Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 71 Install material lift,roll-up door,acoustical ceiling, carpet and paint. Applicant: Watson Joe | Permit status: Finaled | Completion date: October 19, 2000 | Permit id: 0001100011 | |||||
SCORE 86 2 4 amp,1 225,1 5 hp motor,17 1 v circuits,79 branch circuits Date: April 20, 2000 Contractor: Belco Electric Inc Applicant: Belco Electric Inc | Permit status: Finaled | Completion date: October 19, 2000 | Permit id: 0004200008 | |||||
SCORE 71 Install material lift, roll-up door, acoustical ceiling, carpet and paint. Engineer: Environ Architecture | Applicant: Watson Joe | Permit status: Finaled | Completion date: October 19, 2000 | Expiration date: September 16, 2000 | Permit id: 1100011 | |||||
SCORE 86 2 4 amp, 1 225,1 5 hp motor, 17 1 v circuits, 79 branch circuits Date: April 20, 2000 Contractor: Belco Electric Inc Applicant: Belco Electric Inc | Permit status: Finaled | Completion date: October 19, 2000 | Expiration date: October 17, 2000 | Permit id: 4200008 | |||||
SCORE 98 Replace plaster ceiling located in stairwell Engineer: Integrated Design Services | Applicant: Khayat Zaim | Permit status: Permisud | Expiration date: March 19, 2002 | Permit id: 106200005 | |||||
SCORE 61 Ada restroom upgrade basement. Provide auto. Sliding door in dining room Engineer: Ray Sein* | Applicant: Blaauw Glen | Permit status: Finaled | Completion date: May 23, 2002 | Expiration date: August 20, 2002 | Permit id: 112170053 | |||||
SCORE 95 Non structural-cosmetic repair northridge eq damage inc int& ext plaster/stucco repair, 40-45 of epoxy injection, ceram ic tile replacement Engineer: Donald Lee | Applicant: Khayat Xnmn | Permit status: Permisud | Expiration date: July 22, 2002 | Permit id: 201230032 | |||||
SCORE 61 Install (2) new electric vehicle chargers(1 conductive, 1 inductive); (2) new 40a, 240v circuits on existing panel. Date: February 9, 2000 Contractor: Dept. Of Water And Power City Of L Applicant: Mark Zumwalt | Permit status: Permisud | Expiration date: August 7, 2000 | Permit id: 1310001 | |||||
SCORE 61 Ada restroom upgrade basement. Replace (2) lighting fixtures Date: February 21, 2002 Contractor: Inc. New Creation Engineering And Builde Engineer: Ray Sein* | Applicant: Blaauw Glen | Permit status: Permisud | Expiration date: August 20, 2002 | Permit id: 202210014 | |||||
SCORE 99 Seismic upgrade to existing structure, shell & core only. Engineer: Co Architects | Applicant: De La Cal Jorge | Permit status: Finaled | Completion date: January 29, 2008 | Expiration date: November 15, 2007 | Permit id: 608230066 | |||||
SCORE 99 Interior improvements for 1913 building-accessibility impro. Applicant: Jorge De La Cal | Permit status: Finaled | Completion date: April 9, 2009 | Expiration date: April 22, 2008 | Permit id: 707030084 | |||||
SCORE 95 Fire sprinkler Applicant: Brown Maxine | Permit status: Finaled | Completion date: April 9, 2009 | Expiration date: November 16, 2008 | Permit id: 805150055 | |||||
SCORE 99 T. I. Work to existing exhibit room Applicant: Alfred Carrasquillo | Permit status: Finaled | Completion date: February 4, 2009 | Expiration date: August 2, 2009 | Permit id: 810140075 | |||||
SCORE 95 New pre-action sprinkler system Applicant: Maxine Brown | Permit status: Finaled | Completion date: April 9, 2009 | Expiration date: April 25, 2009 | Permit id: 810270022 | |||||
SCORE 99 Voluntary seismic upgrade unit 1 bldg tiolet & access. Impv. Micropiles & fiber wrap are deferred submittals Applicant: De La Cal Jorge | Permit status: Finaled | Completion date: June 1, 2011 | Expiration date: July 9, 2010 | Permit id: 812230062 | |||||
