Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Gas leak repair at the main Date: March 30, 2011 Contractor: Xcel Energy Client: Nancy Horn,John Horn Jr | Applicant: Xcel Energy | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Remove existing shingles and re-roof residence with dimensional shingles. 43 squares, roof pitch represented by contractor to be 4:12. Date: March 6, 2014 Contractor: Boulder Roofing Inc Client: John Horn,Nancy Horn | Applicant: Boulder Roofing, Inc | Permit type: Roofing | Permit status: Cmp | Completion date: April 17, 2014 | Current use: Single family d | |||||
SCORE 95 Addition of 22 square feet for a new elevator shaft servicing two levels of the existing home. Elevator and equipment not included in scope. No electrical work included in scope of work for this permit. Client: John Horn,Nancy Horn | Applicant: Satinwood Construction Inc | Permit type: Building | Permit status: Iss | Current use: Single family d | |||||
SCORE 95 Remove existing shingles and re-roof residence with dimensional shingles. 43 squares, roof pitch represented by contractor to be 4:12. Client: John Horn | Permit type: Roofing | Permit status: Cmp | Completion date: April 17, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2014-00985 | |||||
Gas leak repair at the main Date: March 30, 2011 Client: Nancy Horn | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2011-01152 |