Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 84 Erect a 20x frame tent and (2) 10x10 marquees betqeen stuart and barat house on 5 16 14 to 5 20 14 Parcel: 13021 0003 | |||||
SCORE 84 Erect a 40x frame tent and (2) 10x marquee at the courtyard between stuart and barat on 5 21 14 to 5 23 14 Parcel: 13021 0003 | |||||
SCORE 84 Erect 40x frame tent and 6 marquee 6x tents between stuart and barat on 5 27 14 to 6 2 14 Parcel: 13021 0003 | |||||
SCORE 61 Install new plaza statue and landscaping Parcel: 13021 0003 | |||||
SCORE 95 Install a 40x temp tent on may 22nd and remove may 25th Parcel: 13021 0003 | |||||
SCORE 84 Erect x tent on 5 24 & remove on 6 24 - behind "barat house" Parcel: 13021 0003 | |||||
SCORE 84 Interior renovations to the 2nd fl, demo, new non-structural partitions, new finishes, plumbing, fire protection, hvac & electrical work. Parcel: 13021 0003 | |||||
SCORE 56 Bc stuart house, 13 sf interior fit up; new flooring, ceiling and lighting. Add (2) fan coil units and new addressable fire alarm devices Parcel: 13021 0003 | |||||
SCORE 97 Keyes hall- interior renovations to student lounges. New millwork, finishes, lighting, and mechanical. No structural work. Must comply with cmr 521 Parcel: 13021 0003 | |||||
SCORE 84 Gutter and flat roof replacement, repointing of chimneys Parcel: 13021 0003 | |||||
SCORE 95 Erect x tent on stuart lawn of boston college install 6-10-11 and take down 6-14-11 Parcel: 13021 0003 | |||||
SCORE 82 Demo house at 29 mill street on bc campus. Date: June 7, 2011 Contractor: Steven V Georgopoulos Parcel: 13021 0003 | |||||
SCORE 97 Duchesne hall- interior renovations of two student lounges. New mechanical, lighting, millwork, carpet, and paint. Parcel: 13021 0003 | |||||
SCORE 95 20x temp tent from 5 27 to 5 25 11 for the bc law school commencement. Parcel: 13021 0003 | |||||
SCORE 95 Erect x w of marquee on stuart lawn 05-20-11 - 05-27-11 Parcel: 13021 0003 | |||||
SCORE 95 Temp tent Parcel: 13021 0003 | |||||
SCORE 84 Office renovation with new interior finishes, fire alarm, hvac and electrical on the 3rd floor. Parcel: 13021 0003 | |||||
SCORE 56 Date: April 23, 2010 Value: $950 Parcel: 13021 0003 | |||||
SCORE 95 Replace leaking and defective cooling tower for air conditioning system. Parcel: 13021 0003 | |||||
SCORE 91 Remove stone ballast and inulation and epd Parcel: 13021 0003 | |||||
SCORE 56 Install modular press box on existing slab adjacent to hockey field. Regrade existing asphalt walk and new concrete slab at entry. Parcel: 13021 0003 | |||||
SCORE 56 Minor interior demo, new walls, ceilings, paint and carpet, minor plumbing and electrical mary house, bc law school campus Parcel: 13021 0003 | |||||
SCORE 61 Interior demo Parcel: 13021 0003 | |||||
SCORE 61 Remodel lobby & corridor Parcel: 13021 0003 | |||||
SCORE 95 Erect tent on grass area on 5 31 07 and remove on 6 4 07 Parcel: 13021 0003 | |||||
SCORE 95 Erect tent on grass area on 5 23 07 and remove on 5 26 07 Parcel: 13021 0003 | |||||
SCORE 95 Temp tent Parcel: 13021 0003 | |||||
SCORE 95 Erect temp tent on 5 21 08 and removed 5 24 08 Parcel: 13021 0003 | |||||
SCORE 95 Erect x tent 05-23, remove 05-26-07 Parcel: 13021 0003 | |||||
SCORE 95 Synthetic turf field, press box, site improvements Parcel: 13021 0003 |