Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 96 Using hollow stem auger method, we will drill a geotechnical soil boring for subsurface investigation of the proposed pepco project. All spoils will be containerized in 55-gallon drums and removed from site upon the results of environmental classification. Boreholes will be backfilled with a 60: ratio of bentonite powder to cement for paved areas and grouted with 2 pounds of bentonite powder to 1 gallon of water for non-paved areas. Paved areas will also include a concrete plug and an asphalt or concrete surface patch to match the surrounding pavement. ![]() ![]() Permit type: Excavation; boring test pit (single) | Permit status: Assigned | Expiration date: April 30, 2017 | |||||
SCORE 96 Using hollow stem auger method, we will drill a 6 inch diameter geotechnical soil boring to a depth of feet for subsurface investigation of the proposed pepco project. All spoils will be containerized in 55-gallon drums and removed from site upon the results of environmental classification. Boreholes will be backfilled with a 60: ratio of bentonite powder to cement for paved areas and grouted with 2 pounds of bentonite powder to 1 gallon of water for non-paved areas. Paved areas will also include a concrete plug and an asphalt or concrete surface patch to match the surrounding pavement. ![]() ![]() Permit type: Excavation; boring test pit (single) | Permit status: Assigned | Expiration date: April 30, 2017 | |||||
SCORE 92 Funeral service ![]() ![]() Permit status: Expired | Expiration date: March 17, 2012 | Permit id: Pa10052823 | |||||
SCORE 96 Excavation; boring test pit (single) ![]() Permit status: 12 | Expiration date: September 2, 2017 | Permit id: 0 | |||||
SCORE 79 Enp for ddot contractors ![]() ![]() Permit status: Issued | Expiration date: June 23, 2017 | Permit id: Pa10424460 | |||||
SCORE 80 Using hollow stem auger method, we will drill a 6 inch diameter geotechnical soil boring to a depth of feet for subsurface investigation of the proposed pepco project. All spoils will be containerized in 55-gallon drums and removed from site upon the results of environmental classification. Boreholes will be backfilled with a 60: ratio of bentonite powder to cement for paved areas and grouted with 2 pounds of bentonite powder to 1 gallon of water for non-paved areas. Paved areas will also include a concrete plug and an asphalt or concrete surface patch to match the surrounding pavement. ![]() Permit status: Assigned | Expiration date: September 2, 2017 | Permit id: 0 | |||||
SCORE 96 Excavation; boring test pit (single) ![]() ![]() Permit status: 8 | Expiration date: September 7, 2017 | Permit id: Pa198739 | |||||
SCORE 80 Using hollow stem auger method, we will drill a 6 inch diameter geotechnical soil boring to a depth of feet for subsurface investigation of the proposed pepco project. All spoils will be containerized in 55-gallon drums and removed from site upon the results of environmental classification. Boreholes will be backfilled with a 60: ratio of bentonite powder to cement for paved areas and grouted with 2 pounds of bentonite powder to 1 gallon of water for non-paved areas. Paved areas will also include a concrete plug and an asphalt or concrete surface patch to match the surrounding pavement. ![]() ![]() Permit status: Permit expired | Expiration date: September 7, 2017 | Permit id: Pa198739 | |||||
SCORE 56 Funeral service ![]() ![]() Permit status: Permit expired | Expiration date: February 19, 2014 | Permit id: Pa10129969 | |||||
SCORE 79 Construction staging area ![]() ![]() Permit status: Permit expired | Expiration date: June 30, 2017 | Permit id: Pa10395089 |