Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Alteration permit Date: August 9, 2013 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 476657 | |||||
Plumbing permit Date: August 1, 2014 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 547296 | |||||
Administrative permit Date: May 19, 2009 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 216476 | |||||
Electrical permit Date: July 15, 2009 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 221206 | |||||
Administrative permit Date: August 22, 2008 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 168523 | |||||
Administrative permit Date: April 16, 2014 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 528833 | |||||
Alteration permit Date: September 17, 2014 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 558637 | |||||
Electrical permit Date: June 14, 2007 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Expired | Permit id: 70476 | |||||
Administrative permit Date: September 20, 2012 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 427751 | |||||
Alteration permit Date: September 3, 2008 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 174434 | |||||
Electrical permit Date: July 11, 2014 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 548797 | |||||
Suppression permit Date: February 4, 2016 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Active | Permit id: 667768 | |||||
Alteration permit Date: June 12, 2012 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 408759 | |||||
Plumbing permit Date: February 27, 2012 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 389099 | |||||
Administrative permit Date: November 12, 2013 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 498007 | |||||
Administrative permit Date: June 29, 2016 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Active | Permit id: 701587 | |||||
Mechanical permit Date: July 23, 2014 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 549781 | |||||
Use permit Date: March 14, 2008 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 138463 | |||||
Suppression permit Date: September 15, 2008 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 177206 | |||||
Electrical permit Date: June 21, 2016 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 701625 | |||||
Mechanical permit Date: July 14, 2008 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 158382 | |||||
Administrative permit Date: November 20, 2015 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 649497 | |||||
Mechanical permit Date: August 4, 2015 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 629495 | |||||
Plumbing permit Date: January 26, 2007 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 52535 | |||||
Mechanical permit Date: July 17, 2012 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 411215 | |||||
Suppression permit Date: March 23, 2009 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 195516 | |||||
Electrical permit Date: September 19, 2012 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Expired | Permit id: 399435 | |||||
Plumbing permit Date: December 30, 2008 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 193647 | |||||
Electrical permit Date: July 25, 2013 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 479598 | |||||
Administrative permit Date: November 10, 2011 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 361437 | |||||
Demolition permit Date: June 22, 2015 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Active | Permit id: 617307 | |||||
Zoning/use permit Date: November 24, 2014 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 573831 | |||||
Alteration permit Date: November 10, 2010 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 309310 | |||||
Mechanical permit Date: April 2, 2007 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 62351 | |||||
Use permit Date: June 8, 2011 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 346037 | |||||
Electrical permit Date: July 11, 2008 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 159747 | |||||
Sign permit Date: December 13, 2010 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 306777 | |||||
Alteration permit Date: February 24, 2009 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 201122 | |||||
Suppression permit Date: July 14, 2014 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 549182 | |||||
Sign permit Date: November 24, 2014 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 569078 | |||||
Alteration permit Date: April 2, 2007 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 58327 | |||||
Suppression permit Date: June 20, 2013 Permit status: Completed | Permit id: 478759 | |||||
Demolition permit Date: December 23, 2013 Permit status: Completed | Permit id: 512557 | |||||
Administrative permit Date: February 13, 2013 Permit status: Completed | Permit id: 449711 | |||||
Alteration permit Date: May 14, 2013 Permit status: Completed | Permit id: 468513 | |||||
Alteration permit Date: June 16, 2015 Permit status: Completed | Permit id: 614526 | |||||
Mechanical permit Date: April 1, 2014 Permit status: Completed | Permit id: 524302 | |||||
Electrical permit Date: August 21, 2015 Permit status: Completed | Permit id: 625139 | |||||
Mechanical permit Date: March 14, 2012 Client: Geccmc 2003-C1 Complex 80 | Permit status: Completed | Permit id: 391280 | |||||
Alteration permit Date: February 15, 2012 Client: Geccmc 2003-C1 Complex 80 | Permit status: Completed | Permit id: 386662 | |||||
Electrical permit Date: May 17, 2012 Client: Geccmc 2003-C1 Complex 80 | Permit status: Completed | Permit id: 399217 | |||||
Alteration permit Date: May 14, 2014 Permit status: Completed | Permit id: 530478 | |||||
Demolition permit Date: April 21, 2014 Permit status: Completed | Permit id: 530476 | |||||
Administrative permit Date: March 23, 2015 Permit status: Completed | Permit id: 591512 | |||||
Mechanical permit Date: October 1, 2014 Permit status: Completed | Permit id: 544713 | |||||
Plumbing permit Date: June 23, 2014 Permit status: Completed | Permit id: 544686 | |||||
Use permit Date: May 1, 2014 Permit status: Completed | Permit id: 533820 | |||||
Administrative permit Date: August 6, 2014 Permit status: Completed | Permit id: 553744 | |||||
Alteration permit Date: June 2, 2016 Permit status: Active | Permit id: 647870 | |||||
Electrical permit Date: August 4, 2016 Permit status: Active | Permit id: 704317 | |||||
Administrative permit Date: March 31, 2016 Permit status: Completed | Permit id: 677958 | |||||
Electrical permit Date: July 25, 2014 Permit status: Completed | Permit id: 545601 | |||||
Suppression permit Date: June 30, 2015 Permit status: Completed | Permit id: 621450 | |||||
Suppression permit Date: October 7, 2008 Permit status: Expired | Permit id: 181547 | |||||
Suppression permit Date: March 20, 2012 Permit status: Completed | Permit id: 388486 | |||||
Suppression permit Date: May 7, 2014 Permit status: Completed | Permit id: 535139 | |||||
Fast form building permit Date: April 27, 2007 Permit status: Completed | Permit id: 71874` | |||||
Alteration permit Date: January 31, 2012 Permit status: Completed | Permit id: 384608 | |||||
Alteration permit Date: September 23, 2008 Permit status: Completed | Permit id: 177140 | |||||
Administrative permit Date: March 1, 2012 Permit status: Completed | Permit id: 388983 | |||||
Alteration permit Date: September 4, 2014 Permit status: Expired | Permit id: 559578 | |||||
Alteration permit Date: April 2, 2015 Permit status: Completed | Permit id: 586662 | |||||
Alteration permit Date: August 19, 2014 Permit status: Completed | Permit id: 554623 | |||||
Suppression permit Date: February 28, 2014 Permit status: Completed | Permit id: 521519 | |||||
Zoning/use permit Date: October 8, 2014 Permit status: Completed | Permit id: 527452 | |||||
On 10/06/15, the department of licenses and inspections issued a notice of refusal for application #643036. Date: October 15, 2015 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Applicant: Preit Rubin Inc | Permit type: Appeal | Permit status: Approved | Completion date: December 9, 2015 | Permit id: 26227 | |||||
Special exception/ permit for the legalization for the erection of a deck on existing eleventh (11th) floor of an existing fourteen (14) story structure (max building ht 203 ft high) (deck is within the property line) (145 high above the grade) in the same building business and professional offices from 4th floors to 6th floors in an existing structure as part of an existing retail and commercial complex with all other uses including with signage as previously approved. Date: June 10, 2014 Applicant: Doris Leisch | Permit type: Appeal | Permit status: Granted | Completion date: September 30, 2014 | Permit id: 23037 | |||||
On 8/14/15, the department of licenses and inspections issued a notice of refusal for application #623731. Date: September 11, 2015 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Applicant: Christopher Mrozinski | Permit type: Appeal | Permit status: Approved | Completion date: October 29, 2015 | Permit id: 26056 | |||||
Permit for the erection of a marquee projecting 47" from property line with a 116" x 1 2" sign attached above parallel to the building face (lights focused on sign) accessory to a newspaper publishing company on the first and third floors (breeched into 833 market st. In the same building offices on floors 4-6 in an existing structure as part of a retail and commercial complex with uses as previously approved. (fast track) Date: June 20, 2012 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Applicant: Neil Sklaroff, Esquire | Permit type: Appeal | Permit status: Withdrawn | Permit id: 18302 | |||||
On 5/12/14 department of licenses and inspections issued notice of refusal for application #532714. Date: May 13, 2014 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Applicant: Blt Architects | Permit type: Appeal | Permit status: Approved | Permit id: 22815 | |||||
On 12/19/2011, the department of licenses and inspections issued a notice of refusal for application #378175. Date: December 19, 2011 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Applicant: Blt Architects | Permit type: Appeal | Permit status: Approved | Completion date: January 12, 2012 | Permit id: 16883 | |||||
Lanconnect applied for and paid the initial processing fee for permit #399988 on 4/18/12. We received a letter stating the permit was approved and that we needed to come down and pay the remainder of the balance. Since we thought we had obtained the rough in permit, we started roughing in the cable for this project. Date: June 19, 2012 Client: Geccmc 2003-C1 Complex 80 | Applicant: Lanconnect, Inc. | Permit type: Appeal | Permit status: Moot | Permit id: 18294 | |||||
