Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Apartment 32fl, rm es4: trace & repair the source of concealed water leaks from the roof. Remove all air pockets around the effected area. Provid Date: February 5, 2015 Permit type: Gc | Permit id: Ef13872 | |||||
Install approx. L. Ft. Of 4 stack and sewer pipe from rear of basement to housetrap and from house trap to street. ( to include backfill and ceme Date: December 1, 2004 Permit type: Plumb | Permit id: E513692 | |||||
Basement: remove approximately cubic yards of rubbish and dog feces (waste) from entire basement. Broom sweep and disinfect entire basement. No Date: March 4, 2005 Permit type: Gc | Permit id: E523125 | |||||
Apartment #cc: pump out water and raw sewage, clear stoppage then clean and disinfect at cellar cc. Note: contractor must contact cordell @ (718) Date: October 26, 2004 Permit type: Stopag | Permit id: E511079 | |||||
Install approx. L. Ft. Of 4 stack and sewer pipe from rear of basement to housetrap and from house trap to street. Re-connect all broken connecti Date: March 9, 2005 Permit type: Plumb | Permit id: E522736 | |||||
As per the attached scope of work, scrub mildewed surfaces with a solution of one cup of chlorine bleach to one gallon of water. A detergent such as t Date: August 5, 2003 Permit type: Gc | Permit id: E402480 | |||||
Supply and install a new steel door and buck at apt entrance door complete with all new locks and hardware, located at 1st fl apt. Supply four (4) spa Date: December 2, 2004 Permit type: Gc | Permit id: E513591 | |||||
Apartment #4 repair foyer floor, approx. Sq. Ft. And install new v. C. T. Remove all work related debris. Note: contractor must contact hpd @ (7 Date: March 23, 2006 Permit type: Gc | Permit id: E628169 | |||||
Basement: exterminate entire basement and leave free of all rats fleas, etc. Remove all work related debris note: contractor must contact hpd at 7 Date: April 7, 2005 Permit type: Exterm | Permit id: E527374 | |||||
(apt. #1) restore gas fired boiler to proper working order. Ensure an adequate supply of heat to the entire building. Remove all work related debri Permit type: Heat | Permit id: E522849 | |||||
Apt. 2: remove toilet bowl and set aside for re-installation. Replace approx. 9sq. Ft. Of flooring and tile work (to match existing tiles) at leadbend Date: March 4, 2005 Permit type: Gc | Permit id: E523127 | |||||
(apt. #1) restore gas fired boiler to proper working order. Ensure an adequate supply of heat to the entire building. Remove all work related debri Permit type: Heat | Permit id: E523811 | |||||
Apt #1 & #2: troubleshoot and make necessary repairs to electric wiring throughout apts. Install new breaker boxes to both apts. Install all new outl Date: March 11, 2005 Permit type: Elec | Permit id: E523297 | |||||
Make all necessary repairs to gas fired boiler to restore to proper working order. Restore heat to building. Note: contractor must contact hpd at Date: March 29, 2005 Permit type: Heat | Permit id: E523633 | |||||
Apt. #1: bathroom; demolish entire bathroom ceiling and ceiling framework. Install 3 new joists 3 x 12, an approx. Total of linear ft. And hea Date: March 14, 2005 Permit type: Gc | Permit id: E523519 | |||||
(apt. #1) restore hot water heater to proper working order and ensure an adequate supply hot water to entire building. Remove all work related debri Date: March 2, 2005 Permit type: Heat | Permit id: E522862 | |||||
(apt. #1) restore gas fired boiler to proper working order. Ensure an adequate supply of heat to the entire building. Remove all work related debri Permit type: Heat | Permit id: E522849 | |||||
(apt. #1) restore gas fired boiler to proper working order. Ensure an adequate supply of heat to the entire building. Remove all work related debri Permit type: Heat | Permit id: E523811 | |||||
(apt. #1) restore gas fired boiler to proper working order. Ensure an adequate supply of heat to the entire building. Remove all work related debri Permit type: Heat | Permit id: E523811 | |||||
(apt. #1) restore gas fired boiler to proper working order. Ensure an adequate supply of heat to the entire building. Remove all work related debri Permit type: Heat | Permit id: E522849 | |||||
