SCORE 89 Bore 81 feet in right-of-way as follows:42 foot road bore across 159th place ne and 6 feet of unpaved surface trenching. Place two-inch duct and pull through new tv service drop. Date: November 20, 2014 Contractor: Leif Pedersen Applicant: Ricardo Soto | Permit type: Right of way | Permit id: Row-2014-09030 | Parcel: 9270700060 | |||||
Demo - the carter - demolition of existing 17/938 sq. Ft. Structure. Date: March 9, 2015 Value: $50,000 Applicant: Kim Faust | Permit type: Demolition | Permit id: Demo-2015-01373 | Parcel: 9270700060 | |||||
SCORE 56 3 gallon diesel tank at a commercial site prior to building demo Date: March 17, 2015 Contractor: Timothy Ayres Permit type: Fire single-use | Permit id: Fire-2015-01964 | Parcel: 9270700060 | |||||
Temp cap on side sewer for the carter project Date: April 7, 2015 Value: $50,000 Applicant: Kim Faust | Permit type: Side sewer | Permit id: Swr-2015-02482 | Parcel: 9270700060 | |||||
Occupying southbound lane of 159th place ne for second trip - cut and cap existing 3/4-inch stw stub at the main. One 3x5 pavement cut anticipated. Date: April 23, 2015 Permit type: Right of way | Permit id: Row-2015-02339 | Parcel: 9270700060 | |||||
SCORE 59 3 gallon diesel tank at a commercial site prior to building demo Date: March 17, 2015 Contractor: Filco Co. Inc Permit type: Fire single-use | Permit id: Fire-2015-01964 | Parcel: 9270700060 | |||||
SCORE 89 Bore 81 feet in right-of-way as follows:42 foot road bore across 159th place ne and 6 feet of unpaved surface trenching. Place two-inch duct and pull through new tv service drop. Date: November 20, 2014 Contractor: Pacific Cable Construction Inc Applicant: Ricardo Soto | Permit type: Right of way | Permit id: Row-2014-09030 | Parcel: 9270700060 | |||||
SCORE 64 Demo - the carter - demolition of existing 17 938 sq. Ft. Structure. Applicant: Kim Faust | Permit type: Demolition | Permit id: Demo-2015-01373 | Parcel: 9270700060 | |||||
SCORE 82 Temp cap on side sewer for the carter project Applicant: Kim Faust | Permit type: Side sewer | Permit id: Swr-2015-02482 | Parcel: 9270700060 | |||||
Occupying southbound lane of 159th place ne for second trip - cut and cap existing 3 4-inch stw stub at the main. One 3x5 pavement cut anticipated. Date: April 23, 2015 Permit type: Right of way | Permit id: Row-2015-02339 | Parcel: 9270700060 | |||||
SCORE 89 Bore 81 feet in right-of-way as follows:42 foot road bore across 159th place ne and 6 feet of unpaved surface trenching. Place two-inch duct and pull through new tv service drop. Date: November 20, 2014 Contractor: Pacific Cable Construction Inc Applicant: Ricardo Soto | Permit type: Right of way | Permit id: Row-2014-09030 | |||||
SCORE 59 3 gallon diesel tank at a commercial site prior to building demo Date: March 17, 2015 Contractor: Filco Co. Inc Permit type: Fire single-use | Permit id: Fire-2015-01964 | |||||
SCORE 64 Demo - the carter - demolition of existing 17 938 sq. Ft. Structure. Applicant: Kim Faust | Permit type: Demolition | Permit id: Demo-2015-01373 | |||||
SCORE 82 Temp cap on side sewer for the carter project Applicant: Kim Faust | Permit type: Side sewer | Permit id: Swr-2015-02482 |