Electrical permit Date: December 2, 2014 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Expired | Permit id: 577159 | |||||
Mechanical permit Date: June 13, 2014 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Expired | Permit id: 536169 | |||||
Suppression permit Date: February 4, 2016 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Active | Permit id: 667747 | |||||
Alteration permit Date: June 12, 2012 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 408759 | |||||
Suppression permit Date: July 14, 2014 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 549182 | |||||
Plumbing permit Date: April 2, 2014 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 528028 | |||||
Alteration permit Date: August 9, 2013 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 476657 | |||||
Electrical permit Date: September 7, 2007 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Expired | Permit id: 85896 | |||||
Administrative permit Date: August 22, 2008 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 168523 | |||||
Administrative permit Date: September 20, 2012 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 427751 | |||||
Mechanical permit Date: October 8, 2008 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 181805 | |||||
Electrical permit Date: February 1, 2012 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 386029 | |||||
Alteration permit Date: February 29, 2008 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 133310 | |||||
Electrical permit Date: June 21, 2016 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 701625 | |||||
Suppression permit Date: October 28, 2008 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 185217 | |||||
Suppression permit Date: April 9, 2009 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 208658 | |||||
Mechanical permit Date: July 17, 2012 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 411215 | |||||
Electrical permit Date: July 11, 2008 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 159747 | |||||
Administrative permit Date: September 11, 2015 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 632958 | |||||
Administrative permit Date: April 9, 2009 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 209834 | |||||
Plumbing permit Date: October 7, 2008 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 181627 | |||||
Electrical permit Date: January 30, 2009 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 196456 | |||||
Alteration permit Date: November 10, 2010 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 309310 | |||||
Alteration permit Date: February 24, 2009 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 201122 | |||||
Alteration permit Date: June 13, 2014 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 533148 | |||||
Plumbing permit Date: November 30, 2007 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 118911 | |||||
Administrative permit Date: September 17, 2014 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 562356 | |||||
Plumbing permit Date: January 11, 2017 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Active | Permit id: 748474 | |||||
Use permit Date: December 12, 2011 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 378207 | |||||
Administrative permit Date: November 10, 2011 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 361437 | |||||
Mechanical permit Date: April 2, 2007 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 62351 | |||||
Administrative permit Date: November 12, 2013 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 498007 | |||||
Plumbing permit Date: February 27, 2012 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 389099 | |||||
Sign permit Date: November 24, 2014 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 569078 | |||||
Electrical permit Date: July 25, 2013 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 479598 | |||||
Use permit Date: March 14, 2008 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 138463 | |||||
Alteration permit Date: April 2, 2007 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 58327 | |||||
Zoning use permit Date: November 24, 2014 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 573831 | |||||
Mechanical permit Date: August 4, 2015 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 629495 | |||||
Sign permit Date: December 13, 2010 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 306777 | |||||
Administrative permit Date: June 29, 2016 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Completed | Permit id: 701587 | |||||
Demolition permit Date: June 22, 2015 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Permit status: Active | Permit id: 617307 | |||||
Alteration permit Date: January 31, 2012 Permit status: Completed | Permit id: 384608 | |||||
Electrical permit Date: November 9, 2016 Permit status: Active | Permit id: 735362 | |||||
Suppression permit Date: May 7, 2014 Permit status: Completed | Permit id: 535139 | |||||
Suppression permit Date: December 20, 2016 Permit status: Active | Permit id: 744890 | |||||
Suppression permit Date: June 30, 2015 Permit status: Completed | Permit id: 621450 | |||||
Suppression permit Date: March 20, 2012 Permit status: Completed | Permit id: 388486 | |||||
Administrative permit Date: March 1, 2012 Permit status: Completed | Permit id: 388983 | |||||
Alteration permit Date: September 23, 2008 Permit status: Completed | Permit id: 177140 | |||||
Fast form building permit Date: April 27, 2007 Permit status: Completed | Permit id: 71874` | |||||
Suppression permit Date: October 7, 2008 Permit status: Expired | Permit id: 181547 | |||||
Alteration permit Date: September 4, 2014 Permit status: Expired | Permit id: 559578 | |||||
Alteration permit Date: May 14, 2013 Permit status: Completed | Permit id: 468513 | |||||
Administrative permit Date: February 13, 2013 Permit status: Completed | Permit id: 449711 | |||||
Suppression permit Date: June 20, 2013 Permit status: Completed | Permit id: 478759 | |||||
Demolition permit Date: December 23, 2013 Permit status: Completed | Permit id: 512557 | |||||
Electrical permit Date: August 21, 2015 Permit status: Completed | Permit id: 625139 | |||||
Alteration permit Date: June 16, 2015 Permit status: Completed | Permit id: 614526 | |||||
Mechanical permit Date: April 1, 2014 Permit status: Completed | Permit id: 524302 | |||||
Suppression permit Date: February 28, 2014 Permit status: Completed | Permit id: 521519 | |||||
Alteration permit Date: April 2, 2015 Permit status: Completed | Permit id: 586662 | |||||
Zoning use permit Date: October 8, 2014 Permit status: Completed | Permit id: 527452 | |||||
Alteration permit Date: August 19, 2014 Permit status: Completed | Permit id: 554623 | |||||
Alteration permit Date: June 2, 2016 Permit status: Active | Permit id: 647870 | |||||
Administrative permit Date: July 15, 2014 Permit status: Completed | Permit id: 541417 | |||||
Mechanical permit Date: October 1, 2014 Permit status: Completed | Permit id: 544713 | |||||
Use permit Date: May 1, 2014 Permit status: Completed | Permit id: 533820 | |||||
Electrical permit Date: August 4, 2016 Permit status: Active | Permit id: 704317 | |||||
Electrical permit Date: July 25, 2014 Permit status: Completed | Permit id: 545601 | |||||
Alteration permit Date: May 14, 2014 Permit status: Completed | Permit id: 530478 | |||||
Administrative permit Date: March 23, 2015 Permit status: Completed | Permit id: 591512 | |||||
Plumbing permit Date: June 23, 2014 Permit status: Completed | Permit id: 544686 | |||||
Administrative permit Date: March 31, 2016 Permit status: Completed | Permit id: 677958 | |||||
Demolition permit Date: April 21, 2014 Permit status: Completed | Permit id: 530476 | |||||
Alteration permit Date: March 29, 2012 Client: Geccmc 2003-C1 Complex 80 | Permit status: Completed | Permit id: 393504 | |||||
Mechanical permit Date: March 29, 2012 Client: Geccmc 2003-C1 Complex 80 | Permit status: Completed | Permit id: 394866 | |||||
Electrical permit Date: June 14, 2012 Client: Geccmc 2003-C1 Complex 80 | Permit status: Expired | Permit id: 409336 | |||||
Alteration permit Date: December 30, 2016 Client: Geccmc 2003-C1 Complex 80 | Permit status: Active | Permit id: 740229 | |||||
Mechanical permit Date: January 17, 2017 Client: Geccmc 2003-C1 Complex 80 | Permit status: Active | Permit id: 748574 | |||||
Zoning permit Date: October 21, 2016 Client: City Of Phila Dept Of Public Prop | Permit status: Completed | Permit id: 730160 | |||||
On 8 14 15, the department of licenses and inspections issued a notice of refusal for application #623731. Date: September 11, 2015 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Applicant: Christopher Mrozinski | Permit type: Appeal | Permit status: Approved | Completion date: October 29, 2015 | Permit id: 26056 | |||||
Special exception permit for the legalization for the erection of a deck on existing eleventh (11th) floor of an existing fourteen (14) story structure (max building ht 203 ft high) (deck is within the property line) (145 high above the grade) in the same building business and professional offices from 4th floors to 6th floors in an existing structure as part of an existing retail and commercial complex with all other uses including with signage as previously approved. Date: June 10, 2014 Applicant: Doris Leisch | Permit type: Appeal | Permit status: Granted | Completion date: September 30, 2014 | Permit id: 23037 | |||||
On 10 06 15, the department of licenses and inspections issued a notice of refusal for application #643036. Date: October 15, 2015 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Applicant: Preit Rubin Inc | Permit type: Appeal | Permit status: Approved | Completion date: December 9, 2015 | Permit id: 26227 | |||||
Permit for the erection of a marquee projecting 47" from property line with a 116" x 1 2" sign attached above parallel to the building face (lights focused on sign) accessory to a newspaper publishing company on the first and third floors (breeched into 833 market st. In the same building offices on floors 4-6 in an existing structure as part of a retail and commercial complex with uses as previously approved. (fast track) Date: June 20, 2012 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Applicant: Neil Sklaroff, Esquire | Permit type: Appeal | Permit status: Withdrawn | Permit id: 18302 | |||||
