Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Remove existing kitchen cabinets, appliances, remove all carpets at entire house. Copmlete bathroom renovations at 1st and 2nd floor bathroom, remove existing fixtures,wall finishes till studs, insulate walls, plumbing work: re rough 2 bathroom and kitchen, install sum pump at basement. Electrical: bathroom fans, gfi, and ceiling lights at bathrooms, at kitchen: 6 reccesed lights and new outlets. Wire for new hvac system. Re finish hardwood floor at 1st floor. Prep and paint entire house and front basement room. Install new kitchen cabinets and bathroom fixtures. New tile at bathrooms. Permit type: Addition/alteration | Completion date: November 6, 2013 | Current use: One-family | Parcel: 10629 | |||||
Remove and replace existing deck with smaller deck Date: December 19, 2014 Value: $23,000 Permit type: Addition/alteration | Completion date: January 5, 2015 | Current use: One-family | Parcel: 10629 | |||||
SCORE 93 Excavation Date: July 12, 2013 Contractor: Commtank Permit id: Exc18299 | |||||
SCORE 88 Remove and replace existing deck with smaller deck Permit type: Addition/alteration | Completion date: January 5, 2015 | Current use: One-family | Permit id: 0 | Parcel: 10629 | |||||
SCORE 99 Remove 2 rear windows. Reframe as needed. Install a 7 anderson sliding door unit. Patch, trim, and paint as needed. Removal of debris Permit type: Addition/alteration | Completion date: June 13, 2016 | Current use: One-family | Permit id: 0 | Parcel: 10629 |