Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 96 Electrical Date: November 20, 2015 Contractor: George V Oliver Client: Jamie R Lynch | Permit status: Completed | Permit id: E1601529 | |||||
SCORE 96 Plumbing and gas Date: October 27, 2015 Contractor: Michael R Seasay Client: Jamie R Lynch | Permit status: Completed | Permit id: P1600780 | |||||
SCORE 96 Basement renovation, demolition of non-bearing walls, adding new walls, underpinning the foundation and lowering the slab to get an 8 ft. Ceiling height. Adding a welled exit and exterior door. Remodeling existing bath in basement, updating electrical as needed and mechanical and plumbing. Date: September 10, 2015 Contractor: Michael Clatterbuck Client: Zelaya Properties Llc | Permit type: Addition alteration repair | Permit status: Permit issued | Permit id: B1503107 | |||||
SCORE 96 Revision to building permit b1503107, revise approved front entrance stair from straight stair to a spiral stair. Date: November 18, 2015 Contractor: Michael Clatterbuck Client: Na Zelaya Properties Llc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1601910 | |||||
SCORE 67 Interior demolition of non-bearing elements in a space up to 5,0 square feet (464. 5 square meters) Date: August 18, 2015 Contractor: Jamie Lynch Permit type: Building | Permit status: Permit issued | Permit id: Pc13590107 | |||||
SCORE 96 Electrical Date: November 20, 2015 Contractor: George V Oliver Client: Jamie R Lynch | Permit status: Completed | Permit id: E1601529 | |||||
SCORE 96 Plumbing and gas Date: October 27, 2015 Contractor: Michael R Seasay Client: Jamie R Lynch | Permit status: Completed | Permit id: P1600780 | |||||
SCORE 96 Revise existing first floor framing to allow for replacement of existing basement stair to allow proper head height. Date: January 29, 2016 Contractor: Michael Clatterbuck Client: Jamie R Lynch | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1603890 |