Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Interior alteration to suite 850. Work to include electrical,mechanical,and plumbing. Date: December 7, 2012 Client: Jbg Companies | Applicant: George Delgado | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1302077 | |||||
Plumbing and gas Date: February 7, 2013 Applicant: Charles M. Chisley | Permit status: Completed | Permit id: P1302722 | |||||
Interior alteration to 9th floor. Work to include mechanical,and electrical. Date: June 1, 2012 Client: Jbg Companies | Applicant: Jbg Companies; Kristina Delgado | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1209319 | |||||
Electrical Date: March 30, 2012 Applicant: Paul E Warren | Permit status: Completed | Permit id: E1204777 | |||||
Revision to permit number b1209319. Work to include mechanical,and electrical. Date: February 6, 2013 Client: Jbg Companies | Applicant: George Delgado | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1303709 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilf22ix5fowd5yxq6rumle9t Date: March 13, 2013 Client: Jbg Companies | Applicant: Doris Daye; Jbg Companies; Paul Warren | Permit type: Electrical | Permit status: Completed | Permit id: E68360388 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilf22ix5fowd5zxj1vanq4%2fa Date: March 7, 2013 Client: Jbg Companies Jbg Companies | Applicant: Rosemary Hoyle; Jbg Companies Jbg Companies; Paul Warren | Permit type: Electrical | Permit status: Completed | Permit id: E72645643 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilduxhuuor9d8lpyzgm947rc Date: January 22, 2013 Applicant: Richard Collins; 8 K St. Association Llc; Robert Dike | Permit type: Electrical | Permit status: Permit issued | Permit id: E99625688 | |||||
Mechanical Date: March 13, 2013 Applicant: Kewal K. Khatta | Permit status: Permit issued | Permit id: M1301124 | |||||
Tailoring shop at first floor. Low partition 2 changing enclosures 1 mop sink some additional outlets as needed replacement existing lighting with new ones as needed for tailor work Date: August 8, 2013 Client: Yong Kee Kim | Applicant: Yong Kee Kim | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1305096 | |||||
Provide swing stage access to perform caulking and coating of faĆ¾ade elements. Date: October 20, 2014 Client: The Meridian Group, Inc. | Applicant: The Atlantic Company Of America, In | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sc1500006 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilcdff%2fkh5jxxzadaqzaqssu Date: December 16, 2014 Client: Tmg 8 K Street Llc | Applicant: Thad Gerardi; Tmg 8 K Street Llc; Albert Winfield | Permit type: Electrical | Permit status: Completed | Permit id: E45824473 | |||||
Expansion joint repairs - partial depth top surface concrete repairs and waterproofing membrane replacement Date: November 6, 2015 Client: Lincoln Property Company | Applicant: John Pan | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1601390 | |||||
Plumbing and gas Date: August 19, 2013 Applicant: Franklin T Gaines | Permit status: Completed | Permit id: P1307282 | |||||
Electrical Date: August 19, 2013 Applicant: Kuhwa Lee | Permit status: Completed | Permit id: E1307781 | |||||
Adjustment to e1303944 Date: March 22, 2013 Applicant: Fred Latimore | Permit type: Electrical | Permit status: Permit issued | Permit id: E1303975 | |||||
Electrical Date: March 22, 2013 Applicant: Fred Latimore | Permit status: Permit issued | Permit id: E1303976 | |||||
Upgrade 2 amp service to 4 amp and install outlets in eleventh floor server room. Install ductwork and ac equipment on eleventh floor. Date: November 12, 2014 Client: Tmg 8 K Street, Llc | Applicant: Tanya Hill | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1501482 | |||||
Electrical Date: November 12, 2014 Applicant: Albert E Winfield | Permit status: Permit issued | Permit id: E1501099 | |||||
Mechanical Date: November 12, 2014 Applicant: Nevin Arthur Camp | Permit status: Completed | Permit id: M1500395 | |||||
SCORE 100 Interior alteration to suite 850. Work to include electrical,mechanical,and plumbing. Date: December 7, 2012 Contractor: George Delgado Client: Jbg Companies | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1302077 | |||||
