Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 61 General repairs single-family dwelling repairs to existing single family dwell work to consist of: painting, flooring, sheetrock, bathrm repairs, kitchen reno hvac repairs, electric, non-structural. Date: February 5, 2002 Contractor: Michael Kerrigan Client: Ferrigan, Michael | Permit id: B02000609 | |||||
SCORE 86 Building renovations single-family dwelling interior renovations,sheetrock,paint flooring,replace kitchen cabinets Date: June 11, 2003 Contractor: Celeste Denoux Client: Ferrigan, Michael | Permit id: B03003192 | |||||
SCORE 65 Change of use double residence changing scope of work for b03003192- converting a single into a double as per sketch. Operable windows and smoke detectors shall be provided. Date: October 13, 2003 Contractor: Tim Laurent Client: Ferrigan, Michael | Permit id: B03005466 | |||||
SCORE 98 Electrical rewiring single-family dwelling elbred malone Date: June 26, 2003 Contractor: Elbred Malone Client: Ferrigan, Michael | Permit id: E03005033 | |||||
SCORE 89 Install mechanical equipment single-family dwelling install two 3-ton a c system and gas warm air furnace. Steve sinnott - 885-3410 Date: August 27, 2003 Contractor: Professional Installation Client: Ferrigan, Michael | Permit id: M03005154 | |||||
SCORE 81 Install mechanical equipment double residence install gas line and elec water heater. Ali mesbah 239-7277 Date: October 8, 2003 Contractor: Pars Const. Company Client: Ferrigan, Michael | Permit id: M03006165 | |||||
SCORE 98 Electrical rewiring multi-family dwelling elbred malone Date: October 16, 2003 Contractor: Elbred Malone Client: Reynolds, George A | Permit id: E03008057 | |||||
SCORE 86 Install mechanical equipment double residence install 3-ton condensing unit. Steven sinnott - 885-34 Date: October 17, 2003 Contractor: Steven Sinnott Client: Reynolds, George A | Permit id: M03006376 |