Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Revision to permit b1109284 the original scope was to remove the roof above the proposed master bedroom and raise the rear wall by about 3 feet. Then install a new roof ready for a green roof. We decided not to tear off the old roof after we performed the interior demolition. We still needed to increase the strength of the existing roof for the green roof material which we did as per the engineers drawings. We also changed out the existing air conditioner with a new rooftop unit but utilized the existing ductwork. Basically all that was added was the penetration through the roof to connect where the unit in the closet had been and the compressor on the roof changed to an all in one unit. Date: July 17, 2012 Client: Howard Crystal | Applicant: Howard Crystal; Scott Hammar | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1211644 | |||||
Electrical Date: February 21, 2012 Client: Ann R Crystal | Applicant: Eugene S Ahns | Permit status: Completed | Permit id: E1203693 | |||||
2. 5 ton Date: February 21, 2012 Client: Howard M Crystal | Applicant: Kewal K Khatta | Permit type: Mechanical | Permit status: Completed | Permit id: M1201102 | |||||
SCORE 96 Plumbing and gas Date: February 21, 2012 Contractor: Kewal K. Khatta Client: Howard M Crystal | Permit status: Completed | Permit id: P1203310 | |||||
SCORE 96 Electrical Date: February 21, 2012 Contractor: Eugene S Ahns Client: Ann R Crystal | Permit status: Completed | Permit id: E1203693 | |||||
SCORE 96 Electrical Date: January 26, 2016 Contractor: James A. Williams Client: Howard M Crystal | Permit status: Permit issued | Permit id: E1603194 | |||||
SCORE 96 Plumbing and gas Date: February 12, 2016 Contractor: Petros Demetriou Client: Howard M Crystal | Permit status: Completed | Permit id: P1603651 | |||||
SCORE 96 Electrical Date: February 21, 2012 Contractor: Eugene S Ahns Client: Ann R Crystal | Permit status: Completed | Permit id: E1203693 | |||||
SCORE 56 Revision to permit b1109284 the original scope was to remove the roof above the proposed master bedroom and raise the rear wall by about 3 feet. Then install a new roof ready for a green roof. We decided not to tear off the old roof after we performed the interior demolition. We still needed to increase the strength of the existing roof for the green roof material which we did as per the engineers drawings. We also changed out the existing air conditioner with a new rooftop unit but utilized the existing ductwork. Basically all that was added was the penetration through the roof to connect where the unit in the closet had been and the compressor on the roof changed to an all in one unit. Date: July 17, 2012 Contractor: Howard Crystal Scott Hammar Client: Howard Crystal | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1211644 | |||||
SCORE 96 Plumbing and gas Date: February 21, 2012 Contractor: Kewal K. Khatta Client: Howard M Crystal | Permit status: Completed | Permit id: P1203310 | |||||
SCORE 96 Electrical Date: January 26, 2016 Contractor: James A. Williams Client: Howard M Crystal | Permit status: Completed | Permit id: E1603194 | |||||
SCORE 96 Plumbing and gas Date: February 12, 2016 Contractor: Petros Demetriou Client: Howard M Crystal | Permit status: Completed | Permit id: P1603651 | |||||
SCORE 56 Revision to permit b1109284 the original scope was to remove the roof above the proposed master bedroom and raise the rear wall by about 3 feet. Then install a new roof ready for a green roof. We decided not to tear off the old roof after we performed the interior demolition. We still needed to increase the strength of the existing roof for the green roof material which we did as per the engineers drawings. We also changed out the existing air conditioner with a new rooftop unit but utilized the existing ductwork. Basically all that was added was the penetration through the roof to connect where the unit in the closet had been and the compressor on the roof changed to an all in one unit. Date: July 17, 2012 Contractor: Howard Crystal; Scott Hammar Client: Howard Crystal | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1211644 | |||||
SCORE 96 Electrical Date: February 21, 2012 Contractor: Eugene S Ahns Client: Ann R Crystal | Permit status: Completed | Permit id: E1203693 | |||||
SCORE 96 Plumbing and gas Date: February 21, 2012 Contractor: Kewal K. Khatta Client: Howard M Crystal | Permit status: Completed | Permit id: P1203310 | |||||
SCORE 84 2. 5 ton Date: February 21, 2012 Contractor: Kewal K Khatta Client: Howard M Crystal | Permit type: Mechanical | Permit status: Completed | Permit id: M1201102 | |||||
SCORE 67 Remove and replace kitchen cabinets and gas range. Date: November 30, 2015 Contractor: Howard Crystal Client: Howard Crystal | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1602326 | |||||
SCORE 67 Repairing and replacing rotten shutters Date: February 29, 2016 Contractor: Howard Crystal Client: Howard Crystal | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1605161 | |||||
SCORE 82 Install one direct vent insert using csst gas piping. Date: February 12, 2016 Contractor: Elpp Client: Howard Crystal | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1604607 | |||||
SCORE 96 Electrical Date: January 26, 2016 Contractor: James A. Williams Client: Howard M Crystal | Permit status: Completed | Permit id: E1603194 | |||||
SCORE 96 Plumbing and gas Date: February 12, 2016 Contractor: Petros Demetriou Client: Howard M Crystal | Permit status: Completed | Permit id: P1603651 |