Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Demolition of an accessory structure. Cmu garage 322 sf. Date: March 28, 2008 Contractor: Lela Design And Construction Inc Client: Pollyann Warkentine | Applicant: Lela Design & Construction Inc | Permit type: Demolition | Permit status: Cls | Current use: Carport - detac | |||||
SCORE 96 Temporary construction power Date: March 28, 2008 Contractor: Electricians Inc Of Boulder Client: Pollyann Warkentine | Applicant: Electricians Inc Of Boulder | Permit type: Electrical | Permit status: Cmp | Completion date: January 28, 2009 | |||||
SCORE 95 Two story addition to existing duplex. 2591 new sfremodel existing portion of structure by removing a kitchen and converting it to bedroom prescriptive energy code. Add three baths Client: Keep Castle | Applicant: Lela Design & Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 18, 2008 | Current use: Single family d | |||||
SCORE 99 Install new water service, (1"), meter pit, abandon existing, (3 4") service. Work to be done @ [2] locs.: 873 & 861 19th. (see pmt2008-01362 & pmt2008-01336 for fees and meter releases) Date: April 24, 2008 Contractor: Dunrite Excavation Inc Client: Keep Castle | Applicant: Dunrite Excavation Inc | Permit type: Water, right-of-way | Permit status: Iss | |||||
SCORE 95 Two story addition to existing duplex. 2591 new sfremodel existing portion of structure by removing a kitchen and converting it to bedroom prescriptive energy code. Add three baths Client: Keep Castle | Permit type: Building, electrical, mechanical, plumbing, water, wastewater | Permit status: Cmp | Completion date: August 18, 2008 | Current use: Single family detached dwelling, additio | Permit id: Pmt2008-01362 | |||||
SCORE 99 Install new water service, (1inch), meter pit, abandon existing, (3 4inch) service. Work to be done @ [2] locs.: 873 & 861 19th. (see pmt2008-01362 & pmt2008-01336 for fees and meter releases) Date: April 24, 2008 Contractor: Dunrite Excavation Inc Client: Keep Castle | Permit type: Water, right-of-way | Permit status: Iss | Permit id: Pmt2008-01554 |