Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Solar pv roof mount filed in box s et Date: April 7, 2015 Permit type: Electrical only | |||||
Clv sfd rehab per scope of work letter, change out existing ac and ducting for splitsystem per plan,r/r insulation with r-38 cellulose per 2009 eicc perscriptive requirements min.,patch drywall, new water heater plans destroyed 2/21/14 bc Date: September 25, 2012 | |||||
Clv sfd rehab per scope of work letter, change out existing ac and ducting for splitsystem per plan,r r insulation with r-38 cellulose per 2009 eicc perscriptive requirements min.,patch drywall, new water heater plans destroyed 2 21 14 bc Date: September 25, 2012 Permit id: 220503 | |||||
SCORE 96 3d_032_hvac exact change out | |||||
SCORE 95 3d_082_roof mounted photovoltaic system per kw Permit type: Electrical | |||||
SCORE 95 3d_082_roof mounted photovoltaic system per kw Permit type: Electrical | |||||
SCORE 96 3d_032_hvac exact change out |