SCORE 100 Fire sprinklers Applicant: Jonathan Garcia | Permit status: Finaled | Completion date: June 1, 2011 | Expiration date: November 1, 2009 | Permit id: 905040067 | |||||
SCORE 65 Installation of age of mammals exhibit Engineer: Jacq. Vinkler John A. Martin | Applicant: John A. Martin | Permit status: Finaled | Completion date: August 5, 2011 | Expiration date: December 1, 2010 | Permit id: 905190054 | |||||
SCORE 99 Exhibit installation in the north hall of the museums 1913 bldg at main & 2nd levels, including coring & anchor installation and new hanging specimens. Engineer: Jacq. Vinkler John A. Martin | Applicant: John A. Martin | Permit status: Finaled | Completion date: June 11, 2010 | Expiration date: December 1, 2010 | Permit id: 911250019 | |||||
T. I. For retail store w existing museum to include partition Date: February 16, 2010 Value: $40,000 Applicant: Same As Owner | Permit status: Finaled | Completion date: May 14, 2010 | Expiration date: February 16, 2011 | Permit id: 912220032 | |||||
SCORE 99 Interior remodel of 2 existing restrooms. Engineer: Co Arch. Shannon Binger | Applicant: Shanon Binger | Permit status: Finaled | Completion date: July 13, 2010 | Expiration date: January 20, 2011 | Permit id: 1001120016 | |||||
SCORE 100 Add 2 sprinkler heads to building Applicant: Tim Tipton | Permit status: Finaled | Completion date: June 1, 2011 | Expiration date: January 21, 2011 | Permit id: 1001210024 | |||||
SCORE 99 Interior remodel to existing cafe new partition walls&door Engineer: Co Architects | Applicant: Shanon Binger | Permit status: Finaled | Completion date: April 22, 2010 | Expiration date: March 9, 2011 | Permit id: 1002170085 | |||||
SCORE 69 Installation of glass hand rail on exhibit locations. Engineer: Co Architects | Applicant: Whittier Brian | Permit status: Finaled | Completion date: June 22, 2010 | Expiration date: April 5, 2011 | Permit id: 1004050010 | |||||
SCORE 99 Add (4) sprinklers in service yard building Applicant: Advance Fire Protection | Permit status: Finaled | Completion date: June 1, 2011 | Expiration date: April 19, 2011 | Permit id: 1004190019 | |||||
SCORE 99 Remove (e) temporary ramp at south entrance and build new ramp that provides access from grade to the main level. Engineer: Co Architects | Applicant: Carrasquillo Alfred | Permit status: Finaled | Completion date: July 5, 2011 | Expiration date: July 29, 2011 | Permit id: 1004270019 | |||||
Install 1 sign. Date: May 12, 2010 Value: $1,500 Applicant: Same As Owner | Permit status: Finaled | Completion date: May 14, 2010 | Expiration date: May 12, 2011 | Permit id: 1005120038 | |||||
SCORE 99 New car park sprinkler system (139) Applicant: Advance Fire Protection | Permit status: Finaled | Completion date: June 1, 2011 | Expiration date: June 24, 2011 | Permit id: 1006240022 | |||||
SCORE 99 The project consists of the exhibit installation in the south hall of the museums 1913 bldg @ 2nd level. This includes coring and anchor installation & new hanging Engineer: John A Martin And Associates | Applicant: Carrasquillo Alfred | Permit status: Permisud | Expiration date: November 9, 2011 | Permit id: 1008190047 | |||||
SCORE 99 Relocation of a dinosuar sculpture and 8fence 458 linear ft Engineer: Co Architects | Applicant: Li Tinna | Permit status: Finaled | Completion date: August 5, 2011 | Expiration date: January 26, 2012 | Permit id: 1009290033 | |||||
SCORE 99 New ramp install for accessing the main level. New door & ramp install at ground level. Handrails & guardrails install at existing monumental stairs. Engineer: Co Architects | Applicant: Li Tinna | Permit status: Finaled | Completion date: July 3, 2012 | Expiration date: August 2, 2012 | Permit id: 1011020018 | |||||