On 5 12 14 department of licenses and inspections issued notice of refusal for application #532714. Date: May 13, 2014 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Applicant: Blt Architects | Permit type: Appeal | Permit status: Approved | Permit id: 22815 | |||||
On 12 19 2011, the department of licenses and inspections issued a notice of refusal for application #378175. Date: December 19, 2011 Client: Preit Rubin Inc | Client Company: Attn Christopher Mrozinski | Applicant: Blt Architects | Permit type: Appeal | Permit status: Approved | Completion date: January 12, 2012 | Permit id: 16883 | |||||
Lanconnect applied for and paid the initial processing fee for permit #399988 on 4 18 12. We received a letter stating the permit was approved and that we needed to come down and pay the remainder of the balance. Since we thought we had obtained the rough in permit, we started roughing in the cable for this project. Date: June 19, 2012 Client: Geccmc 2003-C1 Complex 80 | Applicant: Lanconnect, Inc. | Permit type: Appeal | Permit status: Moot | Permit id: 18294 | |||||
SCORE 100 New fit out of a existing space including lighting, power, 8 amp service,tele data, security and controls for hvac equipment per 2008 nec (retail)install fire alarm system per nfpa 72 Date: June 26, 2017 Contractor: H B Frazer Co Penna Permit type: Electrical permit | Permit status: Completed | Completion date: September 14, 2017 | Permit id: 753198 | |||||
SCORE 80 Repair structural beam, including partial removal of concrete encasement, surface prep of existing corroded steel and welding of steel plates to bottom flange, anti-corrosion treatment, and re-encasement in concrete. Date: September 26, 2017 Contractor: Shoemakerskanska Jt Venture Permit type: Alteration permit | Permit status: Active | Completion date: November 7, 2017 | Permit id: 816506 | |||||
Legal occupancy sign - 6th floor conference room - commonwealth of pennsylvania offfices note: two 36" minimum exit doors for this room Date: November 10, 2011 Client: Prett Rubin Inc | Permit type: Administrative permit | Permit status: Completed | Completion date: November 17, 2011 | Permit id: 361437 | |||||
SCORE 87 Install 33 horn strobes, 3 pull stations & 1 control modual. Date: September 7, 2007 Contractor: Firesinger Russell Client: Prett Rubin Inc | Permit type: Electrical permit | Permit status: Expired | Completion date: September 7, 2007 | Permit id: 85896 | |||||
SCORE 100 Relocate of 283 existing fire sprinkler heads on 8th & 9th flrs. Date: September 26, 2017 Contractor: A And S Sprinkler Co Inc Client: Prett Rubin Inc | Permit type: Suppression permit | Permit status: Active | Completion date: November 7, 2017 | Permit id: 819300 | |||||
SCORE 100 Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: June 19, 2017 Contractor: Independence Fire Sprinkler Co Client: Prett Rubin Inc | Permit type: Suppression permit | Permit status: Completed | Completion date: August 22, 2017 | Permit id: 793009 | |||||
SCORE 100 For the installation of a fire suppresion system as per approved plans and nfpa 13 - 2007 from 801 through 833 market st. Separate permit required for any electrical or plumbing work. Date: April 7, 2017 Contractor: Simplexgrinnell Client: Prett Rubin Inc | Permit type: Suppression permit | Permit status: Completed | Completion date: September 14, 2017 | Permit id: 768182 | |||||
SCORE 100 Install 2- kitchen sinks with 2- tankless point of use water heaters Date: January 11, 2017 Contractor: Lormar Mechanical Services Client: Prett Rubin Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 24, 2017 | Permit id: 748474 | |||||
SCORE 83 Provide one 75kw portable generator for event on 12 10 16 & 12 11 16 generator will be located on filbert st - transported by electrical contractor as per 2005 nec (cc district)must be inspected by 3rd party agency Date: December 8, 2016 Contractor: Michael Mcclelland Client: Prett Rubin Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: March 14, 2017 | Permit id: 742062 | |||||
Tco only for special event permit on november 19, november 26, december 3 and december 17, (10am-5pm), (four days total) as per code bulletin for variance of general application for short-term events. Fire watch shall be provided as per code bulletin. Date: November 21, 2016 Client: Prett Rubin Inc | Permit type: Administrative permit | Permit status: Completed | Completion date: November 23, 2016 | Permit id: 734677 | |||||
SCORE 100 Core and shell upgrades,new branch wiring,lighting and devices and additions to existing fire alarm per 2008 nec & nfpa 72 (office bldg) Date: July 31, 2014 Contractor: Armour And Sons Electric Inc Client: Prett Rubin Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: November 17, 2014 | Permit id: 540140 | |||||
SCORE 100 Asbestos removal abatement required prior to the commencement of any work. For level ii alterations on the 11th floor of an existing building, alterations to include the erection of non-load bearing partitions for a business occupancy; and for the change of occupancy from business to assembly as shown per approved plans. No exterior work roof deck approved. Building is fully sprinklered. Separate permits required for mechanical, electrical, plumbing and fire suppression. All work to be done per approved plans. Date: March 21, 2014 Contractor: Sullivan Company The Client: Prett Rubin Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: August 1, 2014 | Permit id: 519837 | |||||
Tco only for special event permit on november 16, 23, (10am-5pm), december 7, 14, 21 (10am-5pm) and december (12pm-7pm) (7 total days) as per attached code bulletin for variance of general application for short-term events. Fire watch shall be provided as per code bulletin. Date: November 12, 2013 Client: Prett Rubin Inc | Permit type: Administrative permit | Permit status: Completed | Completion date: November 14, 2013 | Permit id: 498007 | |||||
SCORE 100 Erection of sidewalk shelter platform. Separate streets dept street closure permit required. Date: July 9, 2013 Contractor: Superior Scaffold Services Inc Client: Prett Rubin Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: November 1, 2013 | Permit id: 480106 | |||||
SCORE 100 Install fa & add 9 emon meters, exit,68 fl rec, furniture feeds, heat pumps,1 duplex rec,security power, motion sensors,relocate furniture feeds & datedon 7th fl demo as required inst 2 cat 6 cables on 11 per 2008 per 2008 nec & nfpa 72(office space) Date: April 17, 2014 Contractor: Shoreline Electric Inc Client: Prett Rubin Inc | Permit type: Electrical permit | Permit status: Expired | Completion date: April 17, 2014 | Permit id: 525899 | |||||
SCORE 100 (o) meter reduction Date: January 26, 2007 Contractor: Herman Goldner Co Inc Client: Prett Rubin Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 20, 2007 | Permit id: 52535 | |||||
Install new hvac system as part of tenant fit out. See ap #533148 for fit-out. Date: June 13, 2014 Client: Prett Rubin Inc | Permit type: Mechanical permit | Permit status: Expired | Completion date: May 1, 2015 | Permit id: 536169 | |||||
Interior alteration for new retail department store Date: June 13, 2014 Client: Prett Rubin Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: October 18, 2014 | Permit id: 533148 | |||||
Tco only for special event permit on april 19, 26; may 3, 10, 17, 24, 31; june 7, 14, 21, 28 and july 5 (10am-5pm) (12 total days) as per code bulletin for variance of general application for short-term events. Fire watch shall be provided as per code bulletin. Date: April 16, 2014 Client: Prett Rubin Inc | Permit type: Administrative permit | Permit status: Completed | Completion date: April 17, 2014 | Permit id: 528833 | |||||
SCORE 100 Install 1 new sink for coffee station and replace 1 sink on the 11th floor (office space) Date: April 2, 2014 Contractor: E J Raith Mechanical Inc Client: Prett Rubin Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 1, 2014 | Permit id: 528028 | |||||
SCORE 99 For west facade maintenance masonry repairs per plans and attached masonry proposal. Phc staff to review masonry sample on site for approval. Date: June 12, 2014 Contractor: Shoemaker Construction Co Client: Prett Rubin Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: July 1, 2015 | Permit id: 539990 | |||||
SCORE 100 Install wirng for 8 cameras,11 doors,relocate wiring for 1 door on 7th floor and mount security panels per 2008 nec (office bldg) Date: May 21, 2014 Contractor: Shoreline Electric Inc Client: Prett Rubin Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: April 23, 2015 | Permit id: 538005 | |||||
Philadelphia historical commission registered property. Two bronze plaques to be installed at the 8th street entrance to 801 market, one on each side of the entrance. White lettering to be applied to the existing glass transon above the 8th street entrance to 801 market as approved by the phc. Date: November 24, 2014 Client: Prett Rubin Inc | Permit type: Sign permit | Permit status: Completed | Completion date: December 24, 2014 | Permit id: 569078 | |||||
Signage. 2 wall signs Date: November 24, 2014 Client: Prett Rubin Inc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: September 29, 2017 | Permit id: 573831 | |||||
Tco - for special event: 1st floor of building: year 2014: november 15, 22, 29; december 6, 13, 20: hours (10am to 5pm) compliance with historical commission reqts. Event to be in accordance with code bulletin for short term events: includes fire watch reqt. Compliance with 2013 phila fire code reqd. Date: November 5, 2014 Client: Prett Rubin Inc | Permit type: Administrative permit | Permit status: Completed | Completion date: November 12, 2014 | Permit id: 565230 | |||||
Temporary co for a p #533148 for 2nd floor and part of 1st - century 21 department store Date: September 17, 2014 Client: Prett Rubin Inc | Permit type: Administrative permit | Permit status: Completed | Completion date: January 8, 2015 | Permit id: 562356 | |||||
SCORE 100 Install mechanicals, ductwork, registers diffusers, piping to serve tenant space. All work to be interior only and in accordance with all historical commission requirements. Date: October 14, 2014 Contractor: Elliott Lewis Corporation Client: Prett Rubin Inc | Permit type: Mechanical permit | Permit status: Completed | Completion date: March 11, 2015 | Permit id: 560366 | |||||