(apt. #1) restore gas fired boiler to proper working order. Ensure an adequate supply of heat to the entire building. Remove all work related debri Permit type: Heat | Permit id: E523811 | |||||
(apt. #1) restore gas fired boiler to proper working order. Ensure an adequate supply of heat to the entire building. Remove all work related debri Permit type: Heat | Permit id: E522849 | |||||
(apt. #1) restore gas fired boiler to proper working order. Ensure an adequate supply of heat to the entire building. Remove all work related debri Permit type: Heat | Permit id: E523811 | |||||
(apt. #1) restore gas fired boiler to proper working order. Ensure an adequate supply of heat to the entire building. Remove all work related debri Permit type: Heat | Permit id: E522849 | |||||
Test and restore gas. Repair as needed permit requested blue card needed to apartment#1 only. Note: contractor must contact hpd at 718-636-3027 or Date: September 8, 2003 Permit type: Plumb | Permit id: E403732 | |||||
Repair water main valve and replace overhead at hot and cold water lines. Replace broken water meter. Restore water to entire building. Date: February 19, 2004 Permit type: Plumb | Permit id: E417077 | |||||
As per rc #2003002573101 (international asb test lab), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) Date: July 11, 2003 Permit type: Delead | Permit id: E325925 | |||||
Gas fired boiler: make all necessary repairs to gas fired boiler to restore to proper working condition. Restore heat and hot water to #1a and entire Permit type: Heat | Permit id: E416418 | |||||
(apt. #1a) at kitchen install metal door frame with all hardware. Insulate and caulk around frame. Remove all work related debris. Note: vendo Date: April 9, 2003 Permit type: Gc | Permit id: E319479 | |||||
Apt. #1a) upgrade 1 1/2 gas header install gas valve, install dresser captin over head gas line from service header to meter bank. Install new met Date: October 21, 2003 Permit type: Plumb | Permit id: E406822 | |||||
(apt. #1a) at bathroom repair conceal water leak. Demolish ceiling approx sq. Ft. Sheetrock, tape, compound, prime and paint ceiling approx sq Date: May 9, 2003 Permit type: Gc | Permit id: E321621 | |||||
Check electric for apt#1 call con edison to install meters and restore lights and power to public hall lights to be installed into basement meter pane Date: September 8, 2003 Permit type: Elec | Permit id: E403731 | |||||
Make all necesaary repairs to legalize hot water heater and boiler in basement. Note: contracor must contact hpd at 718 636-3027 with start date. Date: December 1, 2003 Permit type: Heat | Permit id: E409725 | |||||
Gas fired boiler: make all necessary repairs to gas fired boiler to restore to proper working condition. Restore heat and hot water to #1a and entire Permit type: Heat | Permit id: E416418 | |||||
Gas fired boiler: make all necessary repairs to gas fired boiler to restore to proper working condition. Restore heat and hot water to #1a and entire Permit type: Heat | Permit id: E416418 | |||||
Apt. #1a) upgrade 1 1 2 gas header install gas valve, install dresser captin over head gas line from service header to meter bank. Install new met Date: October 21, 2003 Permit type: Plumb | Permit id: E406822 | |||||
Gas fired boiler: make all necessary repairs to gas fired boiler to restore to proper working condition. Restore heat and hot water to #1a and entire Permit type: Heat | Permit id: E416418 | |||||
Gas fired boiler: make all necessary repairs to gas fired boiler to restore to proper working condition. Restore heat and hot water to #1a and entire Permit type: Heat | Permit id: E416418 | |||||
Public area: repair damage concrete steps at entrance to building first (1st) and second (2nd). Remove all work related debris. Note: contractor Date: March 23, 2006 Permit type: Gc | Permit id: E628186 | |||||
(public area) supply and install 12 sq. Ft of aluminum siding at left and rear of building. Install new leader. Demolish approx 2 sq. Ft of old Date: June 25, 2003 Permit type: Gc | Permit id: E323586 | |||||
Remove approximately 15 cubic yards of rubbish and dog feces (waste) from basement. Broom sweep and disinfect entire basement area. (con edison will Permit type: Gc | Permit id: E522424 | |||||
Con edison provides electric to building public areas and heating plant/hot water heater Date: May 12, 2003 Permit type: Util | Permit id: E322379 | |||||
