Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Alteration permit Date: March 30, 2015 Client: Hohag Gabriel A Lepori Sara N | Permit status: Active | Permit id: 599172 | |||||
Plumbing permit Date: January 14, 2015 Client: Hohag Gabriel A Lepori Sara N | Permit status: Completed | Permit id: 584632 | |||||
Alteration permit Date: December 19, 2014 Client: Hohag Gabriel A Lepori Sara N | Permit status: Completed | Permit id: 579141 | |||||
Alteration permit Date: March 30, 2015 Client: Hohag Gabriel A Lepori Sara N | Permit status: Active | Permit id: 599172 | |||||
Alteration permit Date: December 19, 2014 Client: Hohag Gabriel A Lepori Sara N | Permit status: Completed | Permit id: 579141 | |||||
Plumbing permit Date: January 14, 2015 Client: Hohag Gabriel A Lepori Sara N | Permit status: Completed | Permit id: 584632 | |||||
Interior alterations to include drywall throughout, moisture resistant drywall in the bathroom and kitchen, new windows and doors in existing opening. Applicant agrees to limit the construction to comply with ez permit standard for interior alterations, dated january 2011. Deviation from the standard will result in revocation of this permit and imposition of further penalties. Separate permits required for plumbing, electrical and mechanical work. Home owner is doing the work. Date: March 30, 2015 Client: Hohag Gabriel A Lepori Sara N | Permit type: Alteration permit | Permit status: Expired | Completion date: June 28, 2017 | Permit id: 599172 | |||||
SCORE 100 Replace kitchen sink drain and replace kitchen sink-the installation will comply with the philadelphia plumbing code 2004 Date: January 14, 2015 Contractor: Robert Metzger Client: Hohag Gabriel A Lepori Sara N | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 30, 2015 | Permit id: 584632 | |||||
SCORE 90 Install 3 star bolts and 4 stabilizers Date: December 19, 2014 Contractor: Ams Development Llc Client: Hohag Gabriel A Lepori Sara N | Permit type: Alteration permit | Permit status: Completed | Completion date: February 3, 2015 | Permit id: 579141 | |||||
SCORE 88 Installation of a 3. 9kw solar system consisting of (13) solarworld 300w modules, (13) p3 optimizers, & (1) se30 solaredge inverter as per 2008 nec. (south dist.) Date: December 6, 2017 Contractor: Solar States Llc Client: Hohag Gabriel A Lepori Sara N | Permit type: Electrical permit | Permit status: Active | Completion date: December 6, 2017 | Permit id: 836671 |