Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Merck: remodel of 33 sf for the existing tenant. Scope of work includes converting conference rooms to offices and installation of new exterior diesel fuel storage tank for the (e) generator. ![]() ![]() Permit status: Permit issued | Permit id: 12000-02309 | |||||
SCORE 67 Landscape renovation (entire site) approx. 14,0 sf ![]() ![]() Permit status: Permit issued | Permit id: 14000-02587 | |||||
SCORE 95 12000-02309: fire rating classification revision re-reate existing 1-hour lobby ![]() ![]() Permit status: Permit issued | Permit id: 14rev-00528 | |||||
SCORE 99 12000-02098: updated drawings per field inspection comments ![]() ![]() Permit status: Permit issued | Permit id: 14rev-00352 | |||||
SCORE 82 Existing tenant "merck" tenant improvement, lab equipment replacement upgrades to (3) rooms [334-04, 334-05, 334-07] and associated mechanical and electrical modifications. ![]() ![]() Permit status: Permit issued | Permit id: 13000-00536 | |||||
SCORE 82 New cooling tower with enclosure (outside), new chiller (inside) and exhaust fan installation. ![]() ![]() Permit status: Permit issued | Permit id: 12000-02900 | |||||
SCORE 96 Stanford school of medicine good management practices lab facility: ti and u&o for 130 sf on first floor. No exterior renovations. U&o sent on 08 26 16 with brc information ![]() ![]() Permit status: Finaled | Permit id: 15000-00523 | |||||
SCORE 94 Stanford school of medicine: run process piping from cylinders to equipment Permit status: Finaled | Permit id: 16000-02158 | |||||
SCORE 99 Merck: voluntary accessibility upgrades: accessibility upgrades to building entrance, path of travel to the bathroom cores and common areas, and the bathroom cores. Modify curb ramp at accessible parking to comply with code 10 24 14: permit reactivation granted by george hoyt ![]() ![]() Permit status: Permit issued | Permit id: 12000-02098 | |||||
SCORE 96 15-523: revision inlcudes emergency diesel generator installed. At parking area. Not including anchiorage and transfer switch. ![]() ![]() Permit status: In plan check | Permit id: 15rev-00357 | |||||
SCORE 99 Ti for existing tenant "merck" 16 sf scope of work includes minor wall modifications and relocation of equipment in lab and ahu replacement Permit status: Permit issued | Permit id: 15000-01833 | |||||
SCORE 96 15000-00523: revision to add disabled access upgrade compliance checklist to plan per robert dunbar ![]() ![]() Permit status: Permit issued | Permit id: 15rev-00423 | |||||
SCORE 84 Ti and u&o for "rr donnelley" to occupy suite a. Scope of work includes voluntary accessibility upgrade to existing toilet core, including associated electrical and plumbing ![]() ![]() Permit status: Finaled | Permit id: 16000-00141 | |||||
SCORE 94 Existing "stanford school of medicine" lab equipment installation. Associated electrical and process piping. Permit status: Permit issued | Permit id: 17000-01576 |