SCORE 56 For prescriptive level i alterations at exist. Pedestrian walkway to include installation of new suspended ceiling system, erection of half height walls at exist. Spandrel, & installation of new finish materials; work area is fully sprinklered. No change in height or area of exist. Openings or fire protection rated opening protectives. Separate permit required for mechanical, electrical, & fire suppression work. Date: September 17, 2014 Contractor: Coastal Gen Contracting Inc Client: Prett Rubin Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: April 21, 2015 | Permit id: 558637 | |||||
SCORE 100 Furnish and install new initiating and indicating devices for tenant fit out all new wiring to existing fire alarm control panel as per nfpa72 nec (cc district) Date: September 3, 2014 Contractor: Goldsmith Associates Inc Client: Prett Rubin Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: December 9, 2014 | Permit id: 552528 | |||||
SCORE 100 Install low voltage wiring for the following security devices, 29 motion sensors, 32 door contacts, 2 door release contacts, 1 safe contact, 3 hold up stations and 3 command centers as per 2008 nec (cc district) Date: July 25, 2014 Contractor: Metro Electric Co Inc Client: Prett Rubin Inc | Permit type: Electrical permit | Permit status: Expired | Completion date: June 8, 2015 | Permit id: 551865 | |||||
SCORE 100 Install security wiring for 4-fire tower doors, install maglocks, exit sw & motion sensors for 2-doors, maglock, motion sw & panic hardware, 1 v to pnl & f a module to release per 2008 nec (office bldg) Date: July 15, 2014 Contractor: Shoreline Electric Inc Client: Prett Rubin Inc | Permit type: Electrical permit | Permit status: Expired | Completion date: July 15, 2014 | Permit id: 549387 | |||||
SCORE 100 Relocate sprinkler heads Date: July 14, 2014 Contractor: Majek Fire Protection, Inc Client: Prett Rubin Inc | Permit type: Suppression permit | Permit status: Completed | Completion date: April 21, 2015 | Permit id: 549182 | |||||
SCORE 100 Install 185 cat6 cables, 2 6 strand fiber single mode fiber cables & 3 12 strand fiber cables. Installation to comply with articles 300. 21, 300. 22. 725 & 8 of the 2008 nec. Date: July 11, 2014 Contractor: William Torchiana Iii Client: Prett Rubin Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: January 8, 2015 | Permit id: 548797 | |||||
SCORE 100 Provide new fixtures sanitary and water piping for new layout connect to existing stacks and water main no exterior modifications (commercial) Date: August 1, 2014 Contractor: Lima Company Client: Prett Rubin Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 10, 2015 | Permit id: 547296 | |||||
SCORE 100 Install cctv and eas security system as per nec 2008 (cc district) Date: July 18, 2014 Contractor: Liberty Integrated Solutions Client: Prett Rubin Inc | Permit type: Electrical permit | Permit status: Expired | Completion date: July 18, 2014 | Permit id: 550234 | |||||
SCORE 99 Installation of new hvac system, as per plans and specifications Date: July 23, 2014 Contractor: Hunter Mechanical Inc Client: Prett Rubin Inc | Permit type: Mechanical permit | Permit status: Completed | Completion date: April 21, 2015 | Permit id: 549781 | |||||
SCORE 100 For level ii alterations to an existing buisness occupancy on the seventh floor level of an existing building. Alterations to include the demolition erection of non bearing partition walls, apppliances and finsihes in certain areas. All work to be done per approved plans. Separate permits required for mechanical, electrical and fire supression work. Date: August 14, 2014 Contractor: Sullivan Company The Client: Prett Rubin Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: March 11, 2015 | Permit id: 553998 | |||||
SCORE 83 Provide and install one 42kw 120 2 volt single phase mobile generator for portable restroom trailer (office bldg)cc district Date: October 25, 2016 Contractor: Michael Mcclelland Client: Prett Rubin Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: November 7, 2016 | Permit id: 731544 | |||||
SCORE 100 For the relocation of a standpipe system in the basement and concourse of an existing structure, and for the relocation of fifty-eight (58) sprinkler heads. All work to be perfromed in accordance with nfpa 13 & 14 standards. Date: October 13, 2016 Contractor: Simplexgrinnell Client: Prett Rubin Inc | Permit type: Suppression permit | Permit status: Active | Completion date: August 28, 2017 | Permit id: 719492 | |||||
SCORE 79 Installing new ks, drinking f, 1 indirect waste with trap primer Date: April 24, 2007 Contractor: Kacprowicz Kenneth Client: Prett Rubin Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 20, 2007 | Permit id: 71036 | |||||
SCORE 87 Landlord fit out of 170 sq 373 light fixtures, 15 heat pumps, 1 duct heater, 2 recetps, 81 switches, 4 panels, 2 sub meters (center city district) Date: June 14, 2007 Contractor: Firesinger Russell Client: Prett Rubin Inc | Permit type: Electrical permit | Permit status: Expired | Completion date: June 14, 2007 | Permit id: 70476 | |||||
SCORE 83 Provide 3 - 300kw generators 3 phase, 120 208volt each for temporary power for dnc event from 7 25 to 7 29 2016 generators will be located on filbert between 8th & 9th streets transported by electrical contractor as per 2005 nec (cc district)must be inspected by 3rd party agency Date: June 21, 2016 Contractor: Michael Mcclelland Client: Prett Rubin Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: August 22, 2016 | Permit id: 701625 | |||||
SCORE 100 Amend permit #6667 to correct address Date: June 29, 2016 Contractor: Simplexgrinnell Client: Prett Rubin Inc | Permit type: Administrative permit | Permit status: Completed | Completion date: January 27, 2017 | Permit id: 701587 | |||||
SCORE 100 Relocate (114) existing sprinkler heads. No work alterations to windows or doors. No changes to exterior. Date: February 4, 2016 Contractor: Simplexgrinnell Client: Prett Rubin Inc | Permit type: Suppression permit | Permit status: Active | Completion date: October 18, 2017 | Permit id: 667768 | |||||
SCORE 100 Relocate (159) existing sprinkler heads. No work alterations to windows and doors. No changes to exterior. Date: February 4, 2016 Contractor: Simplexgrinnell Client: Prett Rubin Inc | Permit type: Suppression permit | Permit status: Active | Completion date: October 18, 2017 | Permit id: 667761 | |||||
SCORE 100 Relocate (830) existing sprinkler heads. No work alterations to windows or doors. No changes to exterior. Date: February 4, 2016 Contractor: Simplexgrinnell Client: Prett Rubin Inc | Permit type: Suppression permit | Permit status: Active | Completion date: October 18, 2017 | Permit id: 667747 | |||||
Preliminary plan review to classify construction type of the existing 16-story building. Date: September 11, 2015 Client: Prett Rubin Inc | Permit type: Administrative permit | Permit status: Completed | Completion date: October 28, 2015 | Permit id: 632958 | |||||
Tco only for special event permit on november 21 & 28 (10am-5pm), december 5, 12 & 19 (10am-5pm) (5 total days) as per attached code bulletin for variance of general application for short-term events. Fire watch shall be provided as per code bulletin. Date: November 20, 2015 Client: Prett Rubin Inc | Permit type: Administrative permit | Permit status: Completed | Completion date: November 25, 2015 | Permit id: 649497 | |||||
SCORE 100 Relocate 2 grills and flexduct work-ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers grilles diffusers, and warm-air appliances as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: August 4, 2015 Contractor: Elliott Lewis Corporation Client: Prett Rubin Inc | Permit type: Mechanical permit | Permit status: Completed | Completion date: September 23, 2015 | Permit id: 629495 | |||||
SCORE 62 Hvac - ductwork Date: April 2, 2007 Contractor: Oliver Construction Inc Client: Prett Rubin Inc | Permit type: Mechanical permit | Permit status: Completed | Completion date: July 30, 2007 | Permit id: 62351 | |||||
Selective interior demolition per ez permit standards of common corridor ceilings, existing escalators and specific mechanical and electrical systems Date: June 22, 2015 Client: Prett Rubin Inc | Permit type: Demolition permit | Permit status: Completed | Completion date: June 17, 2017 | Permit id: 617307 | |||||
SCORE 62 Tenant fit-out alterations Date: April 2, 2007 Contractor: Oliver Construction Inc Client: Prett Rubin Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: November 5, 2009 | Permit id: 58327 | |||||
SCORE 100 Install wiring and door access system for 2 lobby doors. Card reader,mag lock,exit switches,door contact,motion sensor. Install wire for conference rm door with card reader,electric strike and door sws per 2008 nec (office space) Date: December 2, 2014 Contractor: Shoreline Electric Inc Client: Prett Rubin Inc | Permit type: Electrical permit | Permit status: Expired | Completion date: December 2, 2014 | Permit id: 577159 | |||||
SCORE 99 Tco for special event on 9 23 12 between 12 pm and 6 pm as per attached bbs variance #b-0923-05 Date: September 20, 2012 Contractor: Shoemaker Construction Co Client: Prett Rubin Inc | Permit type: Administrative permit | Permit status: Completed | Completion date: October 1, 2012 | Permit id: 427751 | |||||
SCORE 99 This permit is for a co for 801-823 market 1st floor lobby based on permit ap #404593. Date: July 25, 2012 Contractor: Shoemaker Construction Co Client: Prett Rubin Inc | Permit type: Administrative permit | Permit status: Completed | Completion date: July 27, 2012 | Permit id: 418437 | |||||
SCORE 99 This permit is for a certificate of occupancy for work completed 6 28 2012 based on permit #393504. (pedestrian bridge to garage at 3rd floor.) Date: June 29, 2012 Contractor: Shoemaker Construction Co Client: Prett Rubin Inc | Permit type: Administrative permit | Permit status: Completed | Completion date: June 29, 2012 | Permit id: 413944 | |||||
SCORE 99 This permit is for a c. O. For work that was completed on 06 19 2012 for 3rd floor publishing office, based on permits #385613,38662 & 389864. Date: June 21, 2012 Contractor: Shoemaker Construction Co Client: Prett Rubin Inc | Permit type: Administrative permit | Permit status: Completed | Completion date: June 21, 2012 | Permit id: 412485 | |||||
SCORE 100 Installation of two crac unit piping per plans. Date: July 17, 2012 Contractor: City Mechanical Inc Client: Prett Rubin Inc | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 10, 2014 | Permit id: 411215 | |||||
SCORE 99 Facade repairs Date: June 12, 2012 Contractor: Shoemaker Construction Co Client: Prett Rubin Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: June 10, 2014 | Permit id: 408759 | |||||