SCORE 56 Interior alteration to 9th floor. Work to include mechanical,and electrical. Date: June 1, 2012 Contractor: Jbg Companies Kristina Delgado Client: Jbg Companies | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1209319 | |||||
SCORE 76 Interior alteration to 9th floor. Work to include mechanical,and electrical. Date: June 1, 2012 Contractor: Jbg Companies; Kristina Delgado Client: Jbg Companies | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1209319 | |||||
SCORE 96 Electrical Date: March 30, 2012 Contractor: Paul E Warren Permit status: Completed | Permit id: E1204777 | |||||
SCORE 96 Electrical Date: March 21, 2013 Contractor: Fred Latimore Permit status: Permit issued | Permit id: E1303944 | |||||
SCORE 96 Mechanical Date: March 13, 2013 Contractor: Kewal K. Khatta Permit status: Permit issued | Permit id: M1301124 | |||||
SCORE 96 Electrical Date: May 15, 2015 Contractor: Daniel O White Client: Tmg 8 K Street Llc | Permit status: Permit issued | Permit id: E1505878 | |||||
SCORE 93 Provide swing stage access to perform caulking and coating of faade elements. Date: October 20, 2014 Contractor: The Atlantic Company Of America In Client: The Meridian Group, Inc. | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sc1500006 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilcdff%2fkh5jxxzadaqzaqssu Date: December 16, 2014 Contractor: Thad Gerardi Tmg 8 K Street Llc Albert Winfield Client: Tmg 8 K Street Llc | Permit type: Electrical | Permit status: Completed | Permit id: E45824473 | |||||
SCORE 96 Electrical Date: March 30, 2012 Contractor: Paul E Warren Permit status: Completed | Permit id: E1204777 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilduxhuuor9d8lpyzgm947rc Date: January 22, 2013 Permit type: Electrical | Permit status: Permit issued | Permit id: E99625688 | |||||
SCORE 96 Electrical Date: March 21, 2013 Contractor: Fred Latimore Permit status: Permit issued | Permit id: E1303944 | |||||
SCORE 96 Mechanical Date: March 13, 2013 Contractor: Kewal K. Khatta Permit status: Permit issued | Permit id: M1301124 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilf22ix5fowd5yxq6rumle9t Date: March 13, 2013 Contractor: Doris Daye Jbg Companies Paul Warren Client: Jbg Companies | Permit type: Electrical | Permit status: Completed | Permit id: E68360388 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilf22ix5fowd5zxj1vanq4%2fa Date: March 7, 2013 Client: Jbg Companies Jbg Companies | Permit type: Electrical | Permit status: Completed | Permit id: E72645643 | |||||
SCORE 56 Tailoring shop at first floor. Low partition 2 changing enclosures 1 mop sink some additional outlets as needed replacement existing lighting with new ones as needed for tailor work Date: August 8, 2013 Contractor: Yong Kee Kim Client: Yong Kee Kim | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1305096 | |||||
SCORE 100 Revision to permit number b1209319. Work to include mechanical,and electrical. Date: February 6, 2013 Contractor: George Delgado Client: Jbg Companies | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1303709 | |||||
SCORE 96 Electrical Date: March 30, 2012 Contractor: Paul E Warren Permit status: Completed | Permit id: E1204777 | |||||
SCORE 96 Mechanical Date: March 13, 2013 Contractor: Kewal K. Khatta Permit status: Permit issued | Permit id: M1301124 | |||||
SCORE 96 Electrical Date: March 21, 2013 Contractor: Fred Latimore Permit status: Permit issued | Permit id: E1303944 | |||||
SCORE 93 Provide swing stage access to perform caulking and coating of faade elements. Date: October 20, 2014 Contractor: The Atlantic Company Of America, In Client: The Meridian Group, Inc. | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sc1500006 | |||||
SCORE 93 Expansion joint repairs - partial depth top surface concrete repairs and waterproofing membrane replacement Date: November 6, 2015 Contractor: John Pan Client: Lincoln Property Company | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1601390 | |||||
