Permit type: Low voltage | Permit status: Issued | Permit id: Be-201200934 | |||||
SCORE 81 Reference bp# bb-201104532 3. 5 upstairs 3 main floor 2. 0ah basement install dryer box 2 gal water heaters need combustion air for furnaces in garage and strap bath fans. Need 6" hard pipe and 2- 6" sidewall caps. Install one exhaust at the top and bottom. Gas drops 2 furnaces 2 gal water heaters gas range 3 fireplaces gas grille 2 gas lanterns Date: January 10, 2012 Contractor: Blue Horizon Usa Permit type: Hvac | Permit status: Issued | Permit id: Bm-201200086 | |||||
SCORE 67 Install new plumbing system Date: December 7, 2011 Contractor: Mills Plumbing Permit type: Plumbing | Permit status: Issued | Permit id: Bp-201103541 | |||||
SCORE 98 Installation of overhead temporary power pole for use during construction Date: November 22, 2011 Contractor: Wade Electric Inc Permit type: Electrical | Permit status: Closed - passed | Permit id: Be-201108344 | |||||
SCORE 86 Plumbing work-sewer plug Date: November 3, 2011 Contractor: Phillip Pettis Homes Inc Permit type: Plumbing | Permit status: Issued | Permit id: Bp-201103186 | |||||
Plan review Date: October 11, 2011 Permit status: Closed - approved | Permit id: Ba-201106065 | |||||
SCORE 86 Demo to sfr Date: September 28, 2011 Contractor: Phillip Pettis Homes Inc Permit type: Demolition | Permit status: Issued | Permit id: Bb-201104529 | |||||
SCORE 86 Construction of a new sfr (raac) Date: September 28, 2011 Contractor: Phillip Pettis Homes Inc Permit type: New | Permit status: Closed | Permit id: Bb-201104532 |