Remove debris from interior/exterior areas. Remove drop ceilings, non-loadbearing walls and damaged drywall. Plot existing water/sewer lines, check operational viability. Stop/repair roof leaks. Date: December 5, 2014 Applicant: John Snedden | Permit type: Demolition | Permit status: Permit issued | Permit id: D1500155 | |||||
SCORE 96 Plumbing and gas Date: June 30, 2015 Contractor: Martin R Saia Permit status: Completed | Permit id: P1507113 | |||||
SCORE 96 Electrical Date: June 26, 2015 Contractor: James W Lasher Permit status: Completed | Permit id: E1506973 | |||||
SCORE 81 Adding fire alarm system Date: July 13, 2015 Contractor: Harrison Client: Harrison | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1509572 | |||||
SCORE 62 The proposed plan is to install a 15 barrel production brewery and tasting room. The plan uses existing electrical, plumbing and mechanical systems modifying and upgrading them to execute the plan. The existing exterior parking area will be modified to include regular and handicap parking spaces. Date: June 25, 2015 Contractor: John Snedden Permit type: Alteration and repair | Permit status: Completed | Permit id: B1502235 | |||||
SCORE 96 Electrical Date: June 26, 2015 Contractor: James W Lasher Permit status: Completed | Permit id: E1506973 | |||||
SCORE 96 Plumbing and gas Date: June 30, 2015 Contractor: Martin R Saia Permit status: Completed | Permit id: P1507113 | |||||
SCORE 96 Boiler Date: August 13, 2015 Contractor: Martin R Saia Permit status: Permit issued | Permit id: Fb1500142 | |||||
SCORE 62 Remove debris from interior/exterior areas. Remove drop ceilings, non-loadbearing walls and damaged drywall. Plot existing water/sewer lines, check operational viability. Stop/repair roof leaks. Date: December 5, 2014 Contractor: John Snedden Permit type: Demolition | Permit status: Permit issued | Permit id: D1500155 | |||||
SCORE 56 Install 1 sunpower 3 solar panels on roof of existing warehouse. Max height from room less than 2. System size: 57 kw. Date: June 9, 2017 Client: Right Proper Brewing Company | Permit type: Solar system | Permit status: Completed | Permit id: Sol1700492 | |||||
Electrical Date: July 7, 2017 Permit status: Completed | Permit id: E1708040 | |||||
SCORE 86 Electrical Date: February 25, 2015 Contractor: Eric A Caldwell Permit status: Completed | Permit id: E1503608 | |||||