Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Public area: apply 1bs. Cap sheet, roof flashing and roof cement and roof membrane, flash chimney and skylight area approx. (25x80). Repair fir Date: May 30, 2001 Permit type: Gc | Permit id: E122700 | |||||
As per mini rc #2009000203302 (eas) and hpd specification, perform transmission electron microscopy (tem) analysis of 6 samples for asbestos content a Date: July 23, 2008 Permit type: Asbest | Permit id: E902094 | |||||
Task fee omo for work omo e906428 Date: September 29, 2008 Permit type: Aepfee | Permit id: E910530 | |||||
Make all nescessary repairs including the prime and start of the heating plant to supply heat and hot water to the building. Alternative enforcemen Date: April 21, 2009 Permit type: Heat | Permit id: E935640 | |||||
As per mini rc # 2008000088901(eas), perform polarized light microscopy (plm) gravimetric matrix reduction analysis as per hpd specification of 6 non Date: June 3, 2008 Permit type: Asbest | Permit id: E833779 | |||||
As per rc # 2007003353401 (eastern anal. Svc.,inc), perform total lead analysis of 03 dust wipe sample(s) via environmental protection agency (epa) sw8 Date: June 6, 2007 Permit type: Delead | Permit id: E731510 | |||||
Task fee omo for work omo e901418 Date: September 26, 2008 Permit type: Aepfee | Permit id: E910355 | |||||
Make all necessary repairs to #2 heating plant to supply adauqate heat and hot water. Tenant contact # 718-450-1729. Alternative enforcement p Date: December 22, 2008 Permit type: Heat | Permit id: E920147 | |||||
SCORE 89 Equipment work Date: May 2, 2007 Contractor: Eastern General Construction Cor Permit status: Permit issued | Permit id: 20112120401 | |||||
SCORE 99 Alteration Date: January 30, 2007 Contractor: Payless Construction Inc Permit status: Permit issued | Permit id: 20110392901 | |||||
SCORE 100 Plumbing Date: June 8, 2011 Contractor: Pro Star Plbg And Htg Inc Permit status: Permit issued | Permit id: 22011691501 | |||||
(at basement): demo boiler room ceiling to expose (7) defective joist approx. 1 sq. Ft. And install (7) 3x8x16 (approx. 96 l. Ft.) joist. Sheetro Date: April 2, 2007 Permit type: Gc | Permit id: E724452 | |||||
Provide automatic fuel drop to the above building until further notice#2 fuel . No prime and start necessary (212) 863-8781 Date: January 12, 2009 Permit type: Util | Permit id: E922669 | |||||
Public area; supply and install new 1x 3/16 painted griding with outer angle frame approx, 4 x3 at front of the building. Remove all work related Date: July 28, 2008 Permit type: Gc | Permit id: E902478 | |||||
Perform total lead analysis of 01 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: January 9, 2009 Permit type: Delead | Permit id: E922189 | |||||
Public area; reset 2 loose masonry stone approx 15 sf, at front entrance of building foundation wall. Remove all work related debris. Note: contract Date: July 28, 2008 Permit type: Gc | Permit id: E902485 | |||||
Public area; demo existing side walk and provide new concrete side walk, approx 2 s f, 4 thick 30 psi cast in place with 6x6 w 1. 4 x w1. 4 mes Date: July 21, 2008 Permit type: Gc | Permit id: E901997 | |||||
Apt#1 and cellar; demo living room, private hall and foyer floors approx 162 s. F. Also demo floor walls and ceiling in bathroom approx 2 s. F. Repl Date: September 26, 2008 Permit type: Gc | Permit id: E901418 | |||||
Public area: replace broken wood staircase at cellar with new metal staircase, with ten (10) treads and handrail, 10ft high. Straight run, 3 ft wi Date: January 18, 2007 Permit type: Gc | Permit id: E718902 | |||||
As per mini rc # 2009000203302(eas), perform polarized light microscopy (plm) gravimetric matrix reduction analysis as per hpd specification of 9 non Date: July 17, 2008 Permit type: Asbest | Permit id: E901916 | |||||
Roof; remove entire existing roof membrane, flashing, insulation and sheathing (if necessary). Existing condition of roof sheathing must be visually Date: September 4, 2008 Permit type: Gc | Permit id: E901296 | |||||
(1) supply and install steel building entrance door includes frames, sidelite, transom,door closer, standard hardware, piano hinges, code approved aut Date: February 5, 2009 Permit type: Gc | Permit id: E925249 | |||||
Task fee omo for work omo e901296 Date: September 4, 2008 Permit type: Aepfee | Permit id: E907910 | |||||
Boiler ; dismantle and remove existing heating plant. Provide and install new cast iron similar or equivalent steam boiler to meet heating and hot w Date: September 29, 2008 Permit type: Heat | Permit id: E906428 | |||||
Replace with new the defective and leaky section of hot water pipe line, approx. Qty- l. F in basement using similar materials with all necessary m Permit type: Plumb | Permit id: E923267 | |||||
(public area) install a 2 section of 4 drain pipe at rear of basement. Remove all work related debris. Contractor must sign and return bid. Date: October 19, 2006 Permit type: Plumb | Permit id: E710998 | |||||
