Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Date: March 23, 2015 Contractor: Valentino Buono Client: Devendra Balkaran | Client Address: 94-19 127 Street Queens Ny 11419 | Client Phone: (214) 748-3647 | Expiration date: March 22, 2016 | Permit id: 421090982 | |||||
SCORE 96 Date: March 17, 2015 Contractor: Arif Hussain Client: Devendra Balkaran | Client Address: 94-19 127th Street Queens Ny 11419 | Client Phone: (214) 748-3647 | Expiration date: October 10, 2015 | Permit id: 421023617 | |||||
SCORE 100 Date: March 23, 2015 Contractor: Valentino Buono Client: Devendra Balkaran | Client Address: 94-19 127 Street Queens Ny 11419 | Client Phone: (347) 837-0492 | Permit status: Initial | Expiration date: March 22, 2016 | Permit id: 421090982 | |||||
SCORE 96 Date: March 17, 2015 Contractor: Arif Hussain Client: Devendra Balkaran | Client Address: 94-19 127th Street Queens Ny 11419 | Client Phone: (347) 837-0492 | Permit status: Initial | Expiration date: October 10, 2015 | Permit id: 421023617 | |||||
SCORE 95 Alteration Date: March 17, 2015 Contractor: Kings Star Construction C Permit status: Permit issued | Permit id: 42102361701 | |||||
Plumbing Date: March 17, 2015 Permit status: Permit issued | Permit id: 42102361701 | |||||
SCORE 100 Plumbing Date: March 17, 2015 Contractor: Precision Plbg Svcs. Inc Permit status: Permit issued | Permit id: 42102361701 | |||||
At boiler room replace damaged bilco doors to rear yard icludes restorations, (this condition is causing pipes to freeze) properly seal all gaps. Re Date: February 18, 2011 Permit type: Gc | Permit id: Eb22599 | |||||
Provide single fuel drop with prime and start #2 fuel fill tank. Please report any problems im mediately to esb fuel unit. (212) 863-8781 Date: February 11, 2011 Permit type: Util | Permit id: Eb22652 | |||||
At cellar: pump-out sewage / water including at boiler room, clear sewer line stoppages from house trap to street & trap into bldg and stack. Was Date: February 11, 2011 Permit type: Stopag | Permit id: Eb22600 | |||||
Provide single fuel drop with prime and start #2 fuel fill tank. Please report any problems immediately to esb fuel unit. (212)863-8781 Date: February 24, 2010 Permit type: Util | Permit id: Ea26513 | |||||
At boiler room: adjust and tune # 2 oil fired boiler and also replace missing cap/plug at exterior of bldg oil fill supply line and replace miss Date: February 11, 2011 Permit type: Heat | Permit id: Eb22604 | |||||
As per mini rc # 2010000070201 (eas) and hpd specification, perform polarized light microscopy (plm) analysis of 3 samples for asbestos content util Date: March 19, 2010 Permit type: Asbest | Permit id: Ea29123 | |||||
As per rc # 2010000115001 (b&n&k), perform asbestos abatement work as per hpd specification throughout basement and boiler room, on 66 ft. Of pipe in Date: March 26, 2010 Permit type: Asbest | Permit id: Ea29126 | |||||
As per mini rc # 2010000181801 (cuno enviornmental corp,) perform air sampling and analysis in accordance with hpd mini requirement contract specifica Date: March 23, 2010 Permit type: Asbest | Permit id: Ea29128 | |||||
At bsmt: vacuum, clean boiler, smoke pipe and chimney base, tune and adjust to proper working order. Replace transformer, back chamber, and approx. Date: March 5, 2010 Permit type: Heat | Permit id: Ea27246 | |||||
At 2nd floor apt: replace cracked toilet bowl complete with tank, deep wax ring, bolts and water supply line. At boiler room rear yard door at ce Date: February 15, 2011 Permit type: Plumb | Permit id: Eb22596 | |||||
Remove existing heating plant and install new cast iron/steel #2 oil hot water system boiler to supply adequate heat to building. Supply and install Date: March 16, 2010 Permit type: Heat | Permit id: Ea28905 | |||||
At entire cellar & boiler room: repair existing electrical fixtures and restore lighting throughout & power to boiler. Remove debris. Heat r Date: February 15, 2011 Permit type: Elec | Permit id: Eb22609 | |||||
At boiler room: restore gas fired hot water heater to proper working conditions. Repair pilot assembly, thermo coupling and adaptor, flue pipe an Date: February 23, 2011 Permit type: Plumb | Permit id: Eb22605 | |||||
#2 oil boiler: make all necessary repairs to #2 oil boiler to restore to proper working condition. Restore heat to entire building. Note: contra Date: November 25, 2008 Permit type: Heat | Permit id: E916279 | |||||
Apt # 1 fl@ kitchen: remove all obstruction and repair the broken or defective sink waste line in the kitchen located at 1st fl, 1st story. Remove Date: October 8, 2009 Permit type: Plumb | Permit id: Ea12111 | |||||
Provide single fuel drop with prime and start #2 fuel fill tank. Please report any problemsimmediately to esb fuel unit. (212) 863-8781 Date: December 7, 2009 Permit type: Util | Permit id: Ea18226 |