Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 96 Roof mount residential solar pv for existing sfd with existing residential main electrical service upgrade - 200a - the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: April 27, 2017 Contractor: Zero Energy Contracting Inc Permit type: Addn | Permit status: Completed | Completion date: June 16, 2017 | Permit id: Pds2017-Resalt- | |||||
SCORE 82 2,2 sqft re-roof to (e) sfd. If a re-roof project is proposed, the following specifications apply. Existing roofing material comp proposed roofing material comp manufacturer owens corning brand and model tru-def duration color (if cool roof required) orange (amber) crrc #0890-0009 built-up roofing assembly system number per attached listing report (if applicable) n a specific exemption from cool roof requirements (if applicable) n a required building inspector field verification (if applicable) yes note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Addn | Permit status: Issued expired | Permit id: Pds2017-Resalt- | |||||
SCORE 96 Roof mount residential solar pv for existing sfd with existing residential main electrical service upgrade - 200a - the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: April 27, 2017 Contractor: Zero Energy Contracting Inc Permit type: Res roof mt solar pv | Permit status: Completed | Permit id: Pds2017-Resalt- |