Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 New electrical for above ground hot tub Date: November 6, 2014 Contractor: Jd Electric Permit status: In plan check | Permit id: 14000-02887 | |||||
SCORE 92 Main service panel upgrade existing 2 amps service Date: October 14, 2014 Contractor: Freedom Solar Inc Permit status: Permit issued | Permit id: 14000-02698 | |||||
SCORE 92 (13000-02296) change insertion rail to 46mm xl Date: November 19, 2013 Contractor: Freedom Solar Inc Permit status: Permit issued | Permit id: 13rev-00715 | |||||
SCORE 92 13000-02296: revision of type of racking rail for pv install Date: October 23, 2013 Contractor: Freedom Solar Inc Permit status: In plan check | Permit id: 13rev-00652 | |||||
SCORE 92 Install residential photovoltaic system; 31 modules with 9. 6kw Date: August 27, 2013 Contractor: Freedom Solar Inc Permit status: Permit issued | Permit id: 13000-02296 | |||||
SCORE 93 Install new heat pump unit at side yard of corner lot Date: May 30, 2013 Permit status: Permit issued | Permit id: 13000-01452 | |||||
SCORE 92 Remove 39 sq of tar and gravel and replace with mil ib cool roof system Permit status: Permit issued | Permit id: 13000-01317 | |||||
SCORE 86 Remove roof. Install osb roof sheathing, felt, class a lifetime fiberglass shingles. Permit status: Permit issued | Permit id: 12000-02472 | |||||
Kitchen remodel Date: September 7, 2012 Permit status: Permit issued | Permit id: 12000-02237 | |||||
SCORE 59 Residential remodel includes kitchen and restroom remodels and complete interior refresh 2800sf. New restroom window on 2nd floor. Permit status: In plan check | Permit id: 15000-01668 | |||||
SCORE 93 Reconfigure laundry and bathroom. Convert from full bath to half bath. Area of work 130sf Permit status: Finaled | Permit id: 17000-00217 |