Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: August 6, 2015 Contractor: M N Mauzy Mechanical Inc Permit type: Mechanical - hvac change out | Permit status: Issued | Permit id: Pds2015-Resalt- | |||||
22 sq. Ft. Reroof if a re-roof project is proposed, the following specifications apply. Existing roofing material: asphalt proposed roofing material: asphalt manufacturer: gaf brand and model: tinmberline cool series color (if cool roof required): antique slate 0676-0043 built-up roofing assembly system number per attached listing report (if applicable): specific exemption from cool roof requirements (if applicable): required building inspector field verification (if applicable): note: self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Date: August 21, 2015 Permit type: Residential alterati | Permit status: Issued | Permit id: Pds2015-Resalt- | Parcel: 583-513-05-00 | |||||
22 sq. Ft. Reroof if a re-roof project is proposed, the following specifications apply. Existing roofing material asphalt proposed roofing material asphalt manufacturer gaf brand and model tinmberline cool series color (if cool roof required) antique slate 0676-0043 built-up roofing assembly system number per attached listing report (if applicable) specific exemption from cool roof requirements (if applicable) required building inspector field verification (if applicable) note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Date: August 21, 2015 Permit type: Misc. (antennas, tennis cts, gazebo) | Permit status: Completed | Permit id: Pds2015-Resalt- | Parcel: 5835130500 |