As per mini rc # 2009000203302 (eas) and hpd specification, perform polarized light microscopy (plm) analysis of 02 samples for asbestos content uti Date: August 4, 2008 Permit type: Asbest | Permit id: E904080 | |||||
Task fee omo for work omo e902016 Date: August 18, 2008 Permit type: Aepfee | Permit id: E906413 | |||||
Apt #1,2,3, and public hall; scrape plaster , prime and 2 coats of finish paint, to all walls and ceilings throughout the apartments . In the buildi Date: August 18, 2008 Permit type: Gc | Permit id: E902016 | |||||
Apt#1 and public hallway secure all sub flooring. Provide and install 1/2 plywood underlayment and vinyl composition tile (12x12) approx 6 s. F, Permit type: Gc | Permit id: E904328 | |||||
Apt#2 supply and install new window guard complete at south west bed room.(d) remove all work related debris. Note: contractor must contact hpd Date: March 8, 2008 Value: $29 Permit type: Gc | Permit id: E825482 | |||||
Public hall: replace with new the missing baluster at public hall stairs from 1st to 3rd flr. Total 6 balusters, secure entire hand rail & newel post Date: March 7, 2008 Value: $151 Permit type: Gc | Permit id: E825443 | |||||
Public hall remove the defective raditor valve & cap off the radiator valve at 1st flr public hall. Remove all work related debris. Note: cont Date: January 26, 2008 Value: $91 Permit type: Plumb | Permit id: E820840 | |||||
Apt at first floor) at bathroom install new 14 toilet tank and bowl Date: March 7, 2007 Value: $406 Permit type: Plumb | Permit id: E723962 | |||||
(public area) at public hall lobby install 1 baluster at 1st to 2nd floor. Remove all work related debris. Date: October 16, 2006 Value: $124 Permit type: Gc | Permit id: E710991 | |||||
Apt 2) at living room install (2) window guard and stops, at small bedroom install one way screw and stops, at bedroom3 install window guard and stops Date: November 29, 2006 Value: $216 Permit type: Gc | Permit id: E714894 | |||||
Apt#1 and public hallway secure all sub flooring. Provide and install 1/2 plywood underlayment and vinyl composition tile (12x12) approx 6 s. F, Permit type: Gc | Permit id: E904328 | |||||
Replace with new the defective and leaky section of hot water pipe line, approx. Qty- l. F in basement using similar materials with all necessary m Permit type: Plumb | Permit id: E923267 | |||||
SCORE 100 Date: June 8, 2011 Contractor: Jerry Difalco Client: Abraham Gabbay | Client Address: 106-16 Jamaica Avenue Jamaica Ny 11418 | Client Phone: (516) 946-3588 | Client Company: Ohev Management Llc | Permit status: Initial | Permit id: 220116915 | |||||
SCORE 100 Date: May 2, 2007 Contractor: Farrukh Javaid Client: Farrukh Javed | Client Address: 1 Gold Street New York Ny 10038 | Client Phone: (718) 239-7342 | Client Company: Hpd Nyc | Permit status: Initial | Permit id: 201121204 | |||||
Date: January 30, 2007 Client: Eugene Mcardle | Client Address: 1 Gold Street New York Ny 10038 | Client Phone: (212) 863-7870 | Client Company: H.P.D. New York City | Permit status: Initial | Permit id: 201103929 | |||||
SCORE 96 Date: November 26, 2008 Contractor: Harjit Singh Client: Vikram Singh | Client Address: 1 Gold Street Manhattan Ny 10038 | Client Phone: (718) 465-6295 | Client Company: Nyc Hpd | Permit status: Initial | Permit id: 210076772 | |||||
Apt#1 and public hallway secure all sub flooring. Provide and install 1/2 plywood underlayment and vinyl composition tile (12x12) approx 6 s. F, Permit type: Gc | Permit id: E904328 | |||||
Replace with new the defective and leaky section of hot water pipe line, approx. Qty- l. F in basement using similar materials with all necessary m Permit type: Plumb | Permit id: E923267 | |||||
SCORE 95 Date: January 30, 2007 Contractor: Jatinder Singh Client: Eugene Mcardle | Client Address: 1 Gold Street New York Ny 10038 | Client Phone: (212) 863-7870 | Client Company: H.P.D. New York City | Permit status: Initial | Permit id: 201103929 | |||||
Apt#1 and public hallway secure all sub flooring. Provide and install 1 2 plywood underlayment and vinyl composition tile (12x12) approx 6 s. F, Permit type: Gc | Permit id: E904328 | |||||
Replace with new the defective and leaky section of hot water pipe line, approx. Qty- l. F in basement using similar materials with all necessary m Permit type: Plumb | Permit id: E923267 | |||||
Public area; supply and install new 1x 3 16 painted griding with outer angle frame approx, 4 x3 at front of the building. Remove all work related Date: July 28, 2008 Permit type: Gc | Permit id: E902478 | |||||
Apt#1 and public hallway secure all sub flooring. Provide and install 1 2 plywood underlayment and vinyl composition tile (12x12) approx 6 s. F, Permit type: Gc | Permit id: E904328 | |||||
Replace with new the defective and leaky section of hot water pipe line, approx. Qty- l. F in basement using similar materials with all necessary m Permit type: Plumb | Permit id: E923267 |