Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 89 Bathrm remodel Applicant: Nissan Vered | Permit status: Permisud | Permit id: 1206280049 | |||||
SCORE 79 N roof mount pv solar system panels Applicant: De Los Santos Manuel | Permit status: Permisud | Permit id: 1207260027 | |||||
SCORE 89 Bathrm remodel Date: June 28, 2012 Contractor: Reliable Remodelers Inc Applicant: Nissan Vered | Permit status: Permisud | Permit id: 1206280025 | |||||
SCORE 89 (6) recessed lights in hall way Date: July 2, 2012 Contractor: Reliable Remodelers Inc Applicant: Nissan Vered | Permit status: Permisud | Permit id: 1207020024 | |||||
SCORE 79 Install roof top solar panel 1 inverter Date: July 26, 2012 Contractor: Ronco Solar Applicant: De Los Santos Manuel | Permit status: Permisud | Permit id: 1207260014 | |||||
SCORE 89 A/c disconnect Date: August 1, 2012 Contractor: Reliable Remodelers Inc Applicant: Nissan Vered | Permit status: Permisud | Permit id: 1208010011 | |||||
SCORE 59 2 amp panel upgrade Date: August 16, 2012 Contractor: S M Electric Connection Inc Applicant: Shalom Meshulam Vered | Permit status: Permisud | Permit id: 1208160032 | |||||
SCORE 89 A/c,furnace and ductwork Date: August 1, 2012 Contractor: Reliable Remodelers Inc Applicant: Nissan Vered | Permit status: Permisud | Permit id: 1208010004 | |||||
SCORE 89 Repipe 12 fixtures and main line Date: July 2, 2012 Contractor: Reliable Remodelers Inc Applicant: Nissan Vered | Permit status: Permisud | Permit id: 1207020016 |