Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: September 3, 2008 Permit type: Delead | Permit id: E907402 | |||||
As per rc #200400467901 (enviro-probe, inc.), perform total lead analysis of 17 dust wipe sample(s) via environmental protection agency (epa) sw845-3 Date: January 26, 2004 Permit type: Delead | Permit id: E413938 | |||||
At the apt. 6c replace broken entrance door lock,remove all work related debris. Contractor must sign and return bid. Note: contractor must co Date: October 1, 2009 Permit type: Gc | Permit id: Ea11291 | |||||
(apt.#1f) kitchen livingroom & bathroom install (3) window guard and stop. Note: work to be done as per hpd specifications from doh. Note: contracto Date: May 19, 2004 Permit type: Gc | Permit id: E421803 | |||||
As per rc #2005001319001 (enviro-probe, inc.), perform total lead analysis of 4 dust wipe sample(s) via environmental protection agency (epa) sw845-3 Date: June 16, 2005 Permit type: Delead | Permit id: E534536 | |||||
As per rc #2005001319001 (enviro-probe inc), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845-30 Date: June 8, 2005 Permit type: Delead | Permit id: E533429 | |||||
Local law #1 violation : as per rc #20050021221 (linear bk-e,qns) and attached scope of work thoroughly remove all lead violations as per new york ci Date: April 15, 2005 Permit type: Delead | Permit id: E527927 | |||||
As per rc #2005001319003 (enviro-probe, inc.), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845- Date: August 1, 2005 Permit type: Delead | Permit id: E603416 | |||||
Apartment #5f: provide labor and material to stop all leaks above bathroom at ceiling. Repair approximately square feet of damaged ceiling with s Date: July 8, 2005 Permit type: Gc | Permit id: E600220 | |||||
SCORE 100 Equipment work Date: March 10, 2011 Contractor: Ns Engineers Pc Permit status: Permit issued | Permit id: 32008583001 | |||||
SCORE 100 Equipment work Date: September 18, 1995 Contractor: A. International Ltd Permit status: Permit issued | Permit id: 30046569001 | |||||
SCORE 82 Equipment work Date: July 18, 1991 Contractor: A And A Heating Corp Permit status: Permit issued | Permit id: 30010417001 | |||||
SCORE 77 Plumbing Date: July 18, 1991 Contractor: J Jekowsky And Son Permit status: Permit issued | Permit id: 30010417001 | |||||
SCORE 96 Equipment work Date: September 13, 1995 Contractor: Protection System Specialist Inc Permit status: Permit issued | Permit id: 30046569001 | |||||
SCORE 100 Equipment work Date: June 24, 2009 Contractor: G Bauer Inc Permit status: Permit issued | Permit id: 32004109401 | |||||
SCORE 93 Plumbing Date: September 18, 1995 Contractor: Rigid Plg And Htg Permit status: Permit issued | Permit id: 30046569001 | |||||
SCORE 100 Equipment work Date: May 3, 1991 Contractor: Master Fire Prevention Systems Permit status: Permit issued | Permit id: 30008498601 | |||||
SCORE 100 Alteration Date: July 25, 2011 Contractor: Arete Development Inc Permit status: Permit issued | Permit id: 32033595401 | |||||
SCORE 99 Alteration Date: March 26, 2010 Contractor: Telcom Engineering Group Permit status: Permit issued | Permit id: 32013751601 | |||||
Plumbing Date: February 7, 2011 Permit status: Permit issued | Permit id: 32004109402 | |||||
Plumbing Date: June 24, 2009 Permit status: Permit issued | Permit id: 32004109401 | |||||
SCORE 100 Equipment work Date: November 22, 2010 Contractor: Master Fire Prev. Sys Inc Permit status: Permit issued | Permit id: 32024259001 | |||||