SCORE 82 Equipment work Date: July 11, 2007 Contractor: Dhnyc Corp Permit status: Permit issued | Permit id: 21000410901 | |||||
Plumbing Date: April 1, 2004 Permit status: Permit issued | Permit id: 20084379301 | |||||
SCORE 86 Plumbing Date: August 9, 2007 Contractor: American National Plg And Htg Inc Permit status: Permit issued | Permit id: 21000410901 | |||||
Supply and install new wood tread and riser, at 5th tread up from 1st floor lobby public hall stairs. Note: contractor must contact hpd at 718-636 Date: April 12, 2004 Permit type: Gc | Permit id: E420650 | |||||
Basement: install new water meter at basement. Repair all leaks on cold water supply line in basement, from main shut- off valve to 2nd floor bath Date: March 2, 2005 Permit type: Plumb | Permit id: E522986 | |||||
Con edison provides electric to building public areas and heating plant/hot water heater Date: July 1, 2004 Permit type: Util | Permit id: E502867 | |||||
Building; seal up building as follows : bldg front- stucco seal 3 doors,stucco seal 4 windows and plywood seal 4 windows. Bldg rear-stucco seal 1 door Date: March 11, 2015 Permit type: Gc | Permit id: Ef16957 | |||||
Landing at entrance to building repair the broken and defective cement step, the 1st up from bottom landing at entrance to building. Rem Date: January 15, 2015 Permit type: Gc | Permit id: Ef13024 | |||||
At apt. # 1 - rm - ne2 replace rear entrance door lock all debris must be removed and disposed appropriately. Non-swp. Note: contract Date: March 4, 2010 Value: $29 Permit type: Gc | Permit id: Ea27986 | |||||
Apt. #1: locate and repair leaks coming from waste pipes in ceiling. Sheetrock area at showerbody to stop leaks into apt. Below. Remove all work Date: March 17, 2005 Value: $309 Permit type: Plumb | Permit id: E525209 | |||||
Install new shut -off valve at main in basement Date: March 3, 2005 Value: $67 Permit type: Plumb | Permit id: E523663 | |||||
Apt. 2nd flr: supply and install new kitchen sink complete and properly installed. Restore hot & cold water pressure to new sink. Supply and ins Date: October 27, 2004 Value: $1,425 Permit type: Plumb | Permit id: E511280 | |||||
Apartment #2: bathroom: install 1 window guard and stop. Bedroom: install 1 window guard and stop. Private hallway: install 1 window guard and s Date: July 28, 2003 Value: $193 Permit type: Gc | Permit id: E402318 | |||||
Apt. #1a : install (4) guard and stop. Date: February 22, 2003 Permit type: Gc | Permit id: E316387 | |||||
SCORE 99 Plumbing Date: April 1, 2004 Contractor: Empire Used Boiler Supply Co Inc Permit status: Permit issued | Permit id: 20084379301 | |||||
Remove approximately 15 cubic yards of rubbish and dog feces (waste) from basement. Broom sweep and disinfect entire basement area. (con edison will Permit type: Gc | Permit id: E522424 | |||||
SCORE 89 Date: July 11, 2007 Contractor: Avi Barkai Client: Ronen Negri | Client Address: 73-18 Yellow Stone Boulevard Forest Hills Ny 11375 | Client Phone: (718) 591-2422 | Client Company: Neder 55 Corp. | Permit status: Initial | Permit id: 210004109 | |||||
SCORE 98 Date: April 1, 2004 Contractor: Kevin Boyer Client: Eugene Mcardle | Client Address: 1 Gold Street New York Ny 10038 | Client Phone: (212) 863-7870 | Client Company: Nyc Dept. Of Hpd - Div Of Enforc | Permit status: Initial | Permit id: 200843793 | |||||
SCORE 97 Date: August 9, 2007 Contractor: Vito Mossa Client: Ronen Negri | Client Address: 73-18 Yellow Stone Boulevard Forest Hills Ny 11375 | Client Phone: (718) 591-2422 | Client Company: Neder 55 Corp. | Permit status: Initial | Permit id: 210004109 | |||||
Remove approximately 15 cubic yards of rubbish and dog feces (waste) from basement. Broom sweep and disinfect entire basement area. (con edison will Permit type: Gc | Permit id: E522424 | |||||
SCORE 67 Plumbing Date: April 1, 2004 Contractor: Empire Used Boiler Supply Co,Inc Permit status: Permit issued | Permit id: 20084379301 | |||||
Con edison provides electric to building public areas and heating plant hot water heater Date: July 1, 2004 Permit type: Util | Permit id: E502867 | |||||
Con edison provides electric to building public areas and heating plant hot water heater Date: July 1, 2003 Permit type: Util | Permit id: E401622 | |||||
