Content |
---|
SCORE 96 Moving truck ![]() ![]() Permit status: Permit expired | Expiration date: July 26, 2016 | Permit id: Pa10327007 |
SCORE 96 Moving truck ![]() ![]() Permit status: Expired | Expiration date: November 14, 2014 | Permit id: Pa10166977 |
SCORE 96 Moving truck ![]() ![]() Permit status: Permit expired | Expiration date: October 9, 2014 | Permit id: Pa10162541 |
SCORE 56 Moving truck ![]() ![]() Permit status: Permit expired | Expiration date: June 30, 2014 | Permit id: Pa10147549 |
SCORE 95 Connect 8 evarts street, n. E. With underground service by building 29 of service conduit from an existing manhole also abandon service conduit; sidewalk of evarts street east of north capitol street, n. E. As indicated on the attached prints. 53340018 tcp #3 cut #26889 (gjn) ![]() ![]() Permit type: Excavation; electric connection (trench) | Permit status: Cancel/withdrawn | Expiration date: February 20, 2011 |
SCORE 87 Other reserved parking ![]() ![]() Permit status: Expired | Expiration date: June 18, 2010 | Permit id: Pa10006241 |
SCORE 87 Replace defective sewer line from property line to the sidewalk; attached plans and conditions are part of this permit; traffic contrpl plan (tcp) expiration date same as public space permit expiration date; must contact system inspection oversight division (siod) before permanent restoration of public space at 202-645-7050; must apply and obtain occupancy permit before start of work. ![]() ![]() Permit type: Excavation; clean out (sewer), excavation; sewer lateral connection over 4" pipe (trench) | Permit status: Permit expired | Expiration date: August 24, 2010 | Permit id: Pa55762 |
SCORE 95 Excavation; electric connection (trench) ![]() Permit status: 3 | Expiration date: February 20, 2011 | Permit id: 0 |
SCORE 95 Excavation; electric connection (trench) ![]() Permit status: 3 | Expiration date: February 20, 2011 | Permit id: 0 |
Contractor Rank | Contractor Details | Number of Projects | Avg. Project Cost | Years in Business | Photos |
---|---|---|---|---|---|
SCORE 100 | Washington Gas | 14,031 Projects | $12 Avg. Project Cost | 12 Years in Business | ![]() |
SCORE 100 | John Homick | 272 Projects | 7 Years in Business | ![]() | |
SCORE 99 | Long Fence | 547 Projects | 10 Years in Business | ![]() | |
SCORE 96 | Hanlon Design Build Hanlon Design Build | 59 Projects | $36 Avg. Project Cost | 6 Years in Business | ![]() |
SCORE 93 | Dci Dci | 501 Projects | $70 Avg. Project Cost | 5 Years in Business | ![]() |