As per rc #2006001254202 (enviro-probe, inc.), perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw845 Date: June 14, 2006 Permit type: Delead | Permit id: E636632 | |||||
Public hall(4th floor ceiling) 1) apply a two coat stucco at ceiling complete with wire mesh . Estimated sq. Ft. Apply coat of plaster sq. Ft Date: May 26, 2006 Permit type: Gc | Permit id: E634787 | |||||
Fire escape drop ladder . Date: February 5, 2010 Permit type: Gc | Permit id: Ea24404 | |||||
Replace front fire escape drop ladder. Prime and paint. Note: contractor must call lydia santos at (718) 254-89 with start date. Contractor Date: June 20, 2000 Permit type: Gc | Permit id: E023242 | |||||
Public hall: 1st story-two wings install stops 2nd-story - two wings installstops 3rd story- two wings install stops. Date: May 23, 2006 Value: $67 Permit type: Gc | Permit id: E634796 | |||||
Local law #1 violation : as per attached scope of work thoroughly remove all lead violations as per new york city administrative code 27-2056. 11 and Date: June 10, 2005 Value: $159 Permit type: Delead | Permit id: E534284 | |||||
Install window guard complete toward the 3 1/2 floor right side wing. Date: February 27, 2004 Permit type: Gc | Permit id: E417900 | |||||
Apartment #2g: kitchen: re-install 1 window guard and stop. Bathroom: re-install 1 window guard and stop. Livingroom: re-install 2 window guards Date: November 7, 2003 Permit type: Gc | Permit id: E408390 | |||||
SCORE 82 Alteration Date: May 15, 2012 Contractor: Telcom Engineering Gp In Permit status: Permit issued | Permit id: 32047135101 | |||||
SCORE 100 Alteration Date: May 14, 2012 Contractor: Squan Construction Servic Permit status: Permit issued | Permit id: 32047133301 | |||||
SCORE 86 Alteration Date: October 24, 2012 Contractor: Quanta Wireless Solutions Permit status: Permit issued | Permit id: 32047133302 | |||||
SCORE 100 Plumbing Date: February 7, 2011 Contractor: Alan E. Rosenberg Inc Permit status: Permit issued | Permit id: 32004109402 | |||||
SCORE 100 Plumbing Date: June 24, 2009 Contractor: Alan E. Rosenberg Inc Permit status: Permit issued | Permit id: 32004109401 | |||||
SCORE 82 Alteration Date: May 15, 2012 Contractor: Telcom Engineering Gp In Permit status: Permit issued | Permit id: 32047135101 | |||||
Date: May 15, 2012 Client: Sperlin Dovie | Client Address: 549 Empire Blvd Brooklyn Ny 11225 | Client Phone: (718) 953-0954 | Client Company: 86 Realty Property Llc | Permit status: Initial | Permit id: 320471351 | |||||
SCORE 100 Date: July 18, 1991 Contractor: Neal Rudikoff Client: Joseph Spitzer | Client Address: 54 13th Ave Brooklyn Ny 11219 | Client Company: Allstate Rlty | Permit status: Initial | Permit id: 300104170 | |||||
SCORE 100 Date: July 18, 1991 Contractor: Marvin Jekowsky Client: Joseph Spitzer | Client Address: 54 13th Ave Brooklyn Ny 11219 | Client Company: Allstate Rlty | Permit status: Initial | Permit id: 300104170 | |||||
SCORE 98 Date: July 25, 2011 Contractor: John Ettere Client: Dovie Sperlin | Client Address: 549 Empire Boulevard Brooklyn Ny 11225 | Client Phone: (718) 953-0954 | Client Company: 86 Realty Property Llc | Permit status: Initial | Permit id: 320335954 | |||||
SCORE 100 Date: March 26, 2010 Contractor: Joseph Roseitt Client: Sperlman Sperlman | Client Address: 549 Empire Blvd Brooklyn Ny 11225 | Client Phone: (718) 953-0344 | Client Company: 86 Realty Property Llc | Permit status: Initial | Permit id: 320137516 | |||||