SCORE 99 8 high permimeter fence & gates Engineer: Co Architects | Applicant: Li Tinna | Permit status: Finaled | Completion date: May 8, 2012 | Expiration date: August 2, 2012 | Permit id: 1011020020 | |||||
SCORE 99 Wooden deck & bridges Engineer: Co Architects | Applicant: Li Tinna | Permit status: Finaled | Completion date: March 20, 2012 | Expiration date: August 2, 2012 | Permit id: 1011020021 | |||||
SCORE 99 Retaining walls (4-8) Engineer: Co Architects | Applicant: Li Tinna | Permit status: Finaled | Completion date: May 8, 2012 | Expiration date: August 2, 2012 | Permit id: 1011020026 | |||||
SCORE 99 Install (8) rebar arbor Engineer: Co Architects | Applicant: Li Tinna | Permit status: Finaled | Completion date: March 21, 2012 | Expiration date: August 2, 2012 | Permit id: 1011020027 | |||||
SCORE 99 Pond dia Engineer: Co Architects | Applicant: Li Tinna | Permit status: Finaled | Completion date: March 21, 2012 | Expiration date: August 2, 2012 | Permit id: 1011020028 | |||||
SCORE 99 Renovation of (e) cafeteria including back of house and dining area. Applicant: Carrasquillo Alfred | Permit status: Finaled | Completion date: July 5, 2011 | Expiration date: February 10, 2012 | Permit id: 1012220049 | |||||
SCORE 100 Fire sprinkler for t. I. To existing cafeteria dinning room, kitchen, & corridor Applicant: Marrujo Paul | Permit status: Permisud | Expiration date: February 17, 2012 | Permit id: 1101310055 | |||||
SCORE 99 Foundation for prefabricated trailer Applicant: Li Tinna | Permit status: Finaled | Completion date: July 5, 2011 | Expiration date: May 11, 2012 | Permit id: 1104140044 | |||||
SCORE 100 Fire sprinklers install:add 5 heads to existing system under walkway front lobby Applicant: Mattison Jayson | Permit status: Finaled | Completion date: July 5, 2011 | Expiration date: April 25, 2012 | Permit id: 1104260021 | |||||
SCORE 99 Central plant & east equipment yard renovation & east passen ger elevator upgrade Engineer: Co Architects | Applicant: Chen Chao | Permit status: Finaled | Completion date: May 7, 2013 | Expiration date: October 11, 2012 | Permit id: 1105170025 | |||||
SCORE 99 Otis booth pavilion t. I. & addition Applicant: Li Tina | Permit status: Finaled | Completion date: June 16, 2013 | Expiration date: March 7, 2013 | Permit id: 1107200070 | |||||
SCORE 100 T. I. Of central plant relocate 12 sprinkler heads & piping Applicant: Pulido James | Permit status: Finaled | Completion date: November 9, 2011 | Expiration date: September 26, 2012 | Permit id: 1109270057 | |||||
SCORE 99 (n) 14x11 opening on the (e) south exterior wall and installation of operable glass panels; also include a pit adjacent to the opening to house a scissor lift. Applicant: Alfred Carrasquillo | Permit status: Finaled | Completion date: May 7, 2013 | Expiration date: May 10, 2013 | Permit id: 1203120062 | |||||
SCORE 99 Laex t. I.- installation of exhibition casework & fixture in (e) galleries. Demo (e) north door & installation of fixed curtain wall at the existing opening Engineer: Jorge De La Cal | Applicant: Duvand Diane | Permit status: Permisud | Expiration date: May 24, 2013 | Permit id: 1204110018 | |||||
SCORE 100 (82) fire sprinkler installation for ti Applicant: Pulibo James | Permit status: Permisud | Expiration date: May 10, 2013 | Permit id: 1205070078 | |||||
SCORE 69 Laex t. I.- interior canopy support & canopy @ rm m12, m00, & m62. Engineer: Jorge De La Cal | Applicant: Eric Blumberg | Permit status: Permisud | Expiration date: October 2, 2013 | Permit id: 1206210040 | |||||