SCORE 56 We will perform a total of two soil borings on the proposed site. Each of the borings will be advanced to a depth of feet below the existing lowest garage floor level, and will be located within the bounds of the private property. The borings will be drilled utilizing 3. 25-inch hollow stem, continuous flight augers. The borings will be performed utilizing an atv-mounted drill rig and will generate an approximate 6-inch annulus. After geotechnical exploration is completed, the borings will be backfilled with bentonite slurry, which has a consistency of two pounds bentonite powder to one gallon water. Borehole abandonment will be performed by tremie-grouting via a positive-displacement pump from the bottom of the borehole. Date: June 22, 2015 Client: Tmg 8 K Street Llc The Meridian Group C O Cumming Corporation | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500323 | |||||
SCORE 96 Electrical Date: May 15, 2015 Contractor: Daniel O White Client: Tmg 8 K Street Llc | Permit status: Permit issued | Permit id: E1505878 | |||||
SCORE 56 Interior only non-structural demo on the 12th floor. Date: January 4, 2016 Contractor: Tmg 8 K St Llc Client: Tmg 8 K Street Llc | Permit type: Demolition | Permit status: Permit issued | Permit id: D1600178 | |||||
SCORE 61 Floor interior demolition of level 4, 5 and 6. Existing space is currently a warm lit shell. Demolition work will include, but not limited to, demolition of partitions, doors, mechanical, electrical, plumbing and associated finish materials as indicated on plans. 32,622 sqft Date: February 2, 2017 Contractor: Brandon Shores; Brandon Shores Msc Client: Tmg 8 K St, Llc | Permit type: Demolition | Permit status: Permit issued | Permit id: D1700159 | |||||
SCORE 56 Temporary egress plans required to facilitate building permits b1613237 approved and revision under review b1700115. See cover sheet for specific phasing diagrams required for occupied renovation. These plans are a follow up to a meeting with mr. Sydney lester and mr. Silroy brown. For meeting level which is the 1st level below grade, 4th floor of north building, and 10th floor of the octagon building. Date: April 26, 2017 Contractor: Tmg 8 K Street Llc; Brandon Shores Msc Client: Tmg 8 K Street Llc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1707181 | |||||
SCORE 56 Concrete repairs in parking garage Date: March 20, 2017 Client: Anthem Row Owners Association Lincoln Property Company | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1704746 | |||||
SCORE 59 Level three alteration of existing 8 k street north office building consisting of full facade replacement, structural reconfiguration of portions of the existing frame of the north building. Development of a retail base on the first three floors. New mechanical and electrical system in the 8 k north building. Modernization of existingpassenger elevators and installation of new passenger elevators. Date: May 17, 2017 Contractor: Tmg 8 K St, Llc; David Fontana Msc Client: Tmg 8 K St, Llc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1700115 | |||||
SCORE 59 Partial demolition of existing 8 k street north office building consisting of full facade, partial demolition of slab for future reconfiguration of portions of the existing frame of the north building. Demolition mechanical, plumbing and electrical system in the 8 k north building. Demolition of existing garage passenger elevators. Strengthening of foundation. Other new work to be under separate permit. Tpr Date: January 19, 2017 Contractor: Tmg 8 K St, Llc; David Fontana Msc Client: Tmg 8 K St, Llc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1613237 | |||||
SCORE 74 After hours work from 7pm to 7am as requested by neighboring hotel. See attached letter Date: June 6, 2017 Contractor: Brandon S Shores Client: Tmg 8 K Street Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700884 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilf22ix5fowd5yxq6rumle9t Date: March 13, 2013 Contractor: Doris Daye; Jbg Companies; Paul Warren Client: Jbg Companies | Permit type: Electrical | Permit status: Completed | Permit id: E68360388 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilf22ix5fowd5zxj1vanq4%2fa Date: March 7, 2013 Client: Jbg Companies Jbg Companies | Permit type: Electrical | Permit status: Completed | Permit id: E72645643 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilduxhuuor9d8lpyzgm947rc Date: January 22, 2013 Permit type: Electrical | Permit status: Permit issued | Permit id: E99625688 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilcdff%2fkh5jxxzadaqzaqssu Date: December 16, 2014 Client: Tmg 8 K Street Llc | Permit type: Electrical | Permit status: Completed | Permit id: E45824473 | |||||