SCORE 100 Install 12 cat6 plenum cables @ an average of 175, all cabling will be installed in j-hooks, all penetrations will be fire stopped as per 2008 nec (cc dist) office bldg Date: June 6, 2012 Contractor: Lanconnect Inc Client: Prett Rubin Inc | Permit type: Electrical permit | Permit status: Expired | Completion date: June 6, 2012 | Permit id: 399988 | |||||
SCORE 100 Furnish and install fire alarm system for the base buiulding of this project - furnish and install all wiring in type mc cable - as per rawings - per 2008 nec and nfpa 72 Date: September 19, 2012 Contractor: Fjm Electrical Construction Client: Prett Rubin Inc | Permit type: Electrical permit | Permit status: Expired | Completion date: September 19, 2012 | Permit id: 399435 | |||||
SCORE 100 Lavs, 3 urinals, 36 wc, 8 fd, 4 hwh, 4 mr, 5 ewc(commercial) Date: February 27, 2012 Contractor: City Mechanical Inc Client: Prett Rubin Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 28, 2015 | Permit id: 389099 | |||||
Hvac. See ap#385613 for plans Date: February 8, 2012 Client: Prett Rubin Inc | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 13, 2012 | Permit id: 386779 | |||||
SCORE 100 Office-removal of existing floor boxes in raidsed floor tiles addition of eight new exit signs add 2 switches in existing lighting circuit add 6 gen purpose recepts as per 2008 nec (cc district) Date: February 1, 2012 Contractor: H B Frazer Co Penna Client: Prett Rubin Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: June 28, 2012 | Permit id: 386029 | |||||
Alterations to partial 3rd floor. Separate permits required for sectors a,c, and d. Separate co required. Separate electrical, plumbing, and fire suppression permits required. Date: February 8, 2012 Client: Prett Rubin Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: June 22, 2012 | Permit id: 385613 | |||||
Offices and meeting space for a newspaper publising company on the first and third floor (breached into 833 market st.) within an existing structure as part of an existing retail and commercial complex with uses as previously approved. Date: December 12, 2011 Client: Prett Rubin Inc | Permit type: Use permit | Permit status: Completed | Completion date: July 18, 2012 | Permit id: 378207 | |||||
Interior alterations, including ground floor fit-out,elevator construction, toilet room construction and breaches in party wall between 801 market street and 833 market street. See bbs case no. 16883. Separate permit required for tenant fit-out and certificate of occupancy. Separate permits required for mechanical, electrical, plumbing, and fire suppression. Date: January 19, 2012 Client: Prett Rubin Inc | Permit type: Alteration permit | Permit status: Abandoned | Completion date: April 3, 2012 | Permit id: 380468 | |||||
SCORE 99 Amending permit # 396394 to reflect non-rated partition between lobby and adjacent tenant space, new exterior doors, and interior, structural supports for future marquee and sign on market street facade. Separate permit required for the installation of marquee and sign. Date: June 4, 2012 Contractor: Shoemaker Construction Co Client: Prett Rubin Inc | Permit type: Administrative permit | Permit status: Completed | Completion date: July 27, 2012 | Permit id: 404593 | |||||
SCORE 100 Install 72 new 2x4 lay in fixtures in existing core & shell use of existing circuits per 2008 nec (commercial) Date: July 25, 2013 Contractor: Armour And Sons Electric Inc Client: Prett Rubin Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: May 1, 2014 | Permit id: 479598 | |||||
SCORE 99 East facade maintenance masonry repairs. Date: August 9, 2013 Contractor: Shoemaker Construction Co Client: Prett Rubin Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: November 1, 2013 | Permit id: 476657 | |||||
SCORE 100 For the erection of a covered walkway for sidewalk protection. Date: December 17, 2012 Contractor: Superior Scaffold Services Inc Client: Prett Rubin Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: January 24, 2013 | Permit id: 438627 | |||||
SCORE 99 Amend permit number 408759 to incorporate facade repairs. Separate permit may be required for shelter platform construction. Date: November 27, 2012 Contractor: Shoemaker Construction Co Client: Prett Rubin Inc | Permit type: Administrative permit | Permit status: Completed | Completion date: January 14, 2013 | Permit id: 428968 | |||||
SCORE 100 Renovation to training office for the pmn training office by the gc including relocation of lights (5), relocation of audio speakers (4), relocation or new duplex (4), new switch (2), relocation of switch (2), using existing wiring in ceilin w j hook etc as per 2008 nec (cc district) Date: October 10, 2017 Contractor: H B Frazer Co Penna Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit type: Electrical permit | Permit status: Active | Completion date: October 10, 2017 | Permit id: 822809 | |||||
SCORE 80 Level ii alterations of existing space including partitions and doors as per plan. Separate permit is required for m. E. P. S. Date: July 26, 2017 Contractor: Shoemakerskanska Jt Venture Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit type: Alteration permit | Permit status: Completed | Completion date: October 24, 2017 | Permit id: 799626 | |||||
Temporary certificate of occupancy Date: February 27, 2017 Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit type: Administrative permit | Permit status: Completed | Completion date: February 28, 2017 | Permit id: 762332 | |||||
SCORE 99 Remove 1 lites to be reused, reuse 19 edge light exit signs, 22 emery ballas lites, add 20-2x4 fixts, 8-3 ways switches, 16 wallmount occup sens, 4 ceilmount occup sens, 100a-480v panel, 57-120v recepts, 4gfci outlets, 3hvac units 48 dual com points 2 patch panels as per 2008 nec (cc district) install 25 horn strobes, 2 pull stations onto existing fire alarrm panel Date: February 14, 2017 Contractor: All Systems Electric And Mainten Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit type: Electrical permit | Permit status: Completed | Completion date: March 24, 2017 | Permit id: 747040 | |||||
SCORE 100 Install space stat and communication points as per 2008 nec (cc district) (commercial) Date: June 14, 2012 Contractor: Cahill Controls Inc Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit type: Electrical permit | Permit status: Expired | Completion date: June 14, 2012 | Permit id: 409336 | |||||
SCORE 100 Install preaction alarm panel & 3 heat detectors. Date: May 17, 2012 Contractor: Oliver Sprinkler Co Inc Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit type: Electrical permit | Permit status: Completed | Completion date: October 9, 2012 | Permit id: 399217 | |||||
SCORE 99 Interior alterations, including elevator construction, toilet room construction and breaches in party wall between 801 market street and 833 market street. See bbs case no. 16883. Date: April 9, 2012 Contractor: Shoemaker Construction Co Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit type: Alteration permit | Permit status: Completed | Completion date: June 28, 2012 | Permit id: 396394 | |||||
SCORE 100 Replace panel feeders, run new feeders to new rtv units. Furnish feeders for new transformers and panels as per 2008 nec. Transformer installation to comply with article 240. 21(c) & 250. Of the 2008 nec. Date: April 16, 2012 Contractor: Fjm Electrical Construction Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit type: Electrical permit | Permit status: Expired | Completion date: April 16, 2012 | Permit id: 391136 | |||||
SCORE 99 Alterations to partial 3rd floor. Separate co required. Separate electrical, plumbing, and fire suppression permits required. Date: March 14, 2012 Contractor: Shoemaker Construction Co Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit type: Alteration permit | Permit status: Completed | Completion date: June 28, 2012 | Permit id: 389864 | |||||
Hvac. See ap#386662 for plans Date: February 15, 2012 Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 28, 2012 | Permit id: 387926 | |||||
SCORE 99 Alterations to partial 3rd floor. Separate permits required for sector a. Separate co required. Separate electrical, plumbing, and fire suppression permits required. Date: February 15, 2012 Contractor: Shoemaker Construction Co Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit type: Alteration permit | Permit status: Completed | Completion date: June 10, 2014 | Permit id: 386662 | |||||
SCORE 100 For level ii alterations to an existing space on the 13th floor of an existing building. Alterations to include the demolition erection of non bearing partition walls, furnishings and finishes. Work also to include the change in occupancy of a portion of the floor to an assembly use, the remainder of the floor to continue being used as business occupancy. All work to be done per approved plans. Separate permits required for mechanical, electrical and fire suppression work. Date: December 30, 2016 Contractor: Revo Industries Inc Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit type: Alteration permit | Permit status: Completed | Completion date: March 24, 2017 | Permit id: 740229 | |||||
SCORE 100 For the installation of a new hvac system with associated duct work and seventy-two (72) registers diffusers (13th floor unit 3), per approved plans. Separate permit required for electrical, plumbing, fire suppression. Date: January 17, 2017 Contractor: Lormar Mechanical Services Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit type: Mechanical permit | Permit status: Completed | Completion date: March 24, 2017 | Permit id: 748574 | |||||
SCORE 100 Interior demolition - 80,0 square feet, interior demolition of non-load bearing structural wall partitions and ceilings only. No other work allowed under this permit. Separate permits required for interior renovation. Contact streets department for dumpster permit and footway closure permits. No structural changes. Must maintain all code required fire rating on wall and floor ceiling assemblies. Call inspector prior for initial inspection prior to the start of work. No exterior work as per historic approval permit received from downstairs Date: August 15, 2017 Contractor: Revo Industries Inc Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit type: Demolition permit | Permit status: Completed | Completion date: October 11, 2017 | Permit id: 808273 | |||||
SCORE 100 Renovation to existing space. Install (2) strobe, (2) speakers strobe,(1)control relay as per drawings Date: August 10, 2017 Contractor: New Light Electric Inc Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit type: Electrical permit | Permit status: Active | Completion date: August 10, 2017 | Permit id: 798760 | |||||