Remove approximately 15 cubic yards of rubbish and dog feces (waste) from basement. Broom sweep and disinfect entire basement area. (con edison will Permit type: Gc | Permit id: E522424 | |||||
Remove approximately 15 cubic yards of rubbish and dog feces (waste) from basement. Broom sweep and disinfect entire basement area. (con edison will Permit type: Gc | Permit id: E522424 | |||||
(apt. #2) restore gas boiler to proper working order. Ensure adequate heat and hot water to entire building. Restore cold water supply line to entir Date: December 4, 2005 Permit type: Heat | Permit id: E613334 | |||||
Apt. #2 , roof over room# east/ south (4), trace, locate and repair the water leak from shingles roof approx. Sq. Ft. Provide/ install all neces Date: October 20, 2011 Permit type: Gc | Permit id: Ec10024 | |||||
Apt 2 repair and conceal leak at east room and private hall ceiling approx 10x25(2 sq ft lbs fiberglass mat / asphaltic. Roll roffing includes b Date: March 8, 2004 Permit type: Gc | Permit id: E417312 | |||||
Heat related apt. # 1: make all necessary repairs to the cold water supply inside the closet close to the bathroom, replace defective shut off valv Date: February 11, 2015 Permit type: Plumb | Permit id: Ef14973 | |||||
Con edison provide electric to building public areas and heating plant/hot water heater. Date: July 1, 2005 Permit type: Util | Permit id: E601466 | |||||
(apt. #2) trace, locate and repair all roof leaks over livingroom of apt. #2fl, approx. 2 sq. Ft. Demolish existing and install new framing and sh Date: October 20, 2005 Permit type: Gc | Permit id: E610911 | |||||
At basement- at boiler room: remove exisiting defective leaky gas boiler . Provide / install new gas boiler to supply adequate heat to the bldg. S Date: January 30, 2015 Permit type: Heat | Permit id: Ef14199 | |||||
Apartment #2: restore gas to stove and to boiler. Perform integrity test. As per inspection there is no gas to heating plant and apts. Sercure bul Date: October 29, 2004 Permit type: Plumb | Permit id: E511084 | |||||
Con edison provide gas to boiler/hot water heater. Permit type: Util | Permit id: E515151 | |||||
Apt. #2) prepare roof. Install new roofing over apartment. Flash around bird coop. 3 sql ft. Repair celing at foyer. Prime and paint ceiling 30 Date: July 9, 2003 Permit type: Gc | Permit id: E324938 | |||||
As per rc #2006001274402 (enviro-probe, inc.), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845-3 Date: December 8, 2005 Permit type: Delead | Permit id: E615547 | |||||
Apt. #2 remove toilet demo floor to beams 25 sq. Ft. Install new subflooring 25 sq. Ft. Install new cement tile floor 25 sq. Ft. Reinstall toilet. Date: July 10, 2003 Permit type: Gc | Permit id: E324939 | |||||
Con edison provide electric to building public areas and heating plant/hot water heater. Date: December 15, 2004 Permit type: Util | Permit id: E515364 | |||||
Apartment #2: at front room repair 1 wall and entire ceiling approximately 1 square feet total. Sheetrock, tape, compound and paint. Also replace Date: October 29, 2004 Permit type: Gc | Permit id: E511087 | |||||
Heat related remove approx. Five cubic yards of house debris in the basement. Note: contractor must contact h. P. D. At (212) 423-50 / (212) 423-50 Date: February 17, 2015 Permit type: Gc | Permit id: Ef15158 | |||||
Apt. #1: bathroom; demolish entire bathroom ceiling and ceiling framework. Install 3 new joists 3 x 12, an approx. Total of linear ft. And hea Permit type: Gc | Permit id: E523150 | |||||
Con edison provide gas to boiler/hot water heater. Date: December 22, 2004 Permit type: Util | Permit id: E515370 | |||||
Apartment #2: install 1 wood door at front room. Vendor to field measure, for proper size. Remove all work relateddebris. Note: contractor must co Permit type: Gc | Permit id: E511082 | |||||
Con edison provide gas to boiler/hot water heater. Date: July 1, 2005 Permit type: Util | Permit id: E601177 | |||||
Heat related defrost all frozen water pipes in basement and repair all leaks to hot and cold water lines. Note: contractor must contact h. P. D. At ( Permit type: Plumb | Permit id: Ef15160 | |||||
Con edison provide electricity to building public areas and heating plant /hot water heater. Date: October 21, 2005 Permit type: Util | Permit id: E611981 | |||||