SCORE 99 Replace (e) 56 heads from pendant to uprights in area 1,2,&3 in laex area Engineer: Jorge De La Cal | Applicant: Duvand Diane | Permit status: Permisud | Expiration date: June 25, 2013 | Permit id: 1206250052 | |||||
SCORE 99 8008 sqft t. I. To 2 existing galleries Engineer: Jorge De La Cal | Applicant: Pan Junru | Permit status: Finaled | Completion date: October 18, 2013 | Expiration date: November 8, 2013 | Permit id: 1208020066 | |||||
SCORE 64 Tie into existing dedicated riser to supply protection to traveling exhibit gallery with brass pendant & 6 recessed sprinklers Applicant: Jimmy Pulido | Permit status: Finaled | Completion date: October 18, 2013 | Expiration date: March 21, 2014 | Permit id: 1302110019 | |||||
SCORE 99 Fire sprinkler system ti - adding (75) sprinkler heads Applicant: James Pulido | Permit status: Permisud | Expiration date: February 19, 2014 | Permit id: 1302190055 | |||||
SCORE 99 Interior improvements for 1913 building-accessibility impro. Date: October 25, 2007 Contractor: Matt Construction Applicant: Jorge De La Cal | Permit status: Finaled | Completion date: April 9, 2009 | Expiration date: April 22, 2008 | Permit id: 710110021 | |||||
SCORE 99 Seismic upgrade,unit 1 building toilet &acess . Improvement Date: March 30, 2009 Contractor: Matt Construction Applicant: De La Cal Jorge | Permit status: Permisud | Expiration date: September 26, 2009 | Permit id: 903100035 | |||||
SCORE 99 2 level garage Date: March 10, 2010 Contractor: Matt Construction Applicant: Hank Dahl | Permit status: Finaled | Completion date: July 5, 2011 | Expiration date: March 10, 2011 | Permit id: 908030040 | |||||
SCORE 99 Electrical for restrooms. Date: February 25, 2010 Contractor: Matt Construction Applicant: Howanets Natalia | Permit status: Finaled | Completion date: July 13, 2010 | Expiration date: February 25, 2011 | Permit id: 912300012 | |||||
SCORE 56 Electrical for shops. Date: March 29, 2010 Contractor: Event Network Applicant: Howanets Natalia | Permit status: Finaled | Completion date: May 14, 2010 | Expiration date: March 29, 2011 | Permit id: 912300014 | |||||
SCORE 65 Electrical upgrade, tenant improvement Date: March 2, 2010 Contractor: Cinnabar Calif. Inc Applicant: Brian Whittier | Permit status: Finaled | Completion date: June 22, 2010 | Expiration date: March 2, 2011 | Permit id: 1002170006 | |||||
SCORE 99 Electrical marine life gallery. Date: March 11, 2010 Contractor: Matt Construction Applicant: Howanets Natalia | Permit status: Finaled | Completion date: June 1, 2011 | Expiration date: March 11, 2011 | Permit id: 1003100023 | |||||
SCORE 99 El for (e) temporary ramp at south entrance and build new ramp that provides access from grade to the main level. Date: July 29, 2010 Contractor: Matt Construction Engineer: Co Architects | Applicant: Carrasquillo Alfred | Permit status: Finaled | Completion date: July 5, 2011 | Expiration date: July 29, 2011 | Permit id: 1005250008 | |||||
SCORE 69 Electrical for rotunda area of the gallery Date: June 15, 2010 Contractor: Cinnabar California Inc Applicant: Whittier, Brian Jay | Permit status: Finaled | Completion date: June 15, 2010 | Expiration date: June 15, 2011 | Permit id: 1006140003 | |||||
SCORE 99 Electrical for new cafe Date: February 10, 2011 Contractor: Matt Construction Corporation Applicant: Carrasquillo Alfred | Permit status: Finaled | Completion date: July 5, 2011 | Expiration date: February 10, 2012 | Permit id: 1102090016 | |||||
SCORE 99 Utility upgrade Date: October 12, 2011 Contractor: Matt Construction Corporation Engineer: Ibe Consulting Engineers | Applicant: Ibe Consulting Engineers | Permit status: Finaled | Completion date: June 7, 2013 | Expiration date: October 11, 2012 | Permit id: 1106020021 | |||||
