Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Remove 5 poles and remove 5 of wire on rhode island avenue, south of 8th place n. E. As indicated on the attached prints. Wr#3373873. Applicant must follow desgin manual and 2007 blue book per ali zamani, within permit office-ipma/streetlight. Applicant must adhere to typical/tcp and have available for inspection by ddot/siou upon request. 1 calendar days (umair zia 202-388-2235) (uzia@pepco. Com) (dang/tle) Date: December 12, 2011 Contractor: Pepco Permit type: Over head work; pole removal (single or first one), over head work; pole removal (each addl), over head work; string electrical wire | Permit status: Permit expired | Expiration date: July 12, 2012 | Permit id: Pa67864 | |||||
SCORE 95 A suspended roadway letter was received install (1) 6x14, and (2) 6x18 manhole./ connect 8 block of rhode island ave ne w/ug service by building 1156 ft of service conduit and misc equipment on sidewalk of 8 block of rhode island ave ne as indicated on attached prints. Wr# 3476793 - kdantzler - dac Date: February 11, 2016 Contractor: Pepco Holdings Inc Permit type: Excavation; electric connection (trench), excavation; manhole installation | Permit status: Assigned | Expiration date: May 12, 2016 | |||||
SCORE 95 Install 141 ft of electrical wire at 8 block of rhode island ave ne as indicated on attached prints. Wr# 3476793 - kdantzler - dac Date: February 11, 2016 Contractor: Pepco Holdings Inc Permit type: Over head work; string electrical wire | Permit status: Revise and resubmit | Expiration date: September 12, 2016 | |||||
SCORE 95 A suspended roadway letter was received install (1) 6x14, and (2) 6x18 manhole./ connect 8 block of rhode island ave ne w/ug service by building 1156 ft of service conduit and misc equipment on sidewalk of 8 block of rhode island ave ne as indicated on attached prints. Wr# 3476793 - kdantzler - dac Date: February 11, 2016 Contractor: Pepco Holdings Inc Permit type: Excavation; electric connection (trench), excavation; manhole installation | Permit status: Revise and resubmit | Expiration date: November 10, 2016 | |||||
SCORE 95 Install 141 ft of electrical wire at 8 block of rhode island ave ne as indicated on attached prints. Wr# 3476793 - kdantzler - dac Date: February 11, 2016 Contractor: Pepco Holdings Inc Permit type: Over head work; string electrical wire | Permit status: Revise and resubmit | Expiration date: September 12, 2016 | |||||
SCORE 95 A suspended roadway letter was received install (1) 6x14, and (2) 6x18 manhole. Connect 8 block of rhode island ave ne w ug service by building 1156 ft of service conduit and misc equipment on sidewalk of 8 block of rhode island ave ne as indicated on attached prints. Wr# 3476793 - kdantzler - dac Date: February 11, 2016 Contractor: Pepco Holdings Inc Permit type: Excavation; electric connection (trench), excavation; manhole installation | Permit status: Revise and resubmit | Expiration date: November 10, 2016 | |||||
SCORE 95 Manhole access 11 days Contractor: Pepco Holdings Inc Permit status: Notpaid | Expiration date: November 1, 2012 | Permit id: 0 | |||||
SCORE 95 Manhole access 11 days Date: November 19, 2010 Contractor: Pepco Holdings Inc Permit status: Expired | Expiration date: December 6, 2010 | Permit id: Pa10016797 | |||||
SCORE 96 Enp for ddot contractors Date: April 17, 2014 Contractor: Ddot Delante Toyer Permit status: Expired | Expiration date: May 10, 2014 | Permit id: Pa10137069 | |||||
SCORE 95 Excavation; electric connection (trench), excavation; manhole installation Contractor: Pepco Holdings Inc Permit status: 3 | Expiration date: November 10, 2016 | Permit id: 0 | |||||
SCORE 95 Over head work; string electrical wire Contractor: Pepco Holdings Inc Permit status: 3 | Expiration date: September 12, 2016 | Permit id: 0 | |||||