SCORE 56 Interior demo and bulid-out of levels 4,5, and 6. Space is currently warm lit shell. 32,622 sqft Date: June 13, 2017 Client: Tmg 8 K Street Llc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1705915 | |||||
SCORE 74 Revisions to issued permit b1707181 to match field conditions per inspector mark kaheler. Date: July 7, 2017 Contractor: Brandon S Shores Client: Tmg 8 K Street Llc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1709730 | |||||
SCORE 74 After hours work from 7pm to 7am as requested by neighboring hotel. See attached letter previous ah: ah1701009 Date: July 28, 2017 Contractor: Brandon S Shores Client: Tmg 8 K Street Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1701092 | |||||
SCORE 74 After hours work from 7pm to 7am as requested by neighboring hotel. See attached letter previous ah: ah1700884 Date: June 30, 2017 Contractor: Brandon S Shores Client: Tmg 8 K Street Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1701009 | |||||
SCORE 96 Electrical Date: June 28, 2017 Contractor: Joseph J Flynn Client: Tmg 8 K Street Llc | Permit status: Permit issued | Permit id: E1707809 | |||||
SCORE 96 Electrical Date: July 12, 2017 Contractor: Joseph J Flynn Client: Tmg 8 K Street Llc | Permit status: Permit issued | Permit id: E1708211 | |||||
Plumbing and gas Date: June 29, 2017 Client: Tmg 8 K Street Llc | Permit status: Permit issued | Permit id: P1707114 | |||||
SCORE 92 Electrical Date: August 19, 2013 Contractor: Kuhwa Lee Permit status: Completed | Permit id: E1307781 | |||||
SCORE 92 Electrical Date: August 19, 2013 Contractor: Kuhwa Lee Permit status: Completed | Permit id: E1307781 | |||||
SCORE 92 Electrical Date: August 19, 2013 Contractor: Kuhwa Lee Permit status: Completed | Permit id: E1307781 | |||||
SCORE 96 Adjustment to e1303944 Date: March 22, 2013 Contractor: Fred Latimore Permit type: Electrical | Permit status: Permit issued | Permit id: E1303975 | |||||
SCORE 96 Electrical Date: March 22, 2013 Contractor: Fred Latimore Permit status: Permit issued | Permit id: E1303976 | |||||
SCORE 96 Electrical Date: March 22, 2013 Contractor: Fred Latimore Permit status: Permit issued | Permit id: E1303976 | |||||
SCORE 96 Electrical Date: March 22, 2013 Contractor: Fred Latimore Permit status: Permit issued | Permit id: E1303976 | |||||
SCORE 96 Plumbing and gas Date: February 7, 2013 Contractor: Charles M. Chisley Permit status: Completed | Permit id: P1302722 | |||||
SCORE 96 Plumbing and gas Date: August 19, 2013 Contractor: Franklin T Gaines Permit status: Completed | Permit id: P1307282 | |||||
SCORE 96 Plumbing and gas Date: February 7, 2013 Contractor: Charles M. Chisley Permit status: Completed | Permit id: P1302722 | |||||
SCORE 96 Plumbing and gas Date: August 19, 2013 Contractor: Franklin T Gaines Permit status: Completed | Permit id: P1307282 | |||||
SCORE 96 Plumbing and gas Date: February 7, 2013 Contractor: Charles M. Chisley Permit status: Completed | Permit id: P1302722 | |||||
SCORE 96 Plumbing and gas Date: August 19, 2013 Contractor: Franklin T Gaines Permit status: Completed | Permit id: P1307282 | |||||
SCORE 99 Upgrade 2 amp service to 4 amp and install outlets in eleventh floor server room. Install ductwork and ac equipment on eleventh floor. Date: November 12, 2014 Contractor: Tanya Hill Client: Tmg 8 K Street, Llc | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1501482 | |||||
SCORE 92 Electrical Date: November 12, 2014 Contractor: Albert E Winfield Permit status: Permit issued | Permit id: E1501099 | |||||
SCORE 92 Electrical Date: November 12, 2014 Contractor: Albert E Winfield Permit status: Permit issued | Permit id: E1501099 | |||||
SCORE 92 Electrical Date: November 12, 2014 Contractor: Albert E Winfield Permit status: Permit issued | Permit id: E1501099 | |||||
SCORE 86 Mechanical Date: November 12, 2014 Contractor: Nevin Arthur Camp Permit status: Completed | Permit id: M1500395 | |||||
SCORE 86 Mechanical Date: November 12, 2014 Contractor: Nevin Arthur Camp Permit status: Completed | Permit id: M1500395 | |||||
SCORE 86 Mechanical Date: November 12, 2014 Contractor: Nevin Arthur Camp Permit status: Completed | Permit id: M1500395 | |||||
SCORE 86 Mechanical Date: November 12, 2014 Contractor: Nevin Arthur Camp Permit status: Completed | Permit id: M1500395 |