SCORE 95 Remove existing single story transmitter building. Date: May 23, 2014 Contractor: City Of Sea F And Fd Applicant: Aman, Eric | Permit type: Demolition | Permit status: Permit issued | Current use: Commercial | Permit id: 6417743 | |||||
SCORE 95 Remove existing single story transmitter building and construct new, larger transmitter building for city of seattle department of information and technology and occupy, per plan. Existing structure to be demolished by separate permit. Applicant: Aman, Eric | Permit type: Construction | Permit status: Permit issued | Current use: Commercial | Permit id: 6380340 | |||||
SCORE 95 Alterations and expansion of maple leaf park including site work, ball field, baseball courts, play areas and picnic shelter, per plans Applicant: Baldwin, Kim | Permit type: Construction | Permit status: Permit issued | Current use: Commercial | Permit id: 6301116 | |||||
King county puget sound emergency radio network (psern) antennas and microwave attached to an existing tower. Applicant: Telschow, Sarah | Permit type: Construction | Permit status: Initial information colle | Current use: Commercial | Permit id: 6517683 | |||||
SCORE 95 Replace existing mg open-water reservoir with a new reinforced concrete mg duel-cell buried reservoir, per plans. Applicant: Murphy, Stephanie | Permit type: Construction | Permit status: Permit issued | Expiration date: June 1, 2015 | Current use: Commercial | Permit id: 6176181 | |||||
SCORE 99 Install hvac controls Date: August 17, 2015 Contractor: Milne Electric Incorporated Permit type: Electrical | Permit status: Permit closed | Completion date: August 18, 2015 | Expiration date: August 16, 2016 | Current use: Commercial | Permit id: 6490094 | |||||
SCORE 100 Fm-2 fire suppression Date: May 20, 2015 Contractor: Suppression Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 5, 2015 | Expiration date: May 20, 2016 | Current use: Commercial | Permit id: 6460347 | |||||
SCORE 89 Two temp power poles only. Associated bldg permit #6380340 Date: February 18, 2015 Contractor: Capstone Solutions Inc Permit type: Electrical | Permit status: Permit closed | Completion date: March 3, 2015 | Expiration date: February 18, 2016 | Current use: Commercial | Permit id: 6459998 | |||||
SCORE 95 Replace 4001 facp with 4010es facp; working in conjunction with city of seattle public utilities. (new panel) Date: December 5, 2014 Contractor: Simplexgrinnell Lp Permit type: Electrical | Permit status: Permit closed | Completion date: January 23, 2015 | Expiration date: December 5, 2015 | Current use: Commercial | Permit id: 6449424 | |||||
SCORE 99 8979. Installation of access control and cctv security. Date: April 4, 2014 Contractor: Entrance Controls Inc Permit type: Electrical | Permit status: Permit closed | Completion date: May 6, 2014 | Expiration date: April 4, 2015 | Current use: Commercial | Permit id: 6411829 | |||||
SCORE 98 Amp feeder to job trailer Date: March 8, 2010 Contractor: Bainbridge Island Electric Permit type: Electrical | Permit status: Permit closed | Completion date: March 24, 2010 | Expiration date: March 8, 2011 | Current use: Commercial | Permit id: 6242534 | |||||
SCORE 98 Wiring of new 4 amp, 4 v, 3 phase service for maple leaf reservoir Permit type: Electrical | Permit status: Permit closed | Completion date: June 13, 2012 | Expiration date: March 24, 2011 | Current use: Commercial | Permit id: 6241494 | |||||
SCORE 98 2 amp overhead temporary service Date: November 23, 2009 Contractor: Bainbridge Island Electric Permit type: Electrical | Permit status: Permit closed | Completion date: December 15, 2009 | Expiration date: November 23, 2010 | Current use: Industrial | Permit id: 6233947 | |||||
SCORE 98 1 amp 240v temporary service Date: November 10, 2009 Contractor: Bainbridge Island Electric Permit type: Electrical | Permit status: Permit closed | Completion date: December 15, 2009 | Expiration date: November 10, 2010 | Current use: Industrial | Permit id: 6232788 | |||||
