Content |
---|
SCORE 93 Fully demo existing kitchen down to studs and subloor. Existing framing will remain as is, contractor will create vent opening for new range hood. 3 windows (casement) will be replaced. Back entry door will be replaced. Electrical outlets and wiring will be upgraded to code, new recessed and under cabinet lights will be installed. New sink, dishwasher and icemaker wil be roughed in. Walls will be insulated, boarded and plastered. New cabinets and countertops will be installed per design plans. New wood flooring will be installed, all new walls and trim will be painted. Bathroom will be demolished down to studs and subfloor. New wet wall will be framed for shower. New replaecement window will be installed. Electrical outlets and wiring will be installed to meet code. New ceiling exhaust/light combo will be installed. New tub, toilet, and sink will be roughed in. Walls will be insulated and boared. New floor and shower tile will be installed. All walls ceiling and trim will be painted. E Permit type: Addition/alteration | Completion date: January 16, 2015 | Current use: Two-family | Parcel: 2332002 |
SCORE 93 Fully demo existing kitchen down to studs and subloor. Existing framing will remain as is, contractor will create vent opening for new range hood. 3 windows (casement) will be replaced. Back entry door will be replaced. Electrical outlets and wiring will be upgraded to code, new recessed and under cabinet lights will be installed. New sink, dishwasher and icemaker wil be roughed in. Walls will be insulated, boarded and plastered. New cabinets and countertops will be installed per design plans. New wood flooring will be installed, all new walls and trim will be painted. Bathroom will be demolished down to studs and subfloor. New wet wall will be framed for shower. New replaecement window will be installed. Electrical outlets and wiring will be installed to meet code. New ceiling exhaust light combo will be installed. New tub, toilet, and sink will be roughed in. Walls will be insulated and boared. New floor and shower tile will be installed. All walls ceiling and trim will be painted. E Permit type: Addition/alteration | Completion date: January 16, 2015 | Current use: Two-family | Permit id: 0 | Parcel: 2332002 |
Contractor Rank | Contractor Details | Number of Projects | Avg. Project Cost | Years in Business | Photos |
---|---|---|---|---|---|
SCORE 99 | All Job Construction | 17 Projects | $26,209 Avg. Project Cost | 8 Years in Business | ![]() |
SCORE 99 | The Yoston Group Llc | 15 Projects | $23,239 Avg. Project Cost | 7 Years in Business | ![]() |
SCORE 96 | Power Home Remodeling Group | 22 Projects | $9,772 Avg. Project Cost | 6 Years in Business | ![]() |
SCORE 93 | Nelson Group Construction Corp | 31 Projects | $32,795 Avg. Project Cost | 5 Years in Business | ![]() |
SCORE 93 | R.P.Farina Roofing Co | 62 Projects | $10,527 Avg. Project Cost | 5 Years in Business | ![]() |