Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Administrative permit ![]() Client: Williams Shante A | Permit status: Completed | Permit id: 87342 | |||||
Zoning permit ![]() Client: Williams Shante A | Permit status: Completed | Permit id: 47211 | |||||
Electrical permit ![]() Client: Williams Shante A | Permit status: Completed | Permit id: 317921 | |||||
Alteration permit ![]() Client: Williams Shante A | Permit status: Completed | Permit id: 34376 | |||||
Electrical permit ![]() Client: Williams Shante A | Permit status: Expired | Permit id: 80537 | |||||
Plumbing permit ![]() Client: Williams Shante A | Permit status: Completed | Permit id: 78588 | |||||
Mechanical permit ![]() Client: Williams Shante A | Permit status: Completed | Permit id: 327736 | |||||
Administrative permit ![]() Client: Williams Shante A | Permit status: Completed | Permit id: 52422 | |||||
Electrical permit ![]() Client: Williams Shante A | Permit status: Expired | Permit id: 80537 | |||||
Plumbing permit ![]() Client: Williams Shante A | Permit status: Completed | Permit id: 78588 | |||||
Mechanical permit ![]() Client: Williams Shante A | Permit status: Completed | Permit id: 327736 | |||||
Zoning permit ![]() Client: Williams Shante A | Permit status: Completed | Permit id: 47211 | |||||
Alteration permit ![]() Client: Williams Shante A | Permit status: Completed | Permit id: 34376 | |||||
Electrical permit ![]() Client: Williams Shante A | Permit status: Completed | Permit id: 317921 | |||||
For the replacement of a 1st floor front portion of a residential structure in its original location. For the erection of a second floor addition conforming to the current side yard setback. Total height shall not exceed 35-0". ![]() Client: Williams Shante A | Permit type: Zoning permit | Permit status: Completed | Completion date: December 21, 2007 | Permit id: 52300 | |||||
Amend permit # 34376 to reflect a change in scope,the change is for the placement of a basement foundation system. Foundation will be a fully excavated basement with footings placed as designed per geotechnical report and the foundation system design shown on the approved plans. ![]() Client: Williams Shante A | Permit type: Administrative permit | Permit status: Completed | Completion date: October 19, 2007 | Permit id: 52422 | |||||
For the partial demolition of one story portion of an existing structure, located in the front area. ![]() Client: Williams Shante A | Permit type: Zoning permit | Permit status: Completed | Completion date: January 9, 2007 | Permit id: 47211 | |||||
SCORE 56 For legalization of the demolition of a one story portion of an existing structure and the deteriorated foundation system. For the placement of a new footing and foundation system as shown on the professinal engineers sealed plan. Seperate permits required for the erection of the framed structure. ![]() ![]() Client: Williams Shante A | Permit type: Alteration permit | Permit status: Completed | Completion date: October 19, 2007 | Permit id: 34376 | |||||
SCORE 100 Replace 100amp service complete as per 2005 nec (north dist) ![]() ![]() Client: Williams Shante A | Permit type: Electrical permit | Permit status: Expired | Completion date: June 4, 2007 | Permit id: 80537 | |||||
SCORE 86 Rough in new drain lines for kitchen sink and new 2" vent stack, re rough new drain line for bathtub and install new diverter ![]() ![]() Client: Williams Shante A | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 6, 2007 | Permit id: 78588 | |||||
SCORE 100 Rewire 2nd floor bedroom as per 2008 nec. Replace 12 receptacles, 5 switches, 4 gfcis & ground system. ![]() ![]() Client: Williams Shante A | Permit type: Electrical permit | Permit status: Completed | Completion date: October 6, 2011 | Permit id: 317921 | |||||
SCORE 99 Install one 100,0 btu 90% gas furnace with 3 ton a c with related duct work,furnace located in basement,condenser rear yard. ![]() ![]() Client: Williams Shante A | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 10, 2014 | Permit id: 327736 |