Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Wiring & installing 50-outlets, 35-sw, 65-lgts fixtures, 9-smoke detectors, 10-gfi outlets, 6-phone & tv jacks, 200amp hook up all heat & a c units as per nec 2008 (2fd) Date: August 21, 2013 Contractor: Harte Electrics Client: Griffin-Shelley Eric E Jr | Permit type: Electrical permit | Permit status: Completed | Completion date: May 1, 2014 | Permit id: 490432 | |||||
SCORE 100 Installing 3 toilets, 3 lavs, 2 tubs, 1 kitchen sink, 1 washer, 1 water heater (sfd) Date: August 2, 2013 Contractor: Ferko Plumbing Client: Griffin-Shelley Eric E Jr | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 14, 2015 | Permit id: 487086 | |||||
SCORE 99 For the erection of a roof deck above the second story level with a communicating spiral stair to the roof deck above the third story level to an existing attached single family dwelling per submitted plan and manufacturers installation instructions. Date: August 23, 2013 Contractor: Loonstyn Bros Construction Llc Client: Griffin-Shelley Eric E Jr | Permit type: Alteration permit | Permit status: Completed | Completion date: November 29, 2013 | Permit id: 484107 | |||||
SCORE 100 Replace curb trap and fai(sfd) Date: May 8, 2012 Contractor: Drain Masters Plumbing Llc Client: Fierro Hector P Mccoy Bridget | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 31, 2012 | Permit id: 403886 | |||||
SCORE 100 Rehabing three and a half existign bathrooms and running new water lines and drain lines, stack, laundry room Date: September 2, 2016 Contractor: Ernest Ruiz Permit type: Plumbing permit | Permit status: Expired | Completion date: June 1, 2017 | Permit id: 719545 | |||||
SCORE 70 Drywall, ceramic tile, kitchen cabinets, paint-ez permit stadard alterations- for alterations to an existing one family dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: August 8, 2016 Contractor: Hyland Restoration Permit type: Alteration permit | Permit status: Active | Completion date: October 20, 2017 | Permit id: 713300 | |||||
Mechanical permit Date: August 26, 2013 Client: Griffin-Shelley Eric E Jr | Permit status: Completed | Permit id: 491349 | |||||
Plumbing permit Date: September 2, 2016 Permit status: Active | Permit id: 719545 | |||||
Alteration permit Date: August 8, 2016 Permit status: Active | Permit id: 713300 | |||||
Electrical permit Date: September 8, 2016 Permit status: Active | Permit id: 720430 | |||||
Alteration permit Date: June 14, 2013 Client: Griffin-Shelley Eric E Jr | Permit status: Completed | Permit id: 477519 | |||||
Plumbing permit Date: August 2, 2013 Client: Griffin-Shelley Eric E Jr | Permit status: Completed | Permit id: 487086 | |||||
Zoning permit Date: August 23, 2013 Client: Griffin-Shelley Eric E Jr | Permit status: Completed | Permit id: 484105 | |||||
Administrative permit Date: August 23, 2013 Client: Griffin-Shelley Eric E Jr | Permit status: Completed | Permit id: 491014 | |||||
Electrical permit Date: August 21, 2013 Client: Griffin-Shelley Eric E Jr | Permit status: Completed | Permit id: 490432 | |||||
Plumbing permit Date: May 8, 2012 Client: Fierro Hector P Mccoy Bridget | Permit status: Completed | Permit id: 403886 | |||||
SCORE 100 1- 50a, 120 240v gfci protected circuit with disconnect, for hot tub ... Ina ccordance with 2008 nec for a one family building Date: April 19, 2016 Contractor: G J Rossi And Son Client: Griffin-Shelley Eric E Jr | Permit type: Electrical permit | Permit status: Completed | Completion date: August 17, 2016 | Permit id: 684417 | |||||
SCORE 99 Install 2 hvac units with associated ductwork(sfd) Date: August 26, 2013 Contractor: David Mercado Client: Griffin-Shelley Eric E Jr | Permit type: Mechanical permit | Permit status: Completed | Completion date: November 29, 2013 | Permit id: 491349 | |||||
SCORE 99 Amend existing a p #477519 to increase the square footage to 25 sq. Ft. Date: August 23, 2013 Contractor: Loonstyn Bros Construction Llc Client: Griffin-Shelley Eric E Jr | Permit type: Administrative permit | Permit status: Completed | Completion date: November 29, 2013 | Permit id: 491014 | |||||
SCORE 96 Rewire including switches, receptacles, smoke and co detectors, lights. Per 2008 nec (sfd)cc district Date: September 8, 2016 Contractor: Samuel Ehmann Electrical Serv Permit type: Electrical permit | Permit status: Expired | Completion date: September 8, 2016 | Permit id: 720430 | |||||
SCORE 99 For the erection of a roof deck above the second story level with a communicating spiral stair to the roof deck above the third story level to an existing attached single family dwelling. Size and location as shown on submitted plan. Date: August 23, 2013 Contractor: Loonstyn Bros Construction Llc Client: Griffin-Shelley Eric E Jr | Permit type: Zoning permit | Permit status: Completed | Completion date: August 23, 2013 | Permit id: 484105 | |||||
SCORE 99 Interior demo existing non load baring walls, windows throguh out, replace with new 2x4 constuction in existing location, new rubber roof and stucco where needed. Interior alterations - single family dwelling - applicant agrees to limit the construction to comply with ez permit standard for interior alterations. Separate permits required for plumbing, electric and hvac. New roof and succo to be included in this permit. Date: June 14, 2013 Contractor: Loonstyn Bros Construction Llc Client: Griffin-Shelley Eric E Jr | Permit type: Alteration permit | Permit status: Completed | Completion date: November 29, 2013 | Permit id: 477519 |