SCORE 100 Construction staging area Date: May 3, 2016 Contractor: Washington Gas Permit status: Expired | Expiration date: June 2, 2016 | Permit id: Pa10250561 | |||||
SCORE 99 Construction staging area Date: August 4, 2016 Contractor: Fort Myer Construction Permit status: Expired | Expiration date: September 1, 2016 | Permit id: Pa10326179 | |||||
SCORE 89 Enp for ddot contractors Date: February 27, 2017 Contractor: Geocapitol Engineering Llc Permit status: Expired | Expiration date: April 30, 2017 | Permit id: Pa10378367 | |||||
SCORE 99 Construction staging area Contractor: Fort Myer Construction Permit status: Approved | Expiration date: July 28, 2017 | Permit id: 0 | |||||
SCORE 99 Construction staging area Date: September 1, 2016 Contractor: Fort Myer Construction Permit status: Permit expired | Expiration date: October 1, 2016 | Permit id: Pa10326179-R1 | |||||
SCORE 100 Construction staging area Date: June 1, 2016 Contractor: Washington Gas Permit status: Permit expired | Expiration date: July 1, 2016 | Permit id: Pa10276179 | |||||
SCORE 99 Construction staging area Date: January 31, 2017 Contractor: Fort Myer Construction Permit status: Permit expired | Expiration date: March 2, 2017 | Permit id: Pa10372368 | |||||
SCORE 99 Construction staging area Contractor: Fort Myer Construction Permit status: Approved (pending payment | Expiration date: July 28, 2017 | Permit id: 0 | |||||
SCORE 95 Remove 5 poles and remove 5 of wire on rhode island avenue, south of 8th place n. E. As indicated on the attached prints. Wr#3373873. Applicant must follow desgin manual and 2007 blue book per ali zamani, within permit office-ipma/streetlight. Applicant must adhere to typical/tcp and have available for inspection by ddot/siou upon request. 1 calendar days (umair zia 202-388-2235) (uzia@pepco. Com) (dang/tle) Date: December 12, 2011 Contractor: Pepco Permit type: Over head work; pole removal (single or first one), over head work; pole removal (each addl), over head work; string electrical wire | Permit status: Permit expired | Expiration date: July 12, 2012 | Permit id: Pa67864 | |||||
SCORE 95 Remove 5 poles and remove 5 of wire on rhode island avenue, south of 8th place n. E. As indicated on the attached prints. Wr#3373873. Applicant must follow desgin manual and 2007 blue book per ali zamani, within permit office-ipma streetlight. Applicant must adhere to typical tcp and have available for inspection by ddot siou upon request. 1 calendar days (umair zia 202-388-2235) (uzia@pepco. Com) (dang tle) Date: December 16, 2011 Contractor: Pepco Permit status: Permit expired | Expiration date: July 12, 2012 | Permit id: Pa67864 | |||||
SCORE 95 Excavation; electric connection (trench), excavation; manhole installation Contractor: Pepco Holdings Inc Permit status: 3 | Expiration date: November 10, 2016 | Permit id: 0 | |||||
SCORE 95 Over head work; string electrical wire Contractor: Pepco Holdings Inc Permit status: 3 | Expiration date: September 12, 2016 | Permit id: 0 | |||||
SCORE 95 Manhole access 11 days Contractor: Pepco Holdings Inc Permit status: Notpaid | Expiration date: November 1, 2012 | Permit id: 0 | |||||
SCORE 99 Construction staging area Date: September 29, 2017 Contractor: Fort Myer Construction Permit status: Issued | Expiration date: October 26, 2017 | Permit id: Pa10465558 | |||||
SCORE 79 Construction staging area Date: April 29, 2015 Contractor: Tom Conlon Permit status: Permit expired | Expiration date: May 22, 2015 | Permit id: Pa10186267 | |||||
SCORE 99 Construction staging area Date: May 1, 2017 Contractor: Fort Myer Construction Permit status: Permit expired | Expiration date: May 29, 2017 | Permit id: Pa10374966-R2 |