Application if for the erection of an attached structure with maximum height not to exceed 38 feet from grade to the roof and roof deck with access structure not to exceed total area sq. Ft and maximum height feet, rear roof deck on second floor accessed through second floor rear and with celler to use as a four family( multi-family) household living. Details of size and location as shown on the attached. Date: May 5, 2017 Client: Spd Investments Llc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: May 5, 2017 | Permit id: 762385 | |||||
SCORE 100 Installation of an automatic sprinkler system with two inch (2") fire service line, backflow prevention device and fire department connection in accordance with nfpa 13-r throughout a four (4) story structure with basement (six dwelling units, bi-level in upper floors - no standpipes reqd). Separate permits required for all electrical and plumbing work. Date: October 12, 2017 Contractor: Brothers Mechanical Client: Spd Investments Llc | Permit type: Suppression permit | Permit status: Active | Completion date: October 12, 2017 | Permit id: 819616 | |||||
SCORE 89 New construction: interior plumbing; 4 family unit;(4)-story structure; roof deck; 11 wc,3 showers,13 lavs,5 tubs,4 kitchen sinks,4 water heaters and 4 laundry boxes - the installation will comply with the philadephia plubming code 2004 Date: October 27, 2017 Contractor: Anthony A Smith Client: Spd Investments Llc | Permit type: Plumbing permit | Permit status: Active | Completion date: November 3, 2017 | Permit id: 819577 | |||||
SCORE 93 Install 4 hvac units with ductwork (multi-family) Date: September 25, 2017 Contractor: Igs Services Llc Client: Spd Investments Llc | Permit type: Mechanical permit | Permit status: Active | Completion date: October 16, 2017 | Permit id: 819043 | |||||
SCORE 89 Lateral, 1" water service, curb trap, house drian & fai - pa1# 2017-2210077 "self-certifications are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection" Date: August 9, 2017 Contractor: Anthony A Smith Client: Spd Investments Llc | Permit type: Plumbing permit | Permit status: Active | Completion date: September 15, 2017 | Permit id: 807052 | |||||
For the erection of a four (4)-story structure of type va construction with cellar, pilot houses, and roof deck as per plans. Separate permits required for all mechanical, electrical, plumbing and fire suppression work. Date: June 6, 2017 Client: Spd Investments Llc | Permit type: New construction permit | Permit status: Active | Completion date: November 16, 2017 | Permit id: 782128 | |||||
For the complete demolition of a two-story structure as per plan. A covered walkway or sidewalk closure shall be required within 6 feet of building facade in accordance with section 3306 of the ibc. Separate building and or streets department permits may be required. Any deviation will require an amended building permit. Date: April 28, 2017 Client: Spd Investments Llc | Permit type: Demolition permit | Permit status: Completed | Completion date: June 5, 2017 | Permit id: 770839 | |||||
Complete demolition of existing 2-story structure, size, location, extents, means & methods as described in attached demolitionschedule, site safety plans and work contracts (hand demolition). Date: April 28, 2017 Client: Spd Investments Llc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: April 28, 2017 | Permit id: 770838 | |||||
SCORE 96 Seal lateral Date: March 22, 2017 Contractor: Draino Electric Drain Cleaning Client: Spd Investments Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 15, 2017 | Permit id: 768695 |