Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Crown castle: temporarily relocate rooftop antennas. Once new screening wall is built by stanford (under separate permit) relocate antennas to new screen wall. Value: $56,000 Permit type: Project - building permit | Permit status: In plan check | Permit id: 16000-00220 | |||||
Stanford clinic: replacement mri equipment in the basement. Scope of work includes new rooftop screening and closed loop chiller and expansion tank on the roof. Value: $1,950,000 Permit type: Project - building permit | Permit status: Approved | Permit id: 15000-03048 | |||||
SCORE 93 14000-01397: relocation of (e) ct chiller in the enclosed mechanical yard to a new location in mechanical yard with associated pipe and conduit revisions. Date: November 18, 2014 Contractor: Level Construction Lp Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00701 | |||||
SCORE 93 Replacement and installation of ct-scanner including support spaces located on basement level only, no exterior work Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-01397 | |||||
SCORE 96 Temporary commercial construction trailer. 2 sf. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-01511 | |||||
SCORE 88 Tenant improvement to a portion of the existing 1st floor Date: August 27, 2012 Contractor: Dome Construction Corp Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-02122 | |||||
SCORE 88 Stanford medical center: install two (2) badge link clocks total on the second and third floor. Card readers are for clocking in and out and do not impede egress Date: October 30, 2012 Contractor: Dome Construction Corp Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-02704 | |||||
Install new receptacles on first and second floor. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-02631 | |||||
Install new receptacles on first and second floor. Date: October 19, 2012 Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-02631 | |||||
SCORE 82 Stanford radiology clinic: ti for existing tenant (3951 sf) at the lower level Date: February 7, 2012 Contractor: Fernandes And Sons Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-00303 | |||||
SCORE 100 Install lighting to (2) exam rooms with associated structural bracing for unistrut. Date: January 27, 2012 Contractor: Novo Construction Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-00222 | |||||
Stanford clinic: replacement mri equipment in the basement. Scope of work includes new rooftop screening and closed loop chiller and expansion tank on the roof. Date: November 18, 2015 Value: $1,950,000 Permit type: Project - building permit | Permit status: Approved | Permit id: 15000-03048 | |||||
Crown castle: temporarily relocate rooftop antennas. Once new screening wall is built by stanford (under separate permit) relocate antennas to new screen wall. Date: February 1, 2016 Value: $56,000 Permit type: Project - building permit | Permit status: In plan check | Permit id: 16000-00220 | |||||
SCORE 65 Crown castle: temporarily relocate rooftop antennas. Once new screening wall is built by stanford, relocate antennas to new screen wall (wall and relocation under separate permit). Permit type: Project - building permit | Permit status: Permit issued | Permit id: 16000-00220 | |||||
15-3048: revised plans clarification mechanical, electrical and plumbing. Date: August 24, 2016 Permit type: Revision-building permit | Permit status: In plan check | Permit id: 16rev-00522 | |||||
SCORE 69 Install new receptacles on first and second floor. Date: October 19, 2012 Contractor: Palmer Electric, Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-02631 | |||||
SCORE 93 14000-01397: relocation of (e) ct chiller in the enclosed mechanical yard to a new location in mechanical yard with associated pipe and conduit revisions. Date: November 18, 2014 Contractor: Level Construction Lp Permit status: Permit issued | Permit id: 14rev-00701 | |||||
SCORE 93 Replacement and installation of ct-scanner including support spaces located on basement level only, no exterior work Permit status: Permit issued | Permit id: 14000-01397 | |||||
SCORE 96 Temporary commercial construction trailer. 2 sf. Permit status: Permit issued | Permit id: 13000-01511 | |||||
SCORE 88 Stanford medical center: install two (2) badge link clocks total on the second and third floor. Card readers are for clocking in and out and do not impede egress Date: October 30, 2012 Contractor: Dome Construction Corp Permit status: Permit issued | Permit id: 12000-02704 | |||||
SCORE 69 Install new receptacles on first and second floor. Date: October 19, 2012 Contractor: Palmer Electric, Inc Permit status: Permit issued | Permit id: 12000-02631 | |||||
SCORE 88 Tenant improvement to a portion of the existing 1st floor Date: August 27, 2012 Contractor: Dome Construction Corp Permit status: Permit issued | Permit id: 12000-02122 | |||||
SCORE 82 Stanford radiology clinic: ti for existing tenant (3951 sf) at the lower level Date: February 7, 2012 Contractor: Fernandes And Sons Inc Permit status: Permit issued | Permit id: 12000-00303 | |||||
SCORE 100 Install lighting to (2) exam rooms with associated structural bracing for unistrut. Date: January 27, 2012 Contractor: Novo Construction Inc Permit status: Permit issued | Permit id: 12000-00222 | |||||
Temp construction trailers. Two single wide construction trailer with common platform in between and construct associated accessible ramp. Date: August 21, 2017 Value: $81,681 Permit status: In plan check | Permit id: 17000-01989 | |||||
SCORE 65 16000-00220: revision to clarify crown castle will install custom pre-fabricated (fr-4) wall panels onto previously approved rooftop screen wall installed by stanford under separate permit 15-3048. Crown castle to submit revised plans and attachment details for installation of wall panels as a deferred submittal. Date: March 20, 2017 Contractor: Lighthouse Communications Permit status: Permit issued | Permit id: 17rev-00170 | |||||
SCORE 62 17-922: clarification epo location and required placards per fire Date: May 2, 2017 Contractor: California Generator Service Corporation Permit status: Permit issued | Permit id: 17rev-00262 | |||||
SCORE 62 Connect a temporary diesel generator on a truck to existing backup system via cables while the existing generators radiator is being repaired. Date: April 28, 2017 Contractor: California Generator Service Corporation Permit status: Permit issued | Permit id: 17000-00922 | |||||
Existing firm "leland stanford jr university" to replace ultrasound cleaner in same location at 3rd floor. Associated reconnection to di water and drain. Oshpd 3. Date: May 11, 2017 Value: $2,000 Permit status: Approved | Permit id: 17000-01020 | |||||
SCORE 65 Crown castle: temporarily relocate rooftop antennas. Once new screening wall is built by stanford, relocate antennas to new screen wall (wall and relocation under separate permit). Permit status: Permit issued | Permit id: 16000-00220 | |||||
SCORE 93 Remove existing pyxis medication dispenser and replace with new omnicell medication dispensers at rooms #w0139, 00c0s, w0052, w3029, and w1070 Permit status: Permit issued | Permit id: 17000-00428 |