Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 96 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: September 14, 2015 Contractor: Ted Mount Permit type: Residential alterati | Permit status: Issued | Permit id: Pds2015-Resalt- | |||||
SCORE 77 25 reroof for existing sfd. If a re-roof project is proposed, the following specifications apply. Existing roofing material: asphalt proposed roofing material: asphalt manufacturer: owens corning brand and model: oakridge color (if cool roof required): amber, crrc product 12 0890-0009 built-up roofing assembly system number per attached listing report (if applicable):na specific exemption from cool roof requirements (if applicable): no required building inspector field verification (if applicable): yes, complete re-roof note: self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Date: September 29, 2015 Contractor: New Era Roofing Inc Permit type: Misc. (antennas, tennis cts, gazebo) | Permit status: Completed | Permit id: Pds2015-Resalt- | Parcel: 398-350-27-00 |