SCORE 98 Two ( 2 ) additional 1 amp feeders Date: September 30, 2009 Contractor: Bainbridge Island Electric Permit type: Electrical | Permit status: Permit closed | Completion date: October 1, 2009 | Expiration date: September 30, 2010 | Current use: Industrial | Permit id: 6228753 | |||||
SCORE 98 2 amp temporary service Date: September 23, 2009 Contractor: Bainbridge Island Electric Permit type: Electrical | Permit status: Permit closed | Completion date: October 1, 2009 | Expiration date: September 23, 2010 | Current use: Industrial | Permit id: 6228003 | |||||
SCORE 100 100amp service to power qwest coolped Date: July 30, 2009 Contractor: Thompson Elect Constrs Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 10, 2009 | Expiration date: July 30, 2010 | Current use: Commercial | Permit id: 6222922 | |||||
SCORE 99 Low voltage voice and data cabling Date: October 4, 2006 Contractor: Netversant Seattle Inc Permit type: Electrical | Permit status: Permit finaled | Completion date: January 10, 2007 | Expiration date: October 4, 2007 | Current use: Commercial | Permit id: 6114984 | |||||
SCORE 99 Adding (2) 20amp circuits and (12) low voltage devices for camera connections. Date: September 26, 2006 Contractor: Evergreen Power Systems Inc Permit type: Electrical | Permit status: Permit finaled | Completion date: October 20, 2006 | Expiration date: September 26, 2007 | Current use: Commercial | Permit id: 6114008 | |||||
SCORE 92 Low voltage installation of access control, cctv and instrusion detection system Date: September 23, 2005 Contractor: Netversantwashington Inc Permit type: Electrical | Permit status: Permit finaled | Completion date: January 17, 2007 | Expiration date: September 23, 2006 | Current use: Commercial | Permit id: 6073490 | |||||
SCORE 56 Install 1 amp sub-panel and add (4) amp/1 volt circuits and receptacles. Date: June 21, 2004 Contractor: Washington State Department Of Transportation Permit type: Electrical | Permit status: Permit finaled | Completion date: April 2, 2008 | Expiration date: June 21, 2005 | Current use: Commercial | Permit id: 6037347 | |||||
SCORE 95 Council land use action to expand a public facility by allowing a new 713 sq. Ft. Transmitter building (city of seattle, department of information and technology). Existing 4 sq. Ft. Structure to be demolished. Applicant: Dominguez, Carl | Permit type: Council action | Permit status: Permit closed | Current use: Commercial | Permit id: 3016073 | |||||
SCORE 95 Land use application to grade 8,0 cu. Yds. Of material, upgrade existing park (maple leaf park) and develop additional park area on top of the lidded existing public facility (maple leaf reservoir). The components of the project include lighted pedestrian pathways, new pickle ball (2) and basketball (1) courts, play area, open space, picnic shelter, view lookout and landscaping. Determination of non-significance prepared by the seattle parks & recreation. Applicant: Baldwin, Kim | Permit type: Sepa threshold determination | Permit status: Permit closed | Current use: Commercial | Permit id: 3012863 | |||||
SCORE 95 Land use application to replace existing million gallon open-water reservoir with a buried million gallon concrete reservoir in an environmentally critical area (maple leaf reservoir). Existing reservoir to be demolished. Project includes 221,1 cu. Yds. Of grading. Determination of non-significance prepared by seattle public utilities. Date: May 4, 2009 Contractor: City Of Sea Spu Engineer Svcs Applicant: Schroeder, Carole | Permit type: Sepa threshold determination | Permit status: Permit issued | Current use: Commercial | Permit id: 3009016 | |||||