SCORE 100 Install 4 new security panels,4 new cameras,install wiring for 8 doors to include card readers,maglocks,rex and push buttons and strikes per 2008 nec (office space) Date: June 21, 2017 Contractor: Shoreline Electric Inc Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit type: Electrical permit | Permit status: Completed | Completion date: September 27, 2017 | Permit id: 793687 | |||||
SCORE 100 Relocate (78) existing sprinkler heads in order to accommodate tenant layouts as per nfpa no. 13 and all local codes. No changes to exterior. Date: December 20, 2016 Contractor: A And S Sprinkler Co Inc Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit type: Suppression permit | Permit status: Completed | Completion date: March 24, 2017 | Permit id: 744890 | |||||
SCORE 100 Install 3 cat6 plenum rated cables with longest run of 2 as per 2008 nec (cc district) Date: July 18, 2017 Contractor: Par 4 Electric Corp Inc Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit type: Electrical permit | Permit status: Completed | Completion date: August 15, 2017 | Permit id: 792642 | |||||
SCORE 100 Hvac, including installtion of (12) new return grill and (1) ductless split-system, as per plans. Date: August 11, 2017 Contractor: Accord Mechanical And Mgmt Svs Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit type: Mechanical permit | Permit status: Completed | Completion date: August 19, 2017 | Permit id: 792547 | |||||
SCORE 100 Renovation to existing space,install 35 light fixtures,16 switches,63 receptacles,2 hvac feed,(1)208 120volt panel,(1)408 277 volt panel. 1 bus duct switch,4 meter,extend relocate,105 power feed relamp 155 light fixtures per 2008 nec (office space) Date: July 27, 2017 Contractor: New Light Electric Inc Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit type: Electrical permit | Permit status: Completed | Completion date: August 9, 2017 | Permit id: 791517 | |||||
SCORE 100 For level 2 interior alterations to existing office space for tenant fit out as per plans. Separate permits required for any mechanical, electrical, plumbing or fire suppression work. Date: May 18, 2017 Contractor: Sullivan Company The Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit type: Alteration permit | Permit status: Completed | Completion date: August 15, 2017 | Permit id: 780209 | |||||
SCORE 69 Fixture installation Date: October 7, 2008 Contractor: Stanley Rajauski Sr Client: Prett Rubin Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 27, 2008 | Permit id: 181627 | |||||
Relocation of 8 diffusers on the 9th floor Date: October 8, 2008 Client: Prett Rubin Inc | Permit type: Mechanical permit | Permit status: Completed | Completion date: July 29, 2009 | Permit id: 181805 | |||||
SCORE 100 Relocate 12 dupl recepts, relocate (10) 2x4 lts, relocate 5 single pole lt sws, all work to existing circuits and panels (cc dist) Date: September 5, 2008 Contractor: Goldsmith Associates Inc Client: Prett Rubin Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: January 28, 2009 | Permit id: 175167 | |||||
SCORE 100 Install 1 facp, 9 annunciators, 124 speaker strobes, 74 duct detectors, 31 smoke detectors, 58 pull stations, 23 zoned amplifiers, 2 6. 5a booster power supplies, 44 portable telephone receptacles, 16 speakers & 6 strobes. Date: September 19, 2008 Contractor: Anmar Electrical Contractor In Client: Prett Rubin Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: December 2, 2009 | Permit id: 172250 | |||||
Amend permit no. 128617 to incorporate tenant fit out on flrs. 4-6 Date: August 22, 2008 Client: Prett Rubin Inc | Permit type: Mechanical permit | Permit status: Completed | Completion date: August 3, 2009 | Permit id: 170869 | |||||
SCORE 100 Maintain existing temp power nad lighting, add of 2- 800a panels, 1- 15kva transf. 12- 150a bus plugs, 10- 120a bus plugs, 20- 20a sub plugs, 1- 300a bus plug, 1- 400a bus plugs, 3- 350a bus plug, 1- 800a ats switch for existing generator, 5 light fixtures, 86 switches, gfi recepts, 95 mechanical & hvac connections, tel dat, raceways, fire alarm raceways only (cc district) Date: July 11, 2008 Contractor: Anmar Electrical Contractor In Client: Prett Rubin Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: December 2, 2009 | Permit id: 159747 | |||||
SCORE 100 Install sanitary and water in basement and fixtures on 4,5 &6th floors Date: August 29, 2008 Contractor: Dolan Mechanical Inc Client: Prett Rubin Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 23, 2009 | Permit id: 159075 | |||||
Instal air handling units - cooling tpwers - roof top units - self containing vav units - new ducts and piping - 88 diffusers Date: July 14, 2008 Client: Prett Rubin Inc | Permit type: Mechanical permit | Permit status: Completed | Completion date: August 3, 2009 | Permit id: 158382 | |||||
For offices on floors 4-6 in the same building with uses as previously approved. Date: March 14, 2008 Client: Prett Rubin Inc | Permit type: Use permit | Permit status: Completed | Completion date: July 18, 2012 | Permit id: 138463 | |||||
SCORE 100 Install ansul r-102 - 3 gal. Kitchen fire suppression system Date: March 19, 2008 Contractor: Atlantic Fire Equipment Co Inc Client: Prett Rubin Inc | Permit type: Suppression permit | Permit status: Completed | Completion date: August 10, 2013 | Permit id: 138387 | |||||
SCORE 100 Interior demolition of non bearing partitions throughout 9th floor only to include ceiling tiles. Date: September 3, 2008 Contractor: Hms Interiors Inc Client: Prett Rubin Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: August 18, 2011 | Permit id: 174434 | |||||
Hvac. See ap#393504 for plans Date: March 29, 2012 Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 2, 2014 | Permit id: 394866 | |||||
SCORE 99 Revised finishes in 3rd floor level of pedestrian bridge from parking garage Date: March 29, 2012 Contractor: Shoemaker Construction Co Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit type: Alteration permit | Permit status: Completed | Completion date: June 10, 2014 | Permit id: 393504 | |||||
SCORE 100 Tenent fit-out new branch wiring - lighting and devices - additions to existing fire alarm and security system - per plans - per 2008 nec Date: April 27, 2012 Contractor: Armour And Sons Electric Inc Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit type: Electrical permit | Permit status: Completed | Completion date: July 26, 2012 | Permit id: 392986 | |||||
Hvac. See ap#389864 for plans Date: March 14, 2012 Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 28, 2012 | Permit id: 391280 | |||||
Interior and exterior renovations per plans Date: February 29, 2008 Client: Prett Rubin Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: December 7, 2009 | Permit id: 133310 | |||||
SCORE 90 Interior alterations - removal of interior partitions,escalators, suspended ceilings, floor finishes on flrs. B-6; application of spray applied fireproofing on floors 2-6. Date: February 25, 2008 Contractor: Shoemaker Synterra Client: Prett Rubin Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: October 2, 2008 | Permit id: 128617 | |||||
SCORE 100 Install hand sink as per board of health. Drain and water lines existing. Date: November 30, 2007 Contractor: Anthony S. Rachuba Jr Client: Prett Rubin Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 11, 2008 | Permit id: 118911 | |||||
Amedning permit #133310. To include revisions of the layout of the new interior restrooms on the 4th, 5th and 6th floors and the retention of certain portions of plaster ceilings along existing beams. Date: May 16, 2008 Client: Prett Rubin Inc | Permit type: Administrative permit | Permit status: Completed | Completion date: December 26, 2008 | Permit id: 146407 | |||||
SCORE 100 Relocation of 4913 sprinkler heads. Date: September 15, 2008 Contractor: Oliver Sprinkler Co Inc Client: Prett Rubin Inc | Permit type: Suppression permit | Permit status: Completed | Completion date: July 23, 2009 | Permit id: 177206 | |||||
Retail sale of jewelry to include accessory buying and selling of precious metail in space sl1 - lower level of an existing gallery shopping mall with uses as previously approved. Date: June 8, 2011 Client: Prett Rubin Inc | Permit type: Use permit | Permit status: Completed | Completion date: September 2, 2014 | Permit id: 346037 | |||||
Erect sidewalk protection canopy 8 wide x 3 long on filebnert st from 8th st west & long on 8th st from filbert. No attachment to the facade Date: November 10, 2010 Client: Prett Rubin Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: November 12, 2010 | Permit id: 309310 | |||||
Installation of exterior signage. Date: December 13, 2010 Client: Prett Rubin Inc | Permit type: Sign permit | Permit status: Completed | Completion date: April 7, 2011 | Permit id: 306777 | |||||
SCORE 90 Exterior wall improvements at north side of building. Historical commission to review masonry samples in field for approval. Date: September 28, 2010 Contractor: Shoemaker Synterra Client: Prett Rubin Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: December 21, 2010 | Permit id: 297428 | |||||
SCORE 81 Installing wiring for fire supression system, ansul system for computer room (server room), as per nfpa-72 (cc dist) Date: July 15, 2009 Contractor: Chester County Electric Co Client: Prett Rubin Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: August 6, 2009 | Permit id: 221206 | |||||
Tco for 5th floor. Date: May 19, 2009 Client: Prett Rubin Inc | Permit type: Administrative permit | Permit status: Completed | Completion date: August 3, 2009 | Permit id: 216476 | |||||
Tco for 6th floor. Date: April 9, 2009 Client: Prett Rubin Inc | Permit type: Administrative permit | Permit status: Completed | Completion date: April 16, 2009 | Permit id: 209834 | |||||
SCORE 100 Arm over and relocate (1,853) auto sprinklers in the tenant fit-out on 4th, 5th and 6th fls. Fast form and historical Date: April 9, 2009 Contractor: Oliver Sprinkler Co Inc Client: Prett Rubin Inc | Permit type: Suppression permit | Permit status: Completed | Completion date: August 3, 2009 | Permit id: 208658 | |||||
SCORE 100 Arm over and relocate (18) sprinklers in the area redevelopment facade repairs fast form application. Historical Date: April 9, 2009 Contractor: Oliver Sprinkler Co Inc Client: Prett Rubin Inc | Permit type: Suppression permit | Permit status: Completed | Completion date: January 25, 2010 | Permit id: 208656 | |||||
SCORE 100 Install (12) auto sprinklers on the 4th flr., preaction system Date: May 1, 2009 Contractor: Oliver Sprinkler Co Inc Client: Prett Rubin Inc | Permit type: Suppression permit | Permit status: Completed | Completion date: August 3, 2009 | Permit id: 207067 | |||||
