Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 74 Removal of two existing windows, remove existing header, install new header to accomodate two larger horizontal dimensioned windows -- see engineering for specifics. Relocate subpanel back into main panel. Client: Eugene Bernard,Shana Solomon | Applicant: Flatirons Energy, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: July 19, 2010 | Current use: Single family d | |||||
SCORE 74 Installation of a gas insert in the basement fireplace; remove existing basement flue and install new sidewall vent for new insert in basement; replace gas line for existing gas fireplace on main level. ![]() ![]() Client: Eugene Bernard,Shana Solomon | Applicant: Flatirons Energy, Inc. | Permit type: Mechanical | Permit status: Cmp | Completion date: October 18, 2010 | Current use: Single family d | |||||
Emergency gas repair job #12339297 Client: Eugene Bernard | Permit type: Right-of-way | Permit status: Act | Permit id: Pmt2016-00553 | |||||
SCORE 95 Remodel project to the lower level (2nd time basement finish) and the main level. Work includes: removal elimination of a rear inchmid-deckinch, replacement of the walking surface of the remaing rear deck, and installation of 5 helical piers along the front of the home. Scope of work includes associated meps, to include a new gas fireplace and bathroom fan vents. Client: Eugene Bernard | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: October 6, 2016 | Current use: Single family detached dwelling, remodel | Permit id: Pmt2016-01745 | |||||
SCORE 95 Interior non-structural demolition (only) in association with pmt2016-01745 ![]() ![]() Client: Eugene Bernard | Permit type: Demolition | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-01747 | |||||
SCORE 100 Tear-off & reroof of sfd (pitched roof areas only), 18 squares of asphalt shingles on a pitch represented as 5 12. All roof materials shall be installed per manufacturerfoots specs. Mid-roof inspection required if pitch is less than 4 12. Client: Eugene Bernard | Permit type: Roofing | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-01930 | |||||
SCORE 95 Installation of a replacement forced-air furnace. Client: Eugene Bernard | Permit type: Mechanical | Permit status: Cmp | Completion date: June 27, 2016 | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-02195 | |||||
SCORE 74 Removal of two existing windows, remove existing header, install new header to accomodate two larger horizontal dimensioned windows -- see engineering for specifics. Relocate subpanel back into main panel. Client: Eugene Bernard | Permit type: Building, electrical | Permit status: Cmp | Completion date: July 19, 2010 | Current use: Single family detached dwelling, alterat | Permit id: Pmt2010-02409 | |||||
SCORE 74 Installation of a gas insert in the basement fireplace; remove existing basement flue and install new sidewall vent for new insert in basement; replace gas line for existing gas fireplace on main level. Client: Eugene Bernard | Permit type: Mechanical | Permit status: Cmp | Completion date: October 18, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-04366 | |||||
Emergency gas repair job #12339297 Client: Eugene Bernard | Permit type: Right-of-way | Permit status: Act | Permit id: Pmt2016-00553 | |||||
Emergency gas repair job #12339297 Client: Eugene Bernard | Permit type: Right-of-way | Permit status: Act | Permit id: Pmt2016-00553 |