Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Dock Date: September 27, 2005 Contractor: Core General Contracting Llc Permit type: Dock | Permit status: Closed | Permit id: 2005044542 | |||||
SCORE 95 Service change wireing boat lift Date: February 12, 2007 Contractor: Lucien A Pelletier Permit type: Electrical | Permit status: Closed | Permit id: 2006121157 | |||||
SCORE 95 Install of limestone rip-rap on bank Date: October 10, 2007 Contractor: M And M Marine Construction Inc Permit type: Building/accessories/residential/seawall | Permit status: Closed | Current use: Residential | Permit id: 2007020628 | |||||
SCORE 95 Install boat hoist in existing mooring area orig #2005044542 Date: April 29, 2008 Contractor: M And M Marine Construction Inc Permit type: Building/accessories/residential/boatlift | Permit status: Closed | Current use: Residential | Permit id: 2007020627 |