SCORE 100 Relocation of the standpipe system (wet) per plans. Date: May 29, 2009 Contractor: Oliver Sprinkler Co Inc Client: Prett Rubin Inc | Permit type: Suppression permit | Permit status: Completed | Completion date: August 3, 2009 | Permit id: 201944 | |||||
Renovations to the existing pedestrian bridge that connects a parking garage to the 801 market st bldg. Renovation include new interior finishes and roof replacement per submitted sealed plans. Date: February 24, 2009 Client: Prett Rubin Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: August 3, 2009 | Permit id: 201122 | |||||
SCORE 100 Addition of annunciator panels, smoke detectors, duct detectors, strobes horn strobes, etc as per nfpa72 (cc district) Date: January 30, 2009 Contractor: Anmar Electrical Contractor In Client: Prett Rubin Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: October 15, 2009 | Permit id: 196456 | |||||
SCORE 100 Install (581) auto sprinklers in the basement. Date: March 23, 2009 Contractor: Oliver Sprinkler Co Inc Client: Prett Rubin Inc | Permit type: Suppression permit | Permit status: Completed | Completion date: August 10, 2013 | Permit id: 195516 | |||||
SCORE 96 Install on 4th fl - 1 sink, 12 water closets, 4 urinals, 12 lavys, 5th fl - 1 sink, 6th fl - 2 sinks Date: December 30, 2008 Contractor: J Rihl Inc Client: Prett Rubin Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: April 9, 2009 | Permit id: 193647 | |||||
SCORE 100 Inst 1-480v,400a pnl,2-120 208v,400a pnls,40-120 208v,200a pnls,14-120 208v,225a pnls,1-75kva 480-120 208v xfmr,reloc exist bus duct plugs,2690-recepts,2622-ltg fixs,380-occ senss,45-lt sws,150-furn feeds,200-poke-thru,racews for tele data av sys(cc dist) Date: December 16, 2008 Contractor: Anmar Electrical Contractor In Client: Prett Rubin Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: October 15, 2009 | Permit id: 190606 | |||||
SCORE 100 Relocate (18) auto sprinklers on the 9th fl. Of old strawbridges bldg. Date: October 28, 2008 Contractor: Oliver Sprinkler Co Inc Client: Prett Rubin Inc | Permit type: Suppression permit | Permit status: Completed | Completion date: December 26, 2008 | Permit id: 185217 | |||||
SCORE 100 Alterations to existing nfpa 13 sprinkler system in an existing office building to include demolition of existing wet piping and installation of new double interlock pre-action system to protect server room 9-701 as per approved plans. Date: October 10, 2017 Contractor: A And S Sprinkler Co Inc Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit type: Suppression permit | Permit status: Active | Completion date: November 16, 2017 | Permit id: 819844 | |||||
SCORE 100 Alterations to existing hvac system to accomodate new office layouts on the 8th and 9th floors of an existing building to inlcud new mechanical equipment, ductwork and piping as per approved plans. Date: September 21, 2017 Contractor: Lormar Mechanical Services Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit type: Mechanical permit | Permit status: Active | Completion date: November 16, 2017 | Permit id: 813270 | |||||
SCORE 100 Alterations:interior plumbing; dept of health & human services;8th and 9th floor; high-rise building; 17 lavy sinks, 2 water hatwers, 18 water closets, 3 urinals ,14 watts fl7c 1 2" for appliances - the installation will compy with the philadephia plumbing code 2004 Date: October 4, 2017 Contractor: Lormar Mechanical Services Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit type: Plumbing permit | Permit status: Active | Completion date: November 16, 2017 | Permit id: 813216 | |||||
SCORE 100 Level ii interior alterations (no change of occupancy) for renovations to existing government offices (gsa - dept of health & human services) on the 8th and 9th floor of an existing high-rise building as per approved plans. Existing building fully sprinklered. Separate permits required for any mep or fire suppression work Date: September 21, 2017 Contractor: Revo Industries Inc Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit type: Alteration permit | Permit status: Active | Completion date: November 16, 2017 | Permit id: 813264 | |||||
Interior alterations Date: January 31, 2012 Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit type: Alteration permit | Permit status: Completed | Completion date: February 27, 2012 | Permit id: 384608 | |||||
SCORE 100 Relocation of auto sprinklers on the 9th floor of gsk Date: October 7, 2008 Contractor: Oliver Sprinkler Co Inc Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit type: Suppression permit | Permit status: Expired | Completion date: December 29, 2008 | Permit id: 181547 | |||||
SCORE 100 Interior renvoations only to include, not limited to, demo existing & install new drywall partitions, new doors and frames glass sidelights, new cabinetry, upgrades to finishes, fit out & furnishings, new ceilings, as per submitted plans. Date: September 23, 2008 Contractor: Hms Interiors Inc Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit type: Alteration permit | Permit status: Completed | Completion date: July 29, 2009 | Permit id: 177140 | |||||
SCORE 90 Erect shelter scaffolding as per approved sealed plans Date: November 25, 2008 Contractor: Shoemaker Synterra Client: Prett Rubin Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: December 26, 2008 | Permit id: 184913 | |||||
SCORE 100 Relocate heads to fit new wall ceiling layout Date: May 7, 2014 Contractor: Majek Fire Protection, Inc Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit type: Suppression permit | Permit status: Completed | Completion date: October 6, 2014 | Permit id: 535139 | |||||
SCORE 100 Relocate 926 sprinklers on the 1st and 3rd floors-office Date: March 8, 2012 Contractor: Oliver Sprinkler Co Inc Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit type: Suppression permit | Permit status: Completed | Completion date: June 28, 2012 | Permit id: 392218 | |||||
SCORE 100 Amend permit #384608 to show revisions as per plans.-office bldg Date: March 1, 2012 Contractor: Frank R Lamarra Builders And Con Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit type: Administrative permit | Permit status: Completed | Completion date: June 3, 2014 | Permit id: 388983 | |||||
SCORE 100 Connect and disconnect ground wires and feeder cables from one mobile generators: one 56kw. Temporary event- starting11 11 16 and ending 11 14 16 (commercial) Date: November 9, 2016 Contractor: Mjk Electrical Corporation Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit type: Electrical permit | Permit status: Expired | Completion date: November 9, 2016 | Permit id: 735362 | |||||
SCORE 100 Fast form building permit Date: April 27, 2007 Contractor: Oliver Sprinkler Co Inc Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit status: Completed | Completion date: December 31, 2009 | Permit id: 71874` | |||||
SCORE 100 Relocate (12) existing sprinkler heads(no changes to exterior). Date: June 30, 2015 Contractor: A And S Sprinkler Co Inc Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit type: Suppression permit | Permit status: Completed | Completion date: September 23, 2015 | Permit id: 621450 | |||||
SCORE 100 Sidewalk shed protection as per plan. Date: September 4, 2014 Contractor: Superior Scaffold Services Inc Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit type: Alteration permit | Permit status: Expired | Completion date: October 28, 2015 | Permit id: 559578 | |||||
SCORE 100 Installation of (16) new sprinklers on the 12th floor in office bldg to existing sprinkler system Date: March 20, 2012 Contractor: Oliver Sprinkler Co Inc Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit type: Suppression permit | Permit status: Completed | Completion date: June 10, 2014 | Permit id: 388486 | |||||
SCORE 100 Ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers grilles diffusers, and warm-air appliances as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: April 21, 2017 Contractor: Lormar Mechanical Services Permit type: Mechanical permit | Permit status: Active | Completion date: June 23, 2017 | Permit id: 777090 | |||||
SCORE 100 Install new exterior deck finish as per plans. Date: April 2, 2015 Contractor: Sullivan Company The Client: Philadelphia - Unit 1d Ll | Permit type: Alteration permit | Permit status: Completed | Completion date: June 6, 2016 | Permit id: 586662 | |||||
SCORE 99 Tco for special event on 2 28 2012 between 6:30pm to 9:00pm. Compliance with philadelphia fire code required Date: February 13, 2013 Contractor: Shoemaker Construction Co Permit type: Administrative permit | Permit status: Completed | Completion date: February 22, 2013 | Permit id: 449711 | |||||
SCORE 100 Relocate 4 heads on 2nd floor Date: June 20, 2013 Contractor: Majek Fire Protection, Inc Permit type: Suppression permit | Permit status: Completed | Completion date: November 29, 2013 | Permit id: 478759 | |||||
SCORE 99 Continued core shell interior and exterior alterations, restoration work, structural repairs, patch and repair historic work, plaster restoration, facade work to concourse level through 2nd floor, exterior storefront window-door replacement and construct new accessible ramp entry . Existing historic provisions apply. Separate permits required for co fit out; electrical, plumbing, hvac, sprinklers, signs, sidewalk shelter platforms if required. See prior restoration permits ap380468 380472 396394 for prior approvals and work. Date: May 14, 2013 Contractor: Shoemaker Construction Co Permit type: Alteration permit | Permit status: Completed | Completion date: November 21, 2013 | Permit id: 468513 | |||||
SCORE 100 Level ii alterations to include new partition walls,doors, hardwood as finishes as per plans Date: June 16, 2015 Contractor: Sullivan Company The Permit type: Alteration permit | Permit status: Completed | Completion date: September 23, 2015 | Permit id: 614526 | |||||
SCORE 100 F i 49 2x4 lights,4 new 2x4 lights 7 wall occ sensors, 6 floor furniture feeds,26 duplex rec,5 dedicated rec,12 ring& strings, 2 floor boxes, f i fire alarm and wiring of new heat pumps. As per 2008 nec,(center city district) Date: August 21, 2015 Contractor: Shoreline Electric Inc Permit type: Electrical permit | Permit status: Completed | Completion date: October 28, 2015 | Permit id: 625139 | |||||
SCORE 100 Selective interior demolition of ceiling grid, doors and non-bearing partitions. Date: December 23, 2013 Contractor: Sullivan Company The Permit type: Demolition permit | Permit status: Completed | Completion date: May 8, 2014 | Permit id: 512557 | |||||