Con edison provide gas to boiler/hot water heater. Permit type: Util | Permit id: E515151 | |||||
Apt. #1: bathroom; demolish entire bathroom ceiling and ceiling framework. Install 3 new joists 3 x 12, an approx. Total of linear ft. And hea Permit type: Gc | Permit id: E523150 | |||||
Apartment #2: install 1 wood door at front room. Vendor to field measure, for proper size. Remove all work relateddebris. Note: contractor must co Permit type: Gc | Permit id: E511082 | |||||
Heat related defrost all frozen water pipes in basement and repair all leaks to hot and cold water lines. Note: contractor must contact h. P. D. At ( Permit type: Plumb | Permit id: Ef15160 | |||||
Heat related defrost all frozen water pipes in basement and repair all leaks to hot and cold water lines. Note: contractor must contact h. P. D. At ( Permit type: Plumb | Permit id: Ef15160 | |||||
Apartment #2: install 1 wood door at front room. Vendor to field measure, for proper size. Remove all work relateddebris. Note: contractor must co Permit type: Gc | Permit id: E511082 | |||||
Apt. #1: bathroom; demolish entire bathroom ceiling and ceiling framework. Install 3 new joists 3 x 12, an approx. Total of linear ft. And hea Permit type: Gc | Permit id: E523150 | |||||
Con edison provide gas to boiler/hot water heater. Permit type: Util | Permit id: E515151 | |||||
Con edison provide electricity to building public areas and heating plant hot water heater. Date: October 21, 2005 Permit type: Util | Permit id: E611981 | |||||
Heat related defrost all frozen water pipes in basement and repair all leaks to hot and cold water lines. Note: contractor must contact h. P. D. At ( Permit type: Plumb | Permit id: Ef15160 | |||||
Con edison provide gas to boiler hot water heater. Date: October 21, 2005 Permit type: Util | Permit id: E611838 | |||||
Apartment #2: install 1 wood door at front room. Vendor to field measure, for proper size. Remove all work relateddebris. Note: contractor must co Permit type: Gc | Permit id: E511082 | |||||
Con edison provide gas to boiler hot water heater. Date: December 22, 2004 Permit type: Util | Permit id: E515370 | |||||
Apt. #1: bathroom; demolish entire bathroom ceiling and ceiling framework. Install 3 new joists 3 x 12, an approx. Total of linear ft. And hea Permit type: Gc | Permit id: E523150 | |||||
Heat related remove approx. Five cubic yards of house debris in the basement. Note: contractor must contact h. P. D. At (212) 423-50 (212) 423-50 Date: February 17, 2015 Permit type: Gc | Permit id: Ef15158 | |||||
Con edison provide electric to building public areas and heating plant hot water heater. Date: December 15, 2004 Permit type: Util | Permit id: E515364 | |||||
Con edison provide gas to boiler hot water heater. Permit type: Util | Permit id: E515151 | |||||
At basement- at boiler room: remove exisiting defective leaky gas boiler . Provide install new gas boiler to supply adequate heat to the bldg. S Date: January 30, 2015 Permit type: Heat | Permit id: Ef14199 | |||||
Apt 2 repair and conceal leak at east room and private hall ceiling approx 10x25(2 sq ft lbs fiberglass mat asphaltic. Roll roffing includes b Date: March 8, 2004 Permit type: Gc | Permit id: E417312 | |||||
Con edison provide electric to building public areas and heating plant hot water heater. Date: July 1, 2005 Permit type: Util | Permit id: E601466 | |||||
Apt. #2 , roof over room# east south (4), trace, locate and repair the water leak from shingles roof approx. Sq. Ft. Provide install all neces Date: October 20, 2011 Permit type: Gc | Permit id: Ec10024 | |||||
Heat related defrost all frozen water pipes in basement and repair all leaks to hot and cold water lines. Note: contractor must contact h. P. D. At ( Permit type: Plumb | Permit id: Ef15160 | |||||
Apartment #2: install 1 wood door at front room. Vendor to field measure, for proper size. Remove all work relateddebris. Note: contractor must co Permit type: Gc | Permit id: E511082 | |||||
Apt. #1: bathroom; demolish entire bathroom ceiling and ceiling framework. Install 3 new joists 3 x 12, an approx. Total of linear ft. And hea Permit type: Gc | Permit id: E523150 | |||||
Con edison provide gas to boiler hot water heater. Permit type: Util | Permit id: E515151 |