SCORE 79 Date: May 14, 2012 Contractor: Brian Silbert Client: Sperlin Dovie | Client Address: 549 Empire Blvd Brooklyn Ny 11225 | Client Phone: (718) 953-0954 | Client Company: 86 Reality Property Llc | Permit status: Renewal | Permit id: 320471333 | |||||
SCORE 100 Date: May 14, 2012 Contractor: John Celentano Jr Client: Sperlin Dovie | Client Address: 549 Empire Blvd Brooklyn Ny 11225 | Client Phone: (718) 953-0954 | Client Company: 86 Reality Property Llc | Permit status: Initial | Permit id: 320471333 | |||||
SCORE 100 Date: May 15, 2012 Contractor: Joseph Roseitt Client: Sperlin Dovie | Client Address: 549 Empire Blvd Brooklyn Ny 11225 | Client Phone: (718) 953-0954 | Client Company: 86 Realty Property Llc | Permit status: Initial | Permit id: 320471351 | |||||
SCORE 98 Plumbing Date: February 7, 2011 Contractor: Alan E. Rosenberg, Inc Permit status: Permit issued | Permit id: 32004109402 | |||||
SCORE 98 Plumbing Date: June 24, 2009 Contractor: Alan E. Rosenberg, Inc Permit status: Permit issued | Permit id: 32004109401 | |||||
Install window guard complete toward the 3 1 2 floor right side wing. Date: February 27, 2004 Permit type: Gc | Permit id: E417900 | |||||
As per rc #2005001319003 (enviro-probe, inc.), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845-3 Date: July 12, 2005 Permit type: Delead | Permit id: E600942 | |||||
As per rc #20020007864 (emsl), perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw845-3050-74 method Date: June 27, 2002 Permit type: Delead | Permit id: E222729 | |||||
As per rc #20020007864 (emsl), perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method Date: July 24, 2002 Permit type: Delead | Permit id: E301102 | |||||
Erp ll/38 violation: as per tertiary rc #20020001927 (abax) and attached scope of work thoroughly remove all lead violations as per new york city hea Date: July 5, 2002 Permit type: Delead | Permit id: E223111 | |||||
Apartment #5g: remove the mold and mildew from the bathroom approximately 35 square feet and prime and paint entire bathroom. Note: contractor mus Date: August 16, 2004 Permit type: Gc | Permit id: E505968 | |||||
(apt #5g) at apartment entrance door: remove existing defective battered entrance door. Provide a new h. M. Door with standard hardware, self-closi Date: March 4, 2009 Permit type: Gc | Permit id: E928692 | |||||
Erp ll 38 violation: as per tertiary rc #20020001927 (abax) and attached scope of work thoroughly remove all lead violations as per new york city hea Date: July 5, 2002 Permit type: Delead | Permit id: E223111 | |||||
As per rc #2005001319001 (enviro-probe, inc.), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845- Date: March 1, 2005 Permit type: Delead | Permit id: E522850 | |||||
At apt. 2c above apt. 2b: trace and repair all leaks in bathroom. At apt. 2b: install new g. W. B toward bathroom ceiling, approx. 35 sqft. Prime and Date: January 27, 2005 Permit type: Gc | Permit id: E518905 | |||||
Apt# 1d: clear obstruction in toilet bowl restore toilet to pwo. Remove all work related debris note: contractor must contact h. P. D. @ (71 Date: February 10, 2010 Permit type: Stopag | Permit id: Ea25618 | |||||
Remove all obstructions in water closet waseline in the bathroom apt 1d 4th story Date: March 4, 2010 Permit type: Stopag | Permit id: Ea26733 | |||||
R c 20141419802 apt 3b: as per the requirement contract with hpd, provide and install 2 window guards throughout apartment. Remove all work relat Date: April 4, 2017 Permit type: Gc | Permit id: Eh14191 |