SCORE 99 El for otis booth pavilion t. I. & addition Date: March 7, 2012 Contractor: Matt Construction Corporation Applicant: Li Tina | Permit status: Finaled | Completion date: June 16, 2013 | Expiration date: March 7, 2013 | Permit id: 1107190041 | |||||
SCORE 89 El for exhibit gallary laex Date: July 12, 2012 Contractor: Morrow Meadows Construction Applicant: Zatorski Robert | Permit status: Permisud | Expiration date: July 12, 2013 | Permit id: 1203290040 | |||||
SCORE 99 Electrical for south service access Date: May 10, 2012 Contractor: Matt Construction Corporation Applicant: Alfred Carrasquillo | Permit status: Finaled | Completion date: June 7, 2013 | Expiration date: May 10, 2013 | Permit id: 1205100016 | |||||
SCORE 99 El for 8008 sqft t. I. Date: November 8, 2012 Contractor: Matt Construction Corporation Applicant: Howanets Natalia | Permit status: Permisud | Expiration date: November 8, 2013 | Permit id: 1209200034 | |||||
SCORE 99 Revision: el for otis booth pavilion t. I. & addition Date: February 26, 2013 Contractor: Matt Construction Corporation Applicant: Natalia | Permit status: Finaled | Completion date: June 17, 2013 | Expiration date: February 26, 2014 | Permit id: 1302250048 | |||||
SCORE 99 Revision #2: for otis booth pavilion t. I. & addition Date: April 9, 2013 Contractor: Matt Construction Corporation Applicant: Natalia Howanets | Permit status: Finaled | Completion date: June 16, 2013 | Expiration date: April 9, 2014 | Permit id: 1304080046 | |||||
SCORE 99 Grading for new parking structure. Date: March 8, 2010 Contractor: Matt Construction Engineer: Co Architects | Applicant: Shawn | Permit status: Finaled | Completion date: July 5, 2011 | Expiration date: March 8, 2011 | Permit id: 910200002 | |||||
SCORE 99 Grading for the new development of a new north entrance. Date: August 31, 2010 Contractor: Matt Construction Corporation Engineer: A.Nickerson Psomas | Applicant: Alfred Carrasquillo | Permit status: Finaled | Completion date: July 5, 2011 | Expiration date: August 31, 2011 | Permit id: 1005200001 | |||||
SCORE 99 (n) campus area b site improvement, grading 5955 cy Date: January 26, 2011 Contractor: Matt Construction Corporation Applicant: Li Tinna | Permit status: Permisud | Expiration date: January 26, 2012 | Permit id: 1011020003 | |||||
SCORE 99 Seimic upgrade unit 1 building toilet 6 acessibility improv Date: March 30, 2009 Contractor: Matt Construction Applicant: Jorge De La Cal | Permit status: Permisud | Expiration date: September 26, 2009 | Permit id: 903300029 | |||||
SCORE 99 Unit 1 upgrade Date: February 22, 2010 Contractor: Matt Construction Applicant: Patrick Sheehan | Permit status: Finaled | Completion date: May 12, 2011 | Expiration date: February 22, 2011 | Permit id: 911160013 | |||||
SCORE 99 Fan coil unit for elevator machine room. Date: January 21, 2010 Contractor: Matt Construction Applicant: Alfred Carrasquillo | Permit status: Finaled | Completion date: July 5, 2011 | Expiration date: January 21, 2011 | Permit id: 1001190008 | |||||
SCORE 99 Interior remodel of 2 existing restrooms. Date: January 21, 2010 Contractor: Matt Construction Engineer: Co Arch. Shannon Binger | Applicant: Alfred Carrasquillo | Permit status: Finaled | Completion date: July 13, 2010 | Expiration date: January 21, 2011 | Permit id: 1001210004 | |||||
SCORE 99 Renovation of (e) cafeteria including back of house and dining area. Date: May 12, 2011 Contractor: Matt Construction Corporation Applicant: Carrasquillo Alfred | Permit status: Finaled | Completion date: July 5, 2011 | Expiration date: May 11, 2012 | Permit id: 1104270003 | |||||