SCORE 100 Asbestos removal abatement required prior to the commencement of any work. For level ii alterations to hvac work on the 11th floor of an existing building. Hvac alterations to include the erection replacement of register, diffusers, and mechanical appliances with associated ductwork. All work to be done per approved plans. Separate permits required for electrical, plumbing and fire supression work. Date: April 1, 2014 Contractor: Elliott Lewis Corporation Permit type: Mechanical permit | Permit status: Completed | Completion date: July 28, 2014 | Permit id: 524302 | |||||
SCORE 100 Alterations: interior plumbing; truck dock level and concourse level burlington coat factory - the installation will comply with the philadephia plubming code 2004 Date: February 16, 2017 Contractor: Lormar Mechanical Services Permit type: Plumbing permit | Permit status: Completed | Completion date: September 14, 2017 | Permit id: 749509 | |||||
SCORE 100 For mechanical alteratons to include the installation of thirteen (13) heat pumps, new registers. Diffuers and associated ductwork, as per approved plans. Date: February 8, 2017 Contractor: Lormar Mechanical Services Permit type: Mechanical permit | Permit status: Completed | Completion date: September 14, 2017 | Permit id: 754481 | |||||
SCORE 80 Multi story, selective interiorm non-structural demolition, within historical building, as per phc approved plans. Date: April 21, 2014 Contractor: Shoemakerskanska Jt Venture Permit type: Demolition permit | Permit status: Completed | Completion date: July 8, 2014 | Permit id: 530476 | |||||
SCORE 100 Install new lights fixtures qty 1663 and install new lighting control panel per 2008 nec (retail) Date: April 3, 2017 Contractor: Shelly Electric Co Inc Permit type: Electrical permit | Permit status: Completed | Completion date: September 14, 2017 | Permit id: 765618 | |||||
SCORE 80 Temporary certificate of occupancy for burlington coat factory Date: July 14, 2017 Contractor: Shoemakerskanska Jt Venture Permit type: Administrative permit | Permit status: Completed | Completion date: August 1, 2017 | Permit id: 800028 | |||||
Lower concourse floor slab of 823 portion of 801-23 market st to match the existing floor elevation in 833 market st. And modify exiting openings between 823 and 833 market st. Date: June 2, 2016 Permit type: Alteration permit | Permit status: Completed | Completion date: August 1, 2017 | Permit id: 647870 | |||||
SCORE 100 For the installation of four (4) water-sourced heat pumps with waterside economizer coils and associated ductwork connecting to an existing hvac system as per approved plans reviewed by historical commission. (no new refrigerant piping to be installed.) Date: October 1, 2014 Contractor: River Mechanical Inc Permit type: Mechanical permit | Permit status: Completed | Completion date: October 18, 2014 | Permit id: 544713 | |||||
Int alterations fitout for concourse level or former srawbridges bldg per submitted plans. Separate permits required for mep work. See ap #7202 for plans. Date: October 14, 2016 Permit type: Alteration permit | Permit status: Completed | Completion date: September 14, 2017 | Permit id: 720280 | |||||
SCORE 100 Establish deck on existing 11th floor of a 14 story building. Deck to be located on side street of existing building, which fronts on market. Deck to be establishes on an existing setback at the 11th floor level Date: October 8, 2014 Contractor: Sullivan Company The Client: Philadelphia - Unit 1d Ll | Permit type: Zoning/use permit | Permit status: Completed | Completion date: October 8, 2014 | Permit id: 527452 | |||||
SCORE 100 Relocate (98) existing sprinkler heads in order to accommodate the new wall and ceiling layout as per all nfpa no. 13 and local codes. Date: February 28, 2014 Contractor: A And S Sprinkler Co Inc Client: Philadelphia - Unit 1d Ll | Permit type: Suppression permit | Permit status: Completed | Completion date: August 11, 2014 | Permit id: 521519 | |||||
Tco for franklin flea special event permit. Dates 4 24 & 4 25 15. Times : 10am - 9pm. See attached plan and schedule, certifications of alarms and sprinklers, and code bulletin. Occupant load 5 persons. Fire watch applies Date: March 23, 2015 Permit type: Administrative permit | Permit status: Completed | Completion date: April 21, 2015 | Permit id: 591512 | |||||
SCORE 100 Tenant fit out of existing space new branch circuit wiring from existing panels to new light fixtures, recepts, showcases, wire & connect 13 vav boxes with power control wiries by others as per 2008 nec (cc district)no fire alarm on this permit Date: July 25, 2014 Contractor: Goldsmith Associates Inc Permit type: Electrical permit | Permit status: Completed | Completion date: December 9, 2014 | Permit id: 545601 | |||||
SCORE 100 Install future tees in vent & sanitary risers for century 21 store. Re-rough plumbing for new escaltor and elevators (retail space) Date: June 23, 2014 Contractor: River Mechanical Inc Permit type: Plumbing permit | Permit status: Completed | Completion date: September 8, 2015 | Permit id: 544686 | |||||
SCORE 99 For selective repair and replacement of the north exterior facade as shown in approved plans. All work must conform to philadelphia historical commissions approved plans (07. 25. 16). Date: April 7, 2017 Contractor: Shoemaker Construction Co Permit type: Alteration permit | Permit status: Active | Completion date: June 6, 2017 | Permit id: 709896 | |||||
SCORE 96 Utility space of retail building relocation of electrical equipment feeders, wire 2 sump pumps and relocate feeder to branch circuit panel, temporary power and lightin as per 2008 nec (cc district)relocate 3 fire alarm sprinkler flow modules Date: August 4, 2016 Contractor: Jw Carrigan Llc Permit type: Electrical permit | Permit status: Expired | Completion date: August 4, 2016 | Permit id: 704317 | |||||
SCORE 80 Interior alterations to include new ramp, stairs, escalators, structural work, and all other work as per approved plans. No work to front facade. No work to exterior doors or windows. Separate permit required for mechanical, electrical, and plumbing work. Asbestos abatement required prior to commencement of work. Amended permit required for all final special inspection approvals Date: May 14, 2014 Contractor: Shoemakerskanska Jt Venture Permit type: Alteration permit | Permit status: Completed | Completion date: October 18, 2014 | Permit id: 530478 | |||||
Temporary certificate of occupancy and lawful occupancy sign for a two (2) day short-term event (april 1-2, 2016). Event must comply with variance of general application no. B-0923-05 and submitted material. Date: March 31, 2016 Permit type: Administrative permit | Permit status: Completed | Completion date: April 1, 2016 | Permit id: 677958 | |||||
For the documentation for use as retail sale of consumer goods, wearing apparel and accessories, and sundries, pharmaceuticals and convenience sales on the 1st and 2nd floor in an existing structure with uses as previously approved. Date: May 1, 2014 Permit type: Use permit | Permit status: Completed | Completion date: September 29, 2017 | Permit id: 533820 | |||||
SCORE 80 Amending permit #530478 re-orientation of escalator, enlarge existing unprotected openings, install three overhead coiling fire door, horizontal folding fire door, and all other per approved plans and bbs variance case no. 22815. Amended permit required for all final special inspection approvals Date: July 15, 2014 Contractor: Shoemakerskanska Jt Venture Permit type: Administrative permit | Permit status: Completed | Completion date: October 6, 2014 | Permit id: 541417 | |||||
SCORE 80 Administrative permit to document special inspectors contracted to perform special inspections required under original permit #530478 and amended permit #541417. Date: August 6, 2014 Contractor: Shoemakerskanska Jt Venture Permit type: Administrative permit | Permit status: Completed | Completion date: January 8, 2015 | Permit id: 553744 | |||||
Replace existing metal platform at loading dock with new masonry concrete platform and enclosure. Relocate existing overhead coiling door to new masonry wall. All alterations and structural work shall be in accordance with approved plans. Separate permit required for mechanical, electrical, plumbing, and fire suppression work. Date: August 19, 2014 Client: Philadelphia - Unit 1d Ll | Permit type: Alteration permit | Permit status: Completed | Completion date: October 10, 2014 | Permit id: 554623 | |||||
SCORE 86 Install new demand meters on existing panealboards,new light fixtures with lighting controls,install recpetacles,power and final connections to modular furniture and floor boxes. Install av raceway and wiring,security wiring and devices tele data wiring devices per 2008 nec (office space)install new fa devices orginating from the existing facp per nfpa 72 Date: December 5, 2017 Contractor: Independence Electric Inc Client: Philadelphia Office 2016 | Client Company: Philadelphia Office 2016 | Permit type: Electrical permit | Permit status: Active | Completion date: December 5, 2017 | Permit id: 818753 | |||||
SCORE 100 Shelter platform permit- erection of a sidewalk shelter platform as per engineered plans. Streets department permit is required for sidewalk closure prior to the start work. Date: August 29, 2017 Contractor: Superior Scaffold Services Inc Client: Phila Redevelopment Authority | Client Company: Phila Redevelopment Auth | Permit type: Alteration permit | Permit status: Active | Completion date: November 8, 2017 | Permit id: 812149 | |||||
For the establishment of unity of use to create one (1) lot for zoning purposes (to be known as 907-37 market street) with restrictive covenants, agreements and easements to be recorded by deed to bind current and future owners of the contiguous ten (10) (801s market st # a, 833 market st, 901s market st # a, 901 market st, 903 market st, 905 market st, 907-37 market st, 1001-19 market st, 1025 market st, 15-19 n 10th st) parcels to preserve the unity of use and the legality of the entire project that stems from single zoning lot treatment. Prior to issuance of certificate of occupancy, proof of recordation of easements, agreements and restrictive covenants must be supplied. See a p no 728943. Date: October 21, 2016 Client: Phila Redevelopment Authority | Client Company: Phila Redevelopment Auth | Permit type: Zoning permit | Permit status: Completed | Completion date: October 21, 2016 | Permit id: 730160 |