Content |
---|
All work under this omo must be done using safe work procedures. At public parts , at bulkhead :- rake out sealed skylight , disposing all in a leg ![]() Permit type: Gc | Permit id: Eg03302 |
Public hall bulkhead. Bulkhead roof: remove the existing sealed covering skylight opening. Remove existing skylight. Supply and install new ![]() Permit type: Gc | Permit id: Ef07705 |
As per rc # 2012142463402 (b & n & k restoration, inc), perform asbestos abatement pursuant to hpd rc specification and title 15, chapter 1, rules of ![]() Permit type: Asbest | Permit id: Ef10465 |
As per mini rc # 2015000226601 (cardno atc), perform polarized light microscopy (plm) gravimetric matrix reduction analysis as per hpd specification o ![]() Permit type: Asbest | Permit id: Ef10124 |
P/hall: 1&1/2 landing: reinstall w/ guard with oneway screws remove all work related debris. ![]() ![]() Permit type: Gc | Permit id: Ed02261 |
P hall: 1&1 2 landing: reinstall w guard with oneway screws remove all work related debris. ![]() ![]() Permit type: Gc | Permit id: Ed02261 |
Perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio ![]() Permit type: Delead | Permit id: Ec12762 |
Perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio ![]() Permit type: Delead | Permit id: Ec08922 |
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio ![]() Permit type: Delead | Permit id: Ec04889 |
Perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio ![]() Permit type: Delead | Permit id: Eb35102 |