SCORE 99 Mechanical for t. I. & addition Date: March 7, 2012 Contractor: Matt Construction Corporation Applicant: Li Tina | Permit status: Finaled | Completion date: June 10, 2013 | Expiration date: March 7, 2013 | Permit id: 1203070030 | |||||
SCORE 99 Me for 8008 sqft t. I. Date: November 8, 2012 Contractor: Matt Construction Corporation Applicant: Sheehan Patrick | Permit status: Finaled | Completion date: October 18, 2013 | Expiration date: November 8, 2013 | Permit id: 1209200015 | |||||
SCORE 92 Interior remodel of existing museum Date: December 13, 2007 Contractor: Muirchase Plumbing Co. Inc Applicant: Tua Sam | Permit status: Finaled | Completion date: March 30, 2009 | Expiration date: June 10, 2008 | Permit id: 712130009 | |||||
SCORE 99 Interior improvements for 1913 building-accessibility impro. Date: February 25, 2010 Contractor: Matt Construction Applicant: Jorge De La Cal | Permit status: Finaled | Completion date: July 13, 2010 | Expiration date: February 25, 2011 | Permit id: 1002220012 | |||||
SCORE 99 Pl for otis booth pavilion t. I. & addition Date: March 7, 2012 Contractor: Matt Construction Corporation Applicant: Li Tinna | Permit status: Finaled | Completion date: June 16, 2013 | Expiration date: March 7, 2013 | Permit id: 1107190036 | |||||
SCORE 99 Pl for 8008 sqft t. I. To 2 existing galleries Date: November 8, 2012 Contractor: Matt Construction Corporation Engineer: Jorge De La Cal | Applicant: Pan Junru | Permit status: Finaled | Completion date: October 18, 2013 | Expiration date: November 8, 2013 | Permit id: 1211080024 | |||||
SCORE 59 Install (2) new electric vehicle chargers(1 conductive, 1 inductive); (2) new 40a, 240v circuits on existing panel. Date: February 9, 2000 Contractor: Dept. Of Water And Power, City Of L Applicant: Mark Zumwalt | Permit status: Permisud | Expiration date: August 7, 2000 | Permit id: 1310001 | |||||
SCORE 99 Fire sprinkler Applicant: Brown Maxine | Permit status: Finaled | Completion date: April 9, 2009 | Expiration date: November 16, 2008 | Permit id: 805150055 | |||||
SCORE 99 New pre-action sprinkler system Applicant: Maxine Brown | Permit status: Finaled | Completion date: April 9, 2009 | Expiration date: April 25, 2009 | Permit id: 810270022 | |||||
SCORE 100 Fire sprinklers Applicant: Jonathan Garcia | Permit status: Finaled | Completion date: June 1, 2011 | Expiration date: November 1, 2009 | Permit id: 905040067 | |||||
SCORE 100 Add 2 sprinkler heads to building Applicant: Tim Tipton | Permit status: Finaled | Completion date: June 1, 2011 | Expiration date: January 21, 2011 | Permit id: 1001210024 | |||||
SCORE 100 Fire sprinkler for t. I. To existing cafeteria dinning room, kitchen, & corridor Applicant: Marrujo Paul | Permit status: Permisud | Expiration date: February 17, 2012 | Permit id: 1101310055 | |||||
SCORE 100 Fire sprinklers install:add 5 heads to existing system under walkway front lobby Applicant: Mattison Jayson | Permit status: Finaled | Completion date: July 5, 2011 | Expiration date: April 25, 2012 | Permit id: 1104260021 | |||||
SCORE 100 T. I. Of central plant relocate 12 sprinkler heads & piping Applicant: Pulido James | Permit status: Finaled | Completion date: November 9, 2011 | Expiration date: September 26, 2012 | Permit id: 1109270057 | |||||
SCORE 100 (82) fire sprinkler installation for ti Applicant: Pulibo James | Permit status: Permisud | Expiration date: May 10, 2013 | Permit id: 1205070078 | |||||
SCORE 87 Interior remodel of existing museum Date: December 13, 2007 Contractor: Muirchase Plumbing Co., Inc Applicant: Tua Sam | Permit status: Finaled | Completion date: March 30, 2009 | Expiration date: June 10, 2008 | Permit id: 712130009 | |||||
