Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 89 Electrical Date: March 30, 2015 Contractor: Talbert Dowling Client: Angela I Thomas | Permit status: Permit issued | Permit id: E1504457 | |||||
SCORE 97 Mechanical Date: July 13, 2015 Contractor: Ralph Jackson Client: Angela I Thomas | Permit status: Permit issued | Permit id: M1502612 | |||||
SCORE 96 Plumbing and gas Date: April 6, 2015 Contractor: Che J Gomez Client: Angela I Thomas | Permit status: Permit issued | Permit id: P1504784 | |||||
SCORE 98 Revision to perint #1505524 floor plan revised, add hvac Date: July 16, 2015 Contractor: Warren Client: Mehmetoglu | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1510172 | |||||
SCORE 100 Interior renovation- framing, drywall, doors, trim, flooring,electrical, mechanical, plumbing, repair rear addition and replacement of ext. Windows and doors. Replace basement slab. Date: March 23, 2015 Contractor: Timothy Warren Client: Mehemglu | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1505524 | |||||
SCORE 86 Interior demolition of non-bearing elements in a space up to 5,0 square feet (464. 5 square meters) Date: March 17, 2015 Contractor: Lezgin Mehmetoglu Client: Lezgin Mehmetoglu | Permit type: Building | Permit status: Permit issued | Permit id: Pc93471093 | |||||
SCORE 89 Electrical Date: March 30, 2015 Contractor: Talbert Dowling Client: Angela I Thomas | Permit status: Permit issued | Permit id: E1504457 | |||||
SCORE 96 Plumbing and gas Date: April 6, 2015 Contractor: Che J Gomez Client: Angela I Thomas | Permit status: Permit issued | Permit id: P1504784 | |||||
SCORE 97 Mechanical Date: July 13, 2015 Contractor: Ralph Jackson Client: Angela I Thomas | Permit status: Permit issued | Permit id: M1502612 |