SCORE 95 Installation of mitsubishi system: acu-1,2,3,4 and hp-1,2,3 Date: July 13, 2015 Contractor: Design Air Ltd Applicant: Design Air Ltd | Permit type: Refrigeration | Permit status: Permit closed | Completion date: August 18, 2015 | Expiration date: January 13, 2017 | Current use: Single family / duplex | Permit id: 6483992 | |||||
SCORE 96 Reconnect to existing side sewer. Pe eval/cert required. Change: pe eval/cert not required per 21. 16. 240. B. Date: June 23, 2015 Contractor: Seattle Pipeworks Inc Applicant: Seattle Pipeworks, Inc | Permit type: Side sewer | Permit status: Permit closed | Completion date: July 23, 2015 | Expiration date: December 23, 2016 | Current use: Industrial | Permit id: 6480821 | |||||
SCORE 95 Adding (2) 20amp circuits and (12) low voltage devices for camera connections. Date: September 26, 2006 Contractor: Evergreen Power Systems, Inc Permit type: Electrical | Permit status: Permit finaled | Completion date: October 20, 2006 | Expiration date: September 26, 2007 | Current use: Commercial | Permit id: 6114008 | |||||
SCORE 89 Days get started for branch circuit only. Plan review done #6457197 3-23-15 dwr get started extended for more days. Date: March 2, 2015 Contractor: Capstone Solutions Inc Permit type: Electrical | Permit status: Permit closed | Completion date: April 20, 2015 | Expiration date: May 2, 2015 | Current use: Commercial | Permit id: 6461780 | |||||
SCORE 95 3 16 2015 - cancelled customer log #15-455 low volt security Date: March 4, 2015 Contractor: Adt Llc Permit type: Electrical | Permit status: Permit issued | Expiration date: March 3, 2016 | Current use: Commercial | Permit id: 6462320 | |||||
SCORE 64 Construct and maintain one 10-foot curbcut along ne 82nd street approximately 4 feet west of east property line". Date: August 21, 2013 Contractor: Paul Brothers Inc Applicant: Bloomer, Matt | Permit type: Site development | Permit status: Ap closed | Current use: Commercial | Permit id: 6379570 | |||||
Construct alterations to an existing minor communications antenna tower (psern) and existing equipment shelter at grade, per plan. Mechanical is included. Date: January 20, 2017 Value: $50,000 Applicant: Telschow, Sarah | Permit type: Construction | Permit status: Permit issued | Expiration date: July 20, 2018 | Current use: Institutional | Permit id: 6517683 | |||||
SCORE 56 Install 1 amp sub-panel and add (4) amp 1 volt circuits and receptacles. Date: June 21, 2004 Contractor: Washington State Department Of Transportation, Permit type: Electrical | Permit status: Permit finaled | Completion date: April 2, 2008 | Expiration date: June 21, 2005 | Current use: Commercial | Permit id: 6037347 | |||||
SCORE 95 Reconnect to existing side sewer. Pe eval cert required. Change: pe eval cert not required per 21. 16. 240. B. Date: June 23, 2015 Contractor: Seattle Pipeworks, Inc Applicant: Seattle Pipeworks, Inc | Permit type: Side sewer | Permit status: Permit closed | Completion date: July 23, 2015 | Expiration date: December 23, 2016 | Current use: Industrial | Permit id: 6480821 | |||||
SCORE 95 Replace segments of the outlet, drain, & surge pipes on the south side of the maple leaf reservoir. Contractor: City Of Sea Spu Engineer Svcs Applicant: Murphy, Stephanie | Permit status: Initial information colle | Current use: Commercial | Permit id: 3011878 | |||||
SCORE 89 Upgrade from 2 amps to 3 amps for new rf building. 3/2/15 change to 4 amp service Permit type: Electrical | Permit status: Permit closed | Completion date: August 11, 2015 | Expiration date: February 2, 2016 | Current use: Commercial | Permit id: 6457197 | |||||
SCORE 98 1 amp 120 2 v single phase temporary service 3 15 2011 jnl - about to expire letter mailed Date: March 4, 2010 Contractor: Bainbridge Island Electric Permit type: Electrical | Permit status: Permit closed | Completion date: May 19, 2011 | Expiration date: March 4, 2011 | Current use: Industrial | Permit id: 6242370 |