Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 86 Pv1. Install 11. 56 kw dc stc roof mounted grid tied pv system. (34) Date: June 7, 2017 Contractor: Andre Babujyan Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 17041-20000-157 | |||||
SCORE 100 Re-roof with class a or b material weighing less than 6 pound per sq. Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 17016-20000-110 |