Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Camden parking lot. Install replacement 100amp single phase replacement meter socket that burnt out. Permit type: Electrical | Current use: Comm | Permit id: E432746 | |||||
SCORE 100 Camden parking lot. Install replacement 100amp single phase replacement meter socket that burnt out. Permit type: Electrical permit | Expiration date: June 8, 2015 | Current use: Comm | Permit id: E432746 | |||||
Gas leak repair; 5x4; rdwy ![]() Permit type: Emergency excavation permit | Expiration date: December 1, 2015 | Permit id: Emer-533320 | |||||
To conduct the following: install temporary generator ;480;gallons of diesel fuel ;3 kw ![]() Permit type: Bfd general permit | Permit id: Gp421886 | |||||
Bfd chemist certificate proces ![]() Permit id: Chm321527 | |||||
Install (5); 2" test borings in sdwk; 9:30am-3;30pm; boston police detail area d; 343-4210; (1) ![]() Permit type: Capital improvement | Permit status: Expired | Permit id: Exca-605784 | |||||
Excavation permit ![]() Permit type: Capital improvement | Permit id: Exca-605784 | |||||
SCORE 100 Begin construction mobilization of work permitted under alt permit pending excavation grade beams selective demolition. Northeastern university squash busters @ carter field Permit type: Renovations - exterior | Permit status: Open | Current use: Comm | Permit id: Sf706428 | |||||
SCORE 100 Demolition of existing finishes drywall millwork and storefront system for ne renovation. All work will be in full compliance with 7 cmr 527 cmr 521 cmr fee paid under alt Permit type: Demolition - interior | Permit status: Open | Current use: Comm | Permit id: Sf694519 | |||||
SCORE 95 An addition is being added to the first floor of this building in which added and relocated fire alarm devices will be installed. Also some work will be done on third floor regarding adding and relocating devices. Also a new fire alarm control panel will be added on the first floor. Permit type: Fire alarm | Permit status: Open | Current use: Comm | Permit id: Efa703601 | |||||
SCORE 95 A renovation of the first floor of this building with an intent to expand the floor is being conducted. New power outlets and lighting is being installed and relocated on this floor along with the third floor and roof. On the roof a new accu will be installed. On the first floor a new 125a panel will be added. Being fed from an existing panel. Also 6 floor boxes will be installed in the first floor slab. Permit type: Electrical | Permit status: Open | Current use: Comm | Permit id: E703602 | |||||
SCORE 100 This project consists of interior renovations to northeastern universitys parking garage located at 795 columbus ave. The scope of work includes remove of existing chain link fence installation of new fence new bike racks and installation of 9 new car charging stations. Permit type: Renovations -interior nsc | Permit status: Open | Current use: Comm | Permit id: Sf730850 | |||||
SCORE 100 Drill 5 geoprobes on the sidewalk Permit type: Excavation borings test pits | Permit status: Expired | Current use: Comm | Permit id: Sf604213 | |||||
SCORE 100 Camden parking lot. Install replacement 100amp single phase replacement meter socket that burnt out. Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E432746 | |||||
SCORE 100 Drill 5 geoprobes on the sidewalk Permit type: Short form bldg permit | Expiration date: December 21, 2016 | Current use: Comm | Permit id: Sf604213 | |||||
SCORE 100 Camden parking lot. Install replacement 100amp single phase replacement meter socket that burnt out. Permit type: Electrical permit | Expiration date: June 8, 2015 | Current use: Comm | Permit id: E432746 | |||||
Install (5); 2" test borings in sdwk; 9:30am-3;30pm; boston police detail area d; 343-4210; (1) ![]() Permit type: Excavation permit | Expiration date: July 7, 2016 | Permit id: Exca-605784 | |||||
Gas leak repair; 5x4; rdwy ![]() Permit type: Emergency excavation permit | Expiration date: December 1, 2015 | Permit id: Emer-533320 | |||||
To conduct the following: install temporary generator ;480;gallons of diesel fuel ;3 kw ![]() Permit type: Bfd general permit | Permit id: Gp421886 | |||||
Bfd chemist certificate proces ![]() Permit id: Chm321527 | |||||
Bfd chemist certificate proces ![]() Permit id: Chm564889 | |||||
SCORE 100 Demolition of existing finishes drywall millwork and storefront system for ne renovation. All work will be in full compliance with 7 cmr 527 cmr 521 cmr fee paid under alt Permit type: Short form bldg permit | Expiration date: November 8, 2017 | Current use: Comm | Permit id: Sf694519 | |||||
SCORE 100 Begin construction mobilization of work permitted under alt permit pending excavation grade beams selective demolition. Northeastern university squash busters @ carter field Permit type: Short form bldg permit | Expiration date: November 8, 2017 | Current use: Comm | Permit id: Sf706428 | |||||
SCORE 95 An addition is being added to the first floor of this building in which added and relocated fire alarm devices will be installed. Also some work will be done on third floor regarding adding and relocating devices. Also a new fire alarm control panel will be added on the first floor. Permit type: Electrical fire alarms | Expiration date: November 10, 2017 | Current use: Comm | Permit id: Efa703601 | |||||
SCORE 95 A renovation of the first floor of this building with an intent to expand the floor is being conducted. New power outlets and lighting is being installed and relocated on this floor along with the third floor and roof. On the roof a new accu will be installed. On the first floor a new 125a panel will be added. Being fed from an existing panel. Also 6 floor boxes will be installed in the first floor slab. Permit type: Electrical permit | Expiration date: November 10, 2017 | Current use: Comm | Permit id: E703602 | |||||
Bfd chemist certificate proces ![]() Permit id: Chm680124 | |||||
SCORE 100 This project consists of interior renovations to northeastern universitys parking garage located at 795 columbus ave. The scope of work includes remove of existing chain link fence installation of new fence new bike racks and installation of 9 new car charging stations. Permit type: Short form bldg permit | Expiration date: January 14, 2018 | Current use: Comm | Permit id: Sf730850 |