Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 96 14000-01690: revise interior layout and reflected ceiling plan, add ada automatic door push plate, scope of work includes changes to electrical and plumbing Date: March 25, 2015 Contractor: Xl Construction Corporation Permit status: Permit issued | Permit id: 15rev-00183 | |||||
SCORE 96 Palo alto medical foundation ti on first basement garage level at jamplis building: 4307 sf repair and remodel Permit status: Permit issued | Permit id: 14000-01690 | |||||
SCORE 81 Palo alto medical foundation: install (3) (n) dedicated electrical circuits. Date: January 8, 2015 Contractor: Wink Enterprises Inc Permit status: Permit issued | Permit id: 15000-00067 | |||||
SCORE 70 16000-02982: add an additional accessible drinking fountain at a level. And replace grab bar and toilet paper dispenser in the bathroom at a level. Date: February 24, 2017 Contractor: F T G Builders Inc Permit status: Permit issued | Permit id: 17rev-00109 | |||||
SCORE 100 Underground parking garage lighting retrofit: one for one replacement of (e) hid and fluorescent fixtures with (n) led or ceramic metalhalide kits contractor to provide plans in field during inspection Date: June 23, 2014 Contractor: Palmer Electric Inc Permit status: Permit issued | Permit id: 14000-01519 | |||||
SCORE 100 Lighting retrofit at parking garage: one for one replacement of (e) hid and fluorescent fixtures with (n) led or ceramic metalhalide kits Date: June 23, 2014 Contractor: Palmer Electric Inc Permit status: Permit issued | Permit id: 14000-01518 | |||||
SCORE 100 Site lighting retrofit: one for one replacement of (e) hid and fluorescent fixtures with (n) led or ceramic metalhalide kits Date: June 23, 2014 Contractor: Palmer Electric Inc Permit status: Permit issued | Permit id: 14000-01515 | |||||
SCORE 81 Palo alto medical foundation: add a dedicated amp circuit for a copy machine on the third floor Date: May 2, 2014 Contractor: Wink Enterprises Inc Permit status: Permit issued | Permit id: 14000-01038 | |||||
SCORE 96 Palo alto medical foundation: remodel of existing surge center on level a Permit status: Permit issued | Permit id: 14000-00155 | |||||
SCORE 75 Replace (2) rack mounted ups with (1) unit in "ce" building it room. Date: January 7, 2013 Contractor: Tdn Electric, Inc Permit status: Permit issued | Permit id: 13000-00067 | |||||
SCORE 76 Move two outlets approx 32" to accomodate new millwork, add one new amp dedicated circuit from electrical room for new pyxis oncology refrigerator in room acw056 Date: August 20, 2013 Contractor: Linehan Electric Permit status: Permit issued | Permit id: 13000-02228 | |||||
SCORE 96 Palo alto medical foundation: replace one (1) ct scanner and move one (1) ct scanner to an adjoining room to replace another ct scanner. Mep plans must be stapled into the revised architectural plans Date: January 23, 2013 Contractor: Lyon Medical Construction Inc Permit status: Permit issued | Permit id: 13000-00240 | |||||
SCORE 96 Minor interior remodeling of an existing clinical space (1st & 2nd floor of lee bldg and 1st floor of jamplis bldg) 1 14 13: applicant added new plumbing and electrical sheets instead of deferred submittal (not in original set), to be slip sheeted by applicant upon resubmittal for building set. Date: December 21, 2012 Contractor: Lyon Medical Construction Inc Permit status: Permit issued | Permit id: 12000-03125 | |||||
SCORE 97 Relocate electrical receptalce Date: October 26, 2012 Contractor: B C Electric Permit status: Permit issued | Permit id: 12000-02674 | |||||
SCORE 75 Replacement of an existing radiotherapy linear accelerator and casework. Date: August 3, 2012 Contractor: Colin Construction Company Inc Permit status: Permit issued | Permit id: 12000-01913 | |||||
SCORE 96 Palo alto medical foundation: convert 1 sf office to exam room. Associated electrical mechanical and plumbing. Date: June 4, 2012 Contractor: Lyon Medical Construction Inc Permit status: Permit issued | Permit id: 12000-01290 | |||||
SCORE 75 Install one (1) new outlet Date: April 9, 2012 Contractor: Tdn Electric, Inc Permit status: Permit issued | Permit id: 12000-00794 | |||||
SCORE 96 Voluntary accessibility upgrades (barrier removal) for existing tenant scope of work includes van access parking, signage, restriping parking lot, truncated domes, and curb ramps Permit status: Permit issued | Permit id: 15000-01396 | |||||
SCORE 76 Install new dedicated amp circuit for new equipment. Level a Date: March 15, 2017 Contractor: Linehan Electric Permit status: Permit issued | Permit id: 17000-00552 | |||||
SCORE 93 Interior non-structural demo at a level (11,6 sf) for (e) tenant, "palo alto medical foundation inc" Date: November 29, 2017 Contractor: Tcg Builders Inc Permit status: Permit issued | Permit id: 17000-02847 | |||||
SCORE 70 Palo alto medical foundation: t. I. To include remodel of dressing rooms on (level a) from 3 spaces to 2 spaces, remodel drinking fountain configuration (levels 1-3) to meet code. Changing sink counter in bathroom to meet code requirements ( sf electrical and sf of plumbing) Permit status: Permit issued | Permit id: 16000-02982 | |||||
SCORE 96 Ti existing tenant: pamf - sub-dividing an existing space on level "a" with new wall, include new door, hvac and electrical modifications Permit status: Permit issued | Permit id: 17000-00765 | |||||
SCORE 96 Office tenant imrpovement 1500sf on 2nd floor includes interior remodel for exsting firm "palo alto medical foundation inc" Permit status: Finaled | Permit id: 16000-02228 | |||||
SCORE 98 Bldg c: replace existing ton chiller in parking garage Permit status: Permit issued | Permit id: 16000-02837 | |||||
SCORE 81 Palo alto medical foundation, lee building: replace exit lighting on the third floor ( exit lights) Date: October 7, 2016 Contractor: Wink Enterprises Inc Permit status: Permit issued | Permit id: 16000-02523 | |||||
SCORE 96 Existing tenant palo alto medical foundation relocate and expand the pharmacy ames building area of work 930sf scope of work includes 2 new rtu Permit status: Permit issued | Permit id: 17000-01983 | |||||
SCORE 71 Install 3 dedicated circuits for new work stations Date: November 14, 2017 Contractor: Eb Electrical Inc Permit status: Permit issued | Permit id: 17000-02737 | |||||
SCORE 76 Dedicated (1) circuit for (1) 1 volt outlet finance department office. Date: November 30, 2017 Contractor: Linehan Electric Permit status: Permit issued | Permit id: 17000-02857 | |||||
SCORE 93 Level a: remodel on the basement level (10,6 sf) for existing tenant "palo alto medical foundation". Scope of work includes replacement of one rooftop unit. Plans need to be stamped with zoning stamps on cover sheets Permit status: In plan check | Permit id: 17000-03079 |