SCORE 56 2 4 amp, 1 225,1 5 hp motor, 17 1 v circuits, 79 branch circuits Date: April 20, 2000 Contractor: Belco Electric, Inc Applicant: Belco Electric Inc | Permit status: Finaled | Completion date: October 19, 2000 | Expiration date: October 17, 2000 | Permit id: 4200008 | |||||
SCORE 95 Non structural-cosmetic repair northridge eq damage inc int& ext plaster/stucco repair, 40-45 of epoxy injection, ceram ic tile replacement Engineer: Donald Lee | Applicant: Khayat Xnmn | Permit status: Permisud | Expiration date: July 22, 2002 | Permit id: 201230032 | |||||
SCORE 61 Ada restroom upgrade basement. Install (1) line of water piping, < 1 1/2 inches and (1) system of drainage/vent piping repair. Date: February 21, 2002 Contractor: Inc. New Creation Engineering And Builde Engineer: Ray Sein* | Applicant: Blaauw Glen | Permit status: Permisud | Expiration date: August 20, 2002 | Permit id: 202210013 | |||||
SCORE 99 Build new mezzanine w/in main level exhibition hall; new ele vator connecting main, mezzanine & second levels;install new windows at s. Elevation of exhibition halls Engineer: Jacq. Vinkler John A. Martin | Applicant: De La Cal Jorge | Permit status: Finaled | Completion date: May 12, 2011 | Expiration date: February 22, 2011 | Permit id: 906100001 | |||||
SCORE 99 Demolish existing parking lots/walls/entry terrace and build a new parking structure Applicant: De La Cal Jorge | Permit status: Finaled | Completion date: July 5, 2011 | Expiration date: March 8, 2011 | Permit id: 907280062 | |||||
SCORE 99 (n) north entrance with (n) bridge & connect entry plaza w/ an existing terrace to the main level Engineer: Co Architects | Applicant: Pan Peter | Permit status: Finaled | Completion date: July 11, 2011 | Expiration date: September 30, 2011 | Permit id: 1004270017 | |||||
SCORE 99 El for (n) north entrance with (n) bridge & connect entry plaza w/ an existing terrace to the main level Date: September 30, 2010 Contractor: Matt Construction Engineer: Co Architects | Applicant: Carrasquilio Alfred | Permit status: Finaled | Completion date: July 11, 2011 | Expiration date: September 30, 2011 | Permit id: 1005250009 | |||||
SCORE 99 Install 75kva transformer to change voltage of new a/c units Date: February 14, 2013 Contractor: Matt Construction Engineer: John A Martin And Associates | Applicant: Carrasquillo Alfred | Permit status: Finaled | Completion date: March 4, 2013 | Expiration date: February 14, 2014 | Permit id: 1302130003 | |||||
Date: July 25, 2016 Value: $233,000 Engineer: Abi Engineering Consulting, Inc. | Applicant: Same As Owner | Permit status: Permisud | Expiration date: July 25, 2017 | Permit id: 1604280092 | |||||
SCORE 86 Foundation system for state approved modular building education community facility. 7573 sqft Applicant: Dave Echt | Permit status: Permisud | Expiration date: October 6, 2017 | Permit id: 1609060073 | |||||
SCORE 69 Misc plumbing swer lines for future use. See attached plans. Install 4" sewer main apprx 2 long & 7deep. 2" cold Engineer: Abi Engineering Consulting, Inc. | Applicant: Michael Alvares | Permit status: Permisud | Expiration date: February 19, 2017 | Permit id: 1608220007 | |||||
SCORE 62 Misc electrical conduit for future use. Trench 1 lf, 30" wide, 30" deep Engineer: Abi Engineering Consulting, Inc. | Applicant: Mike Alvarez | Permit status: Permisud | Expiration date: February 19, 2017 | Permit id: 1608220008 | |||||
SCORE 98 Misc plumbing for future fire sprinkler 4" line. Pipe will be 4 deep and 85 lf. Coneections for services shall be approved at a later time. See attached site plan Applicant: Michael Alvarez | Permit status: Permisud | Expiration date: February 20, 2017 | Permit id: 1608220009 |