Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Repair fire stop at existing mechanical equipment reference cpl2003-00780 Date: May 12, 2003 Contractor: Barday Plumbing And Heating Client: L Dougherty | Applicant: Barday Plumbing & Heating | Permit type: Mechanical | Permit status: N&v | Current use: Multifamily dwe | |||||
SCORE 100 Mechanical permit for replacement of 50kbtu forced air furnace Date: May 4, 2007 Contractor: Climate Masters Service Llc Client: L Dougherty | Applicant: Climate Masters Service, Llc | Permit type: Mechanical | Permit status: N&v | Current use: Multifamily dwe | |||||
SCORE 100 Repair fire stop at existing mechanical equipment reference cpl2003-00780 Client: L Dougherty | Permit type: Mechanical | Permit status: N&v | Current use: Multifamily dwellings, existing | Permit id: Pmt2003-01776 | |||||
SCORE 95 Mechanical permit for replacement of 50kbtu forced air furnace Client: L Dougherty | Permit type: Mechanical | Permit status: N&v | Current use: Multifamily dwellings, existing | Permit id: Pmt2007-01701 | |||||
SCORE 98 Installation of 6-ft tall rod iron fence with gate ( feet long). Date: January 13, 2009 Contractor: Streamline Fence Client: Mary Wynne,Ralph Wynne | Applicant: Streamline Fence | Permit type: Flood fence flood pe | Permit status: N&v | Current use: Multifamily dwe | |||||
SCORE 98 Installation of 6-ft tall rod iron fence with gate ( feet long). Client: Mary Wynne | Permit type: Flood fence flood permit, fence | Permit status: N&v | Current use: Multifamily dwellings, existing | Permit id: Pmt2009-00111 | |||||
SCORE 100 Replacement forced air furnace Date: September 22, 2014 Contractor: H And M Mechanical Llc Client: Monte Cool | Applicant: H&m Mechanical, Llc | Permit type: Mechanical | Permit status: Cmp | Completion date: October 21, 2014 | Current use: Townhomes, exis | |||||
SCORE 56 Flood repair from drain line from third floor unit. Scope of work includes replacement of insulation, drywall, and replacement of cabinets. Separate permit required for plumbing not in scope of this permit. Cpl2015-00247 Client: Nahid Cummins | Applicant: Nahid Cummins | Permit type: Building, electrical | Permit status: Cmp | Completion date: June 4, 2015 | Current use: Multifamily dwe | |||||
SCORE 100 Replacement forced air furnace Client: Monte Cool | Permit type: Mechanical | Permit status: Cmp | Completion date: October 21, 2014 | Current use: Townhomes, existing | Permit id: Pmt2014-20349 | |||||
SCORE 99 Flood repair from drain line from third floor unit. Scope of work includes replacement of insulation, drywall, and replacement of cabinets. Separate permit required for plumbing not in scope of this permit. Cpl2015-00247 Client: Nahid Cummins | Permit type: Building, electrical | Permit status: Cmp | Completion date: June 4, 2015 | Current use: Multifamily dwellings, existing | Permit id: Pmt2015-01366 | |||||
SCORE 95 Interior remodel of condo unit. Scope includes remodel of kitchen and two baths (258 sqft). No net change in plumbing fixtures. Client: Christophe Jordan,Edwina Jordan | Applicant: Touchstone Builders Inc | Permit type: Building, electrical | Permit status: Iss | Current use: Multifamily dwe | |||||
SCORE 95 Interior remodel of condo unit. Scope includes remodel of kitchen and two baths (258 sqft). No net change in plumbing fixtures. Client: Christophe Jordan | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: January 22, 2016 | Current use: Multifamily dwellings, remodel | Permit id: Pmt2015-01197 | |||||
SCORE 95 Flood repair from drain line from third floor unit. Scope of work includes replacement of insulation, drywall, and replacement of cabinets. Separate permit required for plumbing not in scope of this permit. Client: Arapahoe 745.0 | Applicant: Jim Black Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: May 21, 2015 | Current use: Multifamily dwe | |||||
SCORE 95 Replace 3 feet of 2inch abs pipe for kitchen sink drainage. Date: April 23, 2015 Contractor: Nice Guy Plumbing Client: Arapahoe 745.0 | Applicant: Nice Guy Plumbing | Permit type: Plumbing | Permit status: Iss | Current use: Multifamily dwe | |||||
SCORE 99 Flood repair from drain line from third floor unit. Scope of work includes replacement of insulation, drywall, and replacement of cabinets. Separate permit required for plumbing not in scope of this permit. Client: Arapahoe | Permit type: Building, electrical | Permit status: Cmp | Completion date: May 21, 2015 | Current use: Multifamily dwellings, existing | Permit id: Pmt2015-01369 | |||||
SCORE 95 Replace 3 feet of 2inch abs pipe for kitchen sink drainage. Client: Arapahoe | Permit type: Plumbing | Permit status: Iss | Current use: Multifamily dwellings, existing | Permit id: Pmt2015-01500 |