Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 66 Installing (1) complete hvac system, install new trane 95% high efficiency 80,0 btu furnace utilizing pvc intake and exhaust venting system and a new trane 2 ton central air conditioning system including new evaporative coil and condensing unit. System will be installed in basement and rear of house. ![]() ![]() Client: Henner Bridgette P | Permit type: Mechanical permit | Permit status: Active | Completion date: November 28, 2017 | Permit id: 810042 | |||||
SCORE 100 Re-wire one family dwelling as per 2008 nec. ![]() ![]() Client: Henner Bridgette P | Permit type: Electrical permit | Permit status: Active | Completion date: June 7, 2017 | Permit id: 790044 | |||||
SCORE 100 Replace water service curb to house pa20171450573 "self-certifications are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection" ![]() ![]() Client: Henner Bridgette P | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 2, 2017 | Permit id: 786756 | |||||
SCORE 100 New 4" main drain new 3" stack small waste lines new water lines 2 toilets 2 lavs 1 tub 1 shower and 1 ks (sfd)the installation shall comply with the philadelphia plumbing code, 2004 ![]() ![]() Client: Henner Bridgette P | Permit type: Plumbing permit | Permit status: Active | Completion date: November 28, 2017 | Permit id: 782857 | |||||
Ez interior alterations - 925 square feet of interior alterations - single family dwelling - applicant agrees to limit the construction to comply with ez permit standard for interior alterations, dated feb. 2007. Deviations from this standard will result in the revocation of this permit and imposition of further penalties. Owner is performing renovations. Work includes new finishes throughout, kitchen & bathroom alterations, new windows, new doors, flooring, remove plaster walls, gwb as needed as per ez alteration standards. Separate permits required for plumbing, electric and hvac. Call inspector at district office at least 24 hours prior to starting work. Interior renovations of kitchen, bathroom and finishes: additional permits are required for electrical, plumbing ![]() Client: Henner Bridgette P | Permit type: Alteration permit | Permit status: Active | Completion date: November 28, 2017 | Permit id: 771286 |