Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Mechanical permit Date: September 21, 2016 Client: Nassau Realty Group Llc | Permit status: Completed | Permit id: 721523 | |||||
Electrical permit Date: January 23, 2017 Client: Nassau Realty Group Llc | Permit status: Active | Permit id: 721169 | |||||
Plumbing permit Date: September 27, 2016 Client: Nassau Realty Group Llc | Permit status: Completed | Permit id: 724013 | |||||
Alteration permit Date: August 1, 2016 Client: Nassau Realty Group Llc | Permit status: Active | Permit id: 704777 | |||||
Use permit Date: May 17, 2016 Client: Nassau Realty Group Llc | Permit status: Completed | Permit id: 687247 | |||||
Use permit Date: April 6, 2010 Client: Spring Easton Llc | Permit status: Completed | Permit id: 271017 | |||||
Administrative permit Date: October 13, 2016 Client: Nassau Realty Group Llc | Permit status: Completed | Permit id: 728961 | |||||
Alteration permit Date: November 14, 2012 Client: Diane Bryman Rug Shoppe Inc | Permit status: Completed | Permit id: 437934 | |||||
Use permit Date: March 16, 2009 Client: Spring Easton Llc | Permit status: Completed | Permit id: 205354 | |||||
Zoning use permit Date: November 12, 2009 Client: Spring Easton Llc | Permit status: Completed | Permit id: 220214 | |||||
Electrical permit Date: April 30, 2009 Client: Spring Easton Llc | Permit status: Completed | Permit id: 213250 | |||||
Use permit Date: January 19, 2011 Client: Spring Easton Llc | Permit status: Completed | Permit id: 321401 | |||||
Alteration permit Date: April 6, 2009 Client: Spring Easton Llc | Permit status: Completed | Permit id: 207101 | |||||
Plumbing permit Date: April 20, 2009 Client: Spring Easton Llc | Permit status: Completed | Permit id: 211349 | |||||
Permit for the erection of (3) flat wall awnings, two with copy, accessory to a nail salon with pedicures 1st floor in the same building as two apartments 2nd floor and two apartments 3rd floor. Date: August 17, 2009 Client: Spring Easton Llc | Applicant: Kiwon Lee | Permit type: Appeal | Permit status: Granted | Completion date: November 17, 2009 | Permit id: 9767 | |||||
SCORE 100 1st recessed light ,3-20amp circuits,2nd floor,4-20amp circuit change circuit 200amp panel to a circuit panel per 2008 nec (mixed use)north district Date: January 23, 2017 Contractor: Ade Electric Client: Nassau Realty Group Llc | Permit type: Electrical permit | Permit status: Completed | Completion date: February 2, 2017 | Permit id: 721169 | |||||
SCORE 93 (2) 92k btu gas furnaces; (2) 3 ton a c condensers (ground). Date: September 21, 2016 Contractor: Air Done Right Client: Nassau Realty Group Llc | Permit type: Mechanical permit | Permit status: Completed | Completion date: January 28, 2017 | Permit id: 721523 | |||||
SCORE 100 Roof replacement, single-ply gaf sbs rubberoid mop system (no more than 10% of sheathing) - commercial property Date: November 14, 2012 Contractor: Kurtz Construction Co Inc Client: Ane Bryman Rug Shoppe Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: August 12, 2013 | Permit id: 437934 | |||||
General rehab of drycleaners sheetrock half of wall areas, paint complete interior, repair hardwood flooring, install 1 sq. Ft of drop ceiling. No fire rated assemblies to be disturbed. No other work allowed under this minor alteration permit. Date: January 26, 2009 Client: Spring Easton Llc | Permit type: Alteration permit | Permit status: Expired | Completion date: February 3, 2009 | Permit id: 197948 | |||||
SCORE 70 For prescriptive alterations to create a retail clothing store @ 1st floor including erection of partition walls for dwelling unit & toilet room spaces within exist. Two (2) story above grade plane, w. Unoccupied basement, building; building is not fully sprinklered. Separate permit reqd for any mech., elec. & plumb. Work. Date: August 1, 2016 Contractor: Construction Management Group Client: Nassau Realty Group Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: February 2, 2017 | Permit id: 704777 | |||||
SCORE 100 Install 200amp service with meter socket and circuit panel, 7 gfci recepts, 6 - 120v recepts, 6 light fixtures with single pole switches as per 2005 nec (north district) Date: April 30, 2009 Contractor: Pruden Clayton Client: Spring Easton Llc | Permit type: Electrical permit | Permit status: Completed | Completion date: March 23, 2010 | Permit id: 213250 | |||||
Retail sale of wearing apparels and accessories and sale of prepackaged food and beverages on 1st floor (one tenant) and existing one apt on 2nd floor (building # 1) in an existing structure on the same lot proposed for a yoga studio (personal services) in existing building # 2 . No sign on this permit. Date: May 17, 2016 Client: Nassau Realty Group Llc | Permit type: Use permit | Permit status: Completed | Completion date: May 17, 2016 | Permit id: 687247 | |||||
Tco for 1st floor store for permit #704777 Date: October 13, 2016 Client: Nassau Realty Group Llc | Permit type: Administrative permit | Permit status: Completed | Completion date: January 28, 2017 | Permit id: 728961 | |||||
Installation of non illuminated awning over store front-see attached ;rendering & dwgs - one awning no signage; 2 awnings with signage one facing germantown ave. & one facing willow grove - awnings have a 24" projection and an 86 elevation - there is a 10x16" sign on these 2 awnings Date: November 12, 2009 Client: Spring Easton Llc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: November 12, 2009 | Permit id: 220214 | |||||
SCORE 100 Replace waste and water line on 2nd floor bathroom and replace fixtures 1 wc,1 lav sink,1 bath tub,1 kitchen sink and replace on 1st floor 1 wc,1 lav sink (mixed use)the installation will comply with the philadelphia plumbing code 2004 Date: September 27, 2016 Contractor: Norman Cole Sr, Client: Nassau Realty Group Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: January 21, 2017 | Permit id: 724013 | |||||
Use to dry cleaning Date: January 23, 2009 Client: Spring Easton Llc | Permit type: Use permit | Permit status: Completed | Completion date: January 23, 2009 | Permit id: 198015 | |||||
Use to beauty salon Date: March 16, 2009 Client: Spring Easton Llc | Permit type: Use permit | Permit status: Completed | Completion date: March 16, 2009 | Permit id: 205354 | |||||
SCORE 56 Interior alterations for h c bathroom as per plans Date: April 6, 2009 Contractor: Jwa Design Build Client: Spring Easton Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: June 19, 2009 | Permit id: 207101 | |||||
SCORE 100 Install drain and water lines, set fixtures 1 water closets, 3 lavys and 6 pedi chair hot water tank Date: April 20, 2009 Contractor: Roy Sims Client: Spring Easton Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 16, 2015 | Permit id: 211349 | |||||
Use as a nail salon Date: April 6, 2010 Client: Spring Easton Llc | Permit type: Use permit | Permit status: Completed | Completion date: April 6, 2010 | Permit id: 271017 | |||||
Adding facials to current use of nail salon Date: January 19, 2011 Client: Spring Easton Llc | Permit type: Use permit | Permit status: Completed | Completion date: January 19, 2011 | Permit id: 321401 |