Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 Plumbing ![]() ![]() Permit status: Permit issued | Permit id: 32074070201 | |||||
SCORE 89 Equipment work ![]() ![]() Permit status: Permit issued | Permit id: 32074070201 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative ![]() Permit type: Delead | Permit id: Eb22048 | |||||
Local law #1 violation : as per hpds abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new yor ![]() Permit type: Delead | Permit id: E618489 | |||||
As per rc #2006001254202 (enviro-probe, inc.), perform total lead analysis of 4 dust wipe sample(s) via environmental protection agency (epa) sw845- ![]() Permit type: Delead | Permit id: E620291 | |||||
Make all necessary repairs to #2 oil boiler to restore to proper working order. Restore heat and hot water to entire building. Note:contractor mus ![]() Permit type: Heat | Permit id: E922104 | |||||
Provide single fuel drop with prime and start....# 2 oil... Tank capacity = 275 gallons. Please report access or any other problems immediately to erp ![]() Permit type: Util | Permit id: E921563 | |||||
Bldg : adjust #2 oil boiler to proper working order,scalding hot water at apt#3l at kitchen (165 degree f) . Remove all work related debris. Non-s. ![]() Permit type: Heat | Permit id: Ea22765 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio ![]() Permit type: Delead | Permit id: Eb22096 | |||||
Perform total lead analysis of 03 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio ![]() Permit type: Delead